Tag: sidewalks

Ashley Park Walk Audit

Ashley Park Walk Audit

The City of New Bedford was awarded a Safe Routes to Parks (SRTP) technical assistance grant from the National Parks and Recreation Association. The goal of the SRTP program is to increase safe access to parks and improve health outcomes in underserved areas. Using Ashley Park in New Bedford’s South End Neighborhood as a pilot park, WalkBoston worked with New Bedford City staff to develop a process of assessing the walking routes to the park. Lessons learned from this walk audit and pilot project will inform future park evaluations in New Bedford.

 

Read the full report here:
WalkBoston-AshleyParkWalkAudit-NewBedford

Comment on Mount Auburn Corridor Study

Comment on Mount Auburn Corridor Study

September 27, 2017

RE: Mount Auburn Corridor Study – Comments on Concepts Presented on August 18, 2016

WalkBoston would like to submit the following comments on the draft concepts for the Mount Auburn Corridor Study presented on August 18, 2016. We understand that the concepts may have changed since the presentation, but we feel it is valuable for these comments to be captured. We have organized our comments according to specific intersections.

While we appreciate the detail with which the consultants have addressed road crossings for people walking, we feel that the overall pedestrian pathway network has not been adequately addressed. Overall, there needs to be more attention paid to the areas of overlap where people walking and people biking intersect.

Intersection of Mt Auburn Street at Brattle Street

Under the assumption that vehicular traffic volumes at this intersection warrant a traffic signal, the plan diagram (shown on slide 9 of the August 18 presentation) shows both a crosswalk and bike crossing at the east side of the intersection. At the southern end of this dual use crossing, the sidewalk appears to narrow and there is limited (if any) area for people walking to wait for the signal. We would like some assurance that there is a continuous sidewalk and adequate space for pedestrians waiting to cross.

The northern end of the dual use crossing appears to require pedestrians to cross the bike lane to reach the sidewalk running east on Brattle Street and to use the crosswalk when walking west along Mount Auburn Street. There is also no delineated path for people walking west along Mt Auburn Street to safely cross the proposed driveway connections or the proposed bike path leading west from Brattle Street. While we realize this diagram is preliminary, we would like to see that people walking are given the same connected network as people biking and driving.

Gerrys Landing, Memorial Drive, Eliot Bridge, Greenough Blvd

The shortened crossing distances and single-phase crossings in the Two-T Alternative concept are significant improvements to the pedestrian infrastructure that exists today (shown on slide 46 of the August 18 presentation). Our concerns in this area lie in the interactions between cyclists and pedestrians at the crossing locations. The diagrams indicate that cyclists and pedestrians will be sharing waiting areas and in some cases crossing paths to reach destinations. We would like to see a finer grained delineation of space for each user group. Furthermore, the bike paths appear connected, but the sidewalk network is either disjointed or not present.

Intersection of Fresh Pond Parkway at Huron Ave

The plan diagram (shown on slide 52 of the August 18 presentation) shows a raised intersection at Fresh Pond Parkway and Huron Avenue. Given the vehicular traffic volumes in this location and the allowance of trucks, we were surprised to see this proposal. Furthermore, the pedestrian refuge island at the intersection’s southeastern corner seems to interrupt the bike lane without providing benefit to walkers. If there is extra room at this location, we would rather see a curb bump-out or wider sidewalk.

Mid-block Crossing on Fresh Pond Parkway at Larch Street

The mid-block crossing proposed across Fresh Pond Parkway near the Larch Street intersection (shown on slide 55 of the August 18 presentation) seems dangerous even with the introduction of a raised crossing and Rectangular Rapid Flashing Beacons (RRFBs). Pedestrians using this crossing may presume cars will stop once the beacons (RRFBs) are flashing which could lead to tragic consequences. The sight lines along this curvy section of Fresh Pond Parkway and the traffic speeds make this proposal inadvisable. We would suggest that more study be done to substantiate the need for the crossing, and for a safer location to be identified should the need be justified.

Intersection of Fresh Pond Parkway and Brattle Street

The proposed tightening of curb radii at this intersection is welcomed, but we question the proposed raised intersection once again given traffic volumes.

