Comments on Planned Development Area for the Air Rights Parcel 12 Project

Comments on Planned Development Area for the Air Rights Parcel 12 Project

July 22, 2019

Aisling Kerr
Boston Planning & Development Agency
City Hall, 9th Floor
One City Hall Square
Boston, MA 02201-1001

Re: Development Plan for the Planned Development Area for the Air Rights Parcel 12 Project

Dear Ms. Kerr:

WalkBoston has reviewed the proposal for the development of Parcel 12 in Boston’s Back Bay, and believe that it will significantly improve the pedestrian environment on what is now a wind- swept and uncomfortable bridge above the MassPike. The site design shows significant attention to the movement, comfort and amenities of people coming to and through it, and should provide an inviting new space for people to walk and linger. We are pleased that the tunnel under Mass Ave will be reopened allowing people to make intermodal transfers between buses, blue bikes, and walking and the Green Line without crossing Mass Ave. We do have some thoughts about some of the complex pedestrian and bicycle movements that the site must accommodate and would like to share the following comments.

Our Understanding of the Parcel 12 Development Project

The proposed development of Parcel 12, located between Newbury and Boylston Streets, and fronting on Massachusetts Avenue, consists of two towers – an office tower and a residential/ hotel tower on either side of a park located above the Turnpike. The two towers are located partially on existing terra firma and partially on air rights above the Turnpike and the commuter rail tracks. The proposed park, situated primarily on a platform using air rights above the Turnpike, contains facilities for both pedestrians and bicycles.

Public open space for the project totals 28,000 square feet on three levels. The public space facing Mass Ave is likely to be the most heavily used space for pedestrians and is described as a public gathering space where 16,000 square feet on the street level is dedicated to primarily pedestrian activities. The remainder of the open space is located either along Boylston Street or on two raised levels that bridge the space between the two dominant on-site buildings.

In the 16,000 square feet of open space along Mass Ave – a large triangle – a significant number of activities are planned. These include generous sidewalks of varying widths along Mass Ave and along the facades of the two proposed buildings. The open space also contains landscaping, bicycle facilities, bike racks, trash receptacles, lighting, street trees in raised planters, an expanded bus shelter on Mass Ave, a new headhouse (called a kiosk) with elevator and stairway to Hynes Green Line Station via a tunnel under Mass.Ave, and seating elements integrated into the rim of the bicycle path or in treed areas. Outdoor dining areas line two sides of the triangular open space.

The lobby entrance into the hotel-residential building faces this Mass Ave oriented open space, and the lobby entrance of the office building is located on Boylston St.

Access to the frequent buses on Mass Ave is a dominant use of the Mass Ave fronting sidewalk. The existing bus stop shelter is to be replaced next to a wider Mass Ave sidewalk with a larger shelter to serve the 140’ long bus stop on Mass Ave which can serve as many as three buses at a time. A new connection to the Green Line is provided, connecting the Parcel 12 site and the entrance to the subway on the east side of Mass Ave via on-site access to a stairway and elevator that links to an abandoned under-street tunnel for pedestrians. In addition to the Mass Ave sidewalk, a broad and generally parallel sidewalk leads from the Boylston Street entrance to the site to the Newbury Street entrance. A bicycle path is located between this sidewalk and the Mass Ave sidewalk.

Signal timing

The Project will include a full intersection redesign and the installation of new traffic signal equipment at the intersection of Mass Ave and Newbury Street, with a more limited set of intersection and signalization improvements planned for the intersection of Mass Ave and Boylston Street.

  • Per the MassDOT Separated Bike Lane Design Guide, pedestrian signal timing near separated bike lanes should include sufficient clearance time for a pedestrian to cross the entire roadway including the bike lanes and street buffers. Both intersections fit this description, and should have that additional time included for people walking.
  • In the Boston Smart Utilities filing (p 584-585), ‘Adaptive Signal Technology’ is referenced as a consideration, “where appropriate, and feasible.” We would encourage the proponent to adhere to the forward-looking signal policies put forth in the GoBoston 2030 plan, since the City of Boston’s current Signal Timing Guidelines do not yet reflect that same vision. ‘Smart Signals’ should be able to ‘see’ and serve the needs of people walking and biking as well as people in vehicles. Likewise, we urge the timing be used to improve bus service along Mass Ave and not be allowed to delay buses along Mass Ave in order to push more vehicles through the Mass/Newbury intersection to access the I-90W ramp.

Plaza level bicycle path

The bicycle path is a potential problem for people circulating throughout the new plaza, raising several issues:

  • Both north and south of the boundaries of Parcel 12, the bicycle lane is a protected lane located behind a row of parked cars along Mass Ave on the west side of the street. On the proposed plaza between Newbury Street and Boylston Street, the proposed bicycle path leaves the street and crosses the land included in the new park provided by Parcel 12. Although this appears to have been planned to avoid having bicycles compete with buses on-street, it results in bicycles having to compete for space with pedestrians.
  • Bicycles on the bike path will intersect at a right angle with an important pedestrian route between the bus stop and access to the Green Line in the new kiosk. At this location, many transit riders are changing modes (bus to Green Line, Green Line to bus). People who are connecting between these two transit services will be required to cross the bicycle path to make the connection, unless they cross Mass Ave midblock illegally or use the Boylston St. or the Newbury St. crosswalks. We are concerned that the large pedestrian volumes in this area, and especially the potentially large groups of people transferring between buses and the Green Line, may result in conflicts between people walking and biking. We would encourage a close examination of this issue with the use of projected bus transfer, pedestrian and bicycle volumes.
  • There are potential bicycle/pedestrian conflicts at the crosswalks on Newbury and Boylston Streets. Bicycles make the move from the street-based bike route north of the site into the on-site bike path across pedestrian flows on the crosswalk at Newbury Street and leave the Parcel 12 site by crossing pedestrian traffic on the Boylston Street crosswalk to reach the street-based route of the bicycle path on Mass Ave south of the site. We would encourage making the spaces for pedestrians and cyclists waiting to cross the street generous, to discourage further conflicts and enable efficient crossings.
  • The proposed open space containing the Mass Ave sidewalk, the bicycle path, the wider sidewalk between Newbury and Boylston Streets, the bus stop and the kiosk leading to the underground tunnel to the Green Line Hynes Station comprises a 16,000 square foot destination. We urge you to compare the proposed space with the downtown park at the intersection of Washington Street and School Street, sometimes called “Readers Park.” The plaza and street area in both locations are roughly similar in dimensions. The Downtown plaza is occupied by outdoor tables, landscaping, benches, the Irish Famine Memorial, benches and street trees. A wide sidewalk stretches along Washington Street, and an even wider sidewalk fronts onto Walgreens. Both are flooded with pedestrians every day, and the plaza seems to offer little space where a bike path could be threaded through it. It would be interesting to compare projected numbers of pedestrians in Parcel 12 with the actual numbers at Readers Park.

We encourage the proponent to consider some options that could minimize potential conflicts between the on-site bicycle path and pedestrians including the following:

  1. Keep bicycles on-street on Mass Ave. This could be a shared bus/bike lane allowing a direct continuous path for cyclists on Mass Ave since southbound cyclists north and south of Parcel 12 are already in the street and not potentially conflicting with pedestrian space on the sidewalk.
  2. A separated, on-street bike lane with a floating bus stop. As an alternative, consider the possibility of a separated, marked bike lane on-street with a floating bus stop: similar to what is being built in the Commonwealth Ave Phase 2A Project, even if it means taking space from the plaza. This would avoid requiring cyclists to leave the Mass Ave pavement, and cross several different pedestrian paths at north and south crosswalk entrances to the Parcel 12 development to get to a 260’ long bicycle path through this busy plaza.
  3. Move the Green Line kiosk and stairway east, to be closer to the bus stop. It may be possible to reposition the kiosk with access to the Green Line via elevator and stairs closer to the bus stop. This shortens and makes the route more direct between the bus stop and the kiosk, and would allow the bicycle path to be moved a bit further away from potential conflicts with transit riders making connections between buses and the Green Line, but bicycles would not be trying to move through the group of people making the connection.
  4. Design the proposed bicycle path 2”-3” lower than the pedestrian areas. A 2”-3” vertical difference drop with angled edges would emphasize the path, and make its edges less abrupt. There would need to be one or more raised crosswalks, especially for the potentially heavily used route between the bus stop and the Green Line access kiosk. The raised crossing would clearly help direct pedestrians while signaling to, and slowing down, bicycle riders as they pass through the pedestrian crossing. There may need to be warning signs to avoid pedestrians tripping at the edge of the path. The proponent could add tactile longitudinal strips to guide visually impaired people and further warn pedestrians near the bike path. The proposed parallel row of bollards helps to define the bike path, but some cyclists view bollards as dangerous if one needs to jump in or out of the bike path.
  5.  Make sure that there is a back on the “bench” that is next to the cycle track behind the bus stop to eliminate people sitting facing Mass Ave with their legs going into the cycle track.

Boylston Street Access

  1. Another design issue that we believe should be re-considered is the Boylston St. vehicular access to the office building. At the loading zone and vehicle entrance to the office building on Boylston Street, trucks may have to back into the loading zone area, creating a difficult safety issue for pedestrians walking along the street, as well as the traffic disruption that backing vehicles may cause on Boylston St. Requiring police units to help trucks or parkers seems to indicate that a certain level of difficulty in using this space is anticipated and the difficulty cannot be resolved in the present design. Perhaps the proposed parking spots along Boylston St. could become truck loading zones to alleviate the problem.
  2. The proponent and the City should evaluate requiring all vehicles exiting the parcel to turn right on Boylston Street. We believe that left-turning vehicles would pose a hazard to pedestrians walking along the sidewalk and would also disrupt traffic on Boylston Street. We do not believe that the proponent will be able to have a police officer directing traffic at all times.

Thank you for the opportunity to provide comments on this important project.

Sincerely,

Wendy Landman
Executive Director

Comment