MBTA Draw One Bridge Replacement Project NEPA Draft Environmental Assessment Comment Letter

MBTA Draw One Bridge Replacement Project NEPA Draft Environmental Assessment Comment Letter

January 6, 2025
Re: MBTA Draw One Bridge Replacement Project NEPA Draft Environmental Assessment 
Sent via email: drawone@mbta.com

Dear project team,

My name is Brendan Kearney, and I’m co-executive director of WalkMassachusetts, a statewide pedestrian advocacy organization previously known as WalkBoston. We have followed the slow progression and implementation of the New Charles River Basin Master Plan for decades. The North Station Draw 1 Bridge Replacement project is an important component to the multimodal network of the Boston region, and we want to ensure this location includes the proposed pedestrian and bicycle connection.

The drawbridge crosses over the Charles River directly behind North Station. It currently has two moveable spans with four tracks. Existing piers are supporting the spans already in place. The new drawbridge will have three moveable spans with additional tracks. We are concerned that the current draft of the design for the bridge does not include a pedestrian path, the 2nd of three important pedestrian connections within the Master Plan. This crucial pedestrian and bicycle connection was a commitment by the Commonwealth as part of the Central Artery project mitigation. It should be restored to the project and built on the same timeline as the rail crossing. 

If that is deemed unachievable at this time, please commit to advancing the design and construction plans as well as a funding plan for this important pedestrian/bike connection during the 8-year construction timeline for what is now solely a train drawbridge. 

WalkMassachusetts would like to remind the MBTA, the Executive Office of Environmental Affairs and MassDOT that the North Bank bridge which connects Cambridge and Charlestown and passes underneath the Zakim Bridge was also dropped at one point roughly 20 years ago. At the time, officials were sympathetic, but said the holdup was simply due to lack of funding. As we now know, that bridge is a heavily used, beautiful and well-loved part of the Charles River Reservation.

We should not make the mistake of leaving out the connection between the North Point Park and North Station which will also become a heavily used, and well-loved part of MassDCR’s Charles River Reservation.

Thank you,

Brendan Kearney
Co-Executive Director, WalkMassachusetts

Patch – “Activists Call For Protected Bike Lane On Canal Bridge”

Patch – “Activists Call For Protected Bike Lane On Canal Bridge”

Patch: “Activists Call For Protected Bike Lane On Canal Bridge

“This isn’t a new issue to MassDOT and DCR. Transportation advocates have been discussing safe bike facilities on the Craigie Dam and Longfellow Bridge with state agencies since at least 2009,” said Wendy Landman, executive director of WalkBoston also in a statement. “Not only is this the right action to take for the safety of people biking, it is also the right action for the safety of people walking because it means that bicyclists do not ride on the sidewalk.”

Posted December 19, 2018

Letter to Review Team on Restoration of the River Edge

Letter to Review Team on Restoration of the River Edge

From: WalkBoston, Charles River Conservancy, Charles River Watershed Association

To: MassDOT – officials, staff, consultants Review Team on the I-90 Allston Interchange Improvement Project

Date: August 15, 2018

Re: Charles River – Restoration of the River Edge

On behalf of three organizations committed to the protection of the Charles River and its parklands, public access and pathways, and environmental health we jointly request that MassDOT fulfill its responsibilities to this invaluable resource by analyzing and developing options for the ecological restoration of the severely degraded and eroded riverbank in the I-90 Interchange Project area – from the BU Bridge to the River Street Bridge. This Project directly impacts the Charles River Basin , its parkland, ecology, water quality, and overall resiliency; dealing with those impacts is integral to the Project.

A study by MassDOT in advance of the FEIR should include re-establishment of a more natural edge, bank restoration, stormwater management, and increased floodplain connectivity and storage for resiliency. It should explore at least one alternative that creates better habitat and provides flood storage through the use of fill material in the river to accomplish these objectives. We ask that between now and when the FEIR is produced, a detailed analysis of alternatives, carried out in a collaborative manner, be developed so that results can be incorporated in the FEIR.

The DEIR did not adequately consider the need to restore the river bank, improve the park, and improve water quality. The DEIR has chiefly dealt with these impacts by trying to avoid them on the theory that permitting for the Project would be more difficult if river edge improvements are included. We are convinced that the contrary is true: a serious examination of these improvements would enlist substantial support from organizations, municipalities, and agencies committed to restoring environmental quality in this area – support that will be important to obtaining required approvals.

Restoration of this area requires attention to a number of issues and several important state and federal requirements, including:

1. Protect the river bank from further degradation and restore aquatic and riparian habitat. Much of the existing bank is degraded and eroding, eliminating fish habitat. The Charles is an important fish run for alewives, blueback herring and American shad, migratory fish that return to the river each year to spawn.

2. Provide parkland and improve safe walking and biking conditions as part of multi-modal improvement called for in MassDOT’s Project “purpose and need” statement and under Article 97.

3. Reduce stormwater runoff discharging to the river via overland flows and outfalls, including the 13 outfalls along Soldiers Field Road in the Throat Area. Both MassDOT and DCR have regulatory obligations to comply with phosphorus limits established in the state’s Lower Charles River Basin Nutrient Total Maximum Daily Load (2007).

4. Provide flood resilience, control and storage capacity for precipitation-based inland flooding within the context of current and expected climate change impacts.

5. Develop landscape strategies and designs that provide Section 4(f) mitigation. Removing invasive species, dead trees and replanting with native vegetation, in addition to incorporating green infrastructure, should be integral to the study.

6. Plan for the riverfront parkland, which is a water-dependent use under Chapter 91.

7. Meet historic requirements for the Charles River Reservation in the Charles River Basin Historic District included in Section 106 of the National Historic Preservation Act and Massachusetts Historical Commission review.

8. Comply with the Article 97 no net loss policy that requires replacement of parkland that is to be taken by the Project.

One example of how an alternatives analysis could address these issues is the environmental assessment and recommendations prepared for the North Shore Riverfront Ecosystem Restoration Project in Pittsburgh, PA. It provides extensive river edge improvements, including a natural bank, new pathways, landscaped parklands, connected floodplain, and wetlands. It was developed jointly by local environmental organizations and local, state and federal agencies, including the US Army Corps of Engineers. (https://www.lrp.usace.army.mil/Portals/72/docs/ProjectReviewPlans/N%20Shore%20Riverfront%20DP R%20MSC%20Approved%20for%20Release.pdf?ver=20160524161651743)

We are committed to working cooperatively with you in this process in order to evaluate the options and to achieve results in an expedited and cost-effective manner to restore and enhance this area of the Charles River and the Basin parklands.

We look forward to your response.

Wendy Landman, Executive Director, WalkBoston
Laura Jasinski, Executive Director, Charles River Conservancy
Margaret VanDusen, Deputy Director and General Counsel, Charles River Watershed Association

Please join WalkBoston, the Charles River Conservancy and the Charles River Watershed Association at a “Throat” Walk, September 12, 5:30 PM. We will meet at “BU Beach” behind the Marsh Chapel.

Images from Environmental Assessment of North Shore Riverfront, Pittsburgh

 

Coalition For Anderson Bridge Underpass Letter to Secretary Pollack

Coalition For Anderson Bridge Underpass Letter to Secretary Pollack

COALITION FOR ANDERSON BRIDGE UNDERPASS
c/o Charles River Conservancy, 4 Brattle Street (Suite 309), Cambridge, MA 02138

April 9, 2015

Stephanie Pollack, Secretary of Transportation
Massachusetts Department of Transportation
10 Park Plaza
Boston, MA

Dear Secretary Pollack,

We are writing to let you know of our enthusiasm and support for the work underway at MassDOT to develop 25% design plans for an underpass on the Boston side of the Charles River under the Anderson Memorial Bridge, to be used by pedestrians, runners, cyclists and others. This underpass, through the bridge abutment, would add significantly to the Paul Dudley White pathway system by eliminating the need for many users to cross the busy surface intersection of the ramps from Soldiers’ Field Road and JFK/North Harvard Street.

The underpass would be an extremely important addition to the excellent surface changes now under construction at the Anderson Bridge. This combination of improving the movements – both cross-river (already underway) and along-the-river (with the addition of an underpass) – will increase safety, enhance the environment, and provide improved transportation service not only to the users of the underpass, but also to the vehicles, pedestrians and others who use the surface crossings, including the Harvard community on both sides. We believe that the evolving design is being developed in a manner that respects the historic nature of the bridge.

We strongly oppose the alternative for this project (being developed to comply with legal review as part of the current design process) that would create a boardwalk that would be located under one of the current bridge arches and occupy part of the river used by the boating community.

To maximize cost-effectiveness and maintain the momentum for the underpass project initiated when your predecessor endorsed the project in July 2014, it is our hope that the design and permitting of the underpass can be completed in time to enable its construction as part of the ongoing activities at the bridge. Expediting design and permitting consistent with all legal requirements will be required to accomplish this objective.

As advocates for the project, we have been kept informed of the progress of design work by Gill Engineering under the direction and support of the Highway Administration. We look forward to the earliest possible public meeting where this design work can be described for wide public review and participation.

We also would like to offer to you, the Department and the Highway Administration our continuing, supportive involvement as this project moves forward.

This underpass will be a major step to enhance the Charles River Parklands, one of the Boston area’s major assets, for at least the next hundred years.

Sincerely,

Katherine Blakeslee, Institute for Human-Centered Design
Greg Galer, Executive Director, Boston Preservation Alliance
Jack Glassman, Boston Society of Architects, Historic Resources Committee
Ken Kruckemeyer, LivableStreets Alliance
Wendy Landman, Executive Director, Walk Boston
Galen Mook, Boston Cyclists Union
Jon Puz, Cambridge Running Club
Renata von Tscharner, President and Founder, Charles River Conservancy
Jack Wofford, mediator and arbitrator

cc: Thomas J. Tinlin, Highway Administrator, MassDOT Michael Trepanier, Project Manager, MassDOT

WalkBoston statement on the Anderson Bridge Underpass

WalkBoston statement on the Anderson Bridge Underpass

WalkBoston enthusiastically supports the construction of the underpass for walkers, runners and cyclists beneath the Anderson Bridge, as well as the suggestion that evaluation of this underpass might lead to similar underpass routes beneath approaches to the River Street and Western Avenue Bridges.

Underpasses add significantly to the capacity of the riverside paths and also add to the network of off-road movement options along and across the Charles River. Capital improvements for the surface of all three bridges have been discussed in detail over the past few years and initial plans show positive agency responses to our advocacy for pedestrian movement across those bridges.

The Charles River paths are a key part of the broader transportation network. This proposal highlights the necessary interconnections and reinforces the need for DCR to receive increased funds for the maintenance of these and other riverside facilities.

Boston Globe: “Anderson bridge proposal backed” 8/5/2014

Learn more about the Charles River Conservancy’s Underpasses Advocacy Campaign.