At the August 18 presentation, the guardrail along the western edge of Fresh Pond Parkway was discussed. Some people in the Stakeholders Meeting felt that the “highway scale” guardrail may make drivers feel that they can speed. Furthermore, the railing is not in character with the “park-like and historic” space adjacent to it. Neighborhood residents advocated for the guardrail to be installed to protect children and other pedestrians walking along Fresh Pond Parkway. Several harrowing stories were told about high traffic speeds and erratic drivers. If there is a solution that protects walkers and is more in character with the surroundings, then it could be considered. However, safety must be prioritized in this location given its proximity to Shady Hill School and Buckingham Browne and Nichols School.

Thank you for the opportunity to submit these comments and for inviting us to be a member of the stakeholder group. We welcome any questions you may have about these comments and look forward to your response.

Lowell – High Street Walk Assessment

Lowell – High Street Walk Assessment

On Tuesday, September 19, 2017, WalkBoston conducted a walk audit on High Street with support from the Massachusetts Executive Office of Public Safety and Security (EOPSS) Pedestrian Safety Planning Initiative for High-Fatality Communities. The goal of the walk assessment was to recommend improvements to the local built environment that improve pedestrian safety. The City Engineer, as well as staff from the Police Department, Planning Department, Pedestrian and Bicycle Committee/Mass in Motion, and Economic Development Department attended the audit. A list of attendees is included in Appendix A.

Read the full report here:
WalkBoston-HighStreetAssessementEOPSS-Lowell

Chelsea Park Square Walk Audit

Chelsea Park Square Walk Audit

On September 7, 2017, WalkBoston conducted a walk assessment in the Park Square area of downtown Chelsea, with support from the Massachusetts Executive Office of Public Safety and Security (EOPSS). The goal of the walk assessment was to recommend improvements to the local built environment that improve pedestrian safety.

Read the full report here:
WalkBoston-WalkAudit-ChelseaParkSquare-Chelsea

Comments on Policy of Guidelines for Outdoor Café within Public Ways

Comments on Policy of Guidelines for Outdoor Café within Public Ways

WalkBoston comments to the Boston Public Improvement Commission regarding:

“A Policy of Guidelines for Outdoor Café within Public Ways, Effective: September 1, 2017”

Submitted August 24, 2017

We would be happy to meet with PIC or other City staff to review and discuss our comments.

1. Pleased that new regulations will allow alcohol to be served on the “far side” of the sidewalk– a good change for the liveliness of the City.

2. Interesting and good to allow the expansion onto the curb and street areas—Curbline and Roadway seating. Again this creates new opportunities.

3. Technical issue: 2f should refer to the seating located within the restaurant’s property, not only that located within the City’s sidewalks. I think they have to approve both.

4. Technical issue: 14 should say “planters and their contents” because a lot of cafes have plant material hanging out far—even up to a foot. That subtracts that distance from the walking right of way.

5. Regulations should provide a simple table that indicates which department is responsible for different elements of the regulations – it might clarify that there are still many, many actors in the process.

6. Minimum dimension for path of travel 4 feet, preferred minimum is 6 feet – exclusive of street furniture or any other obstructions. Minimum should be 5 feet unless there are extraordinary circumstances.

7. Minimum sidewalk dimension to allow any cafe should be at least XXX feet – to ensure adequate POT plus dimension for café. The City should make this determination before finalizing the guidelines.

8. Modify the rule that the café should not occupy more than 50% of the sidewalk because that may not be appropriate for wide areas and may be insufficient for narrow sidewalks where there should be no café at al (see #2 above).

9. Require a minimum of 15 business days of notice for review by the public, and require that the plans available electronically so that upon request they can be reviewed by the public (much as the way in which BPDA now posts filings on line).

10. The cafe must be removed from the sidewalk when not in continuous use. The season can extend beyond May-September, but the cafe equipment and furnishings must be removed from the sidewalk if they are not used for more than ten days.

11. Set a schedule for fees and permitting costs – may be based on size, location, restaurant revenues, etc. but should be transparent.

12. Provide opportunities for pop up cafes for short-term (1-5 days) use.

13. Set a schedule and program for enforcement, including a point person for responding to public complaints when cafes are not following the rules (see attached photo).

Café of Restaurant XXXX on Tremont Street in the South End, little action taken after reported earlier this summer. We include this as one example where encroachment is taking place without being addressed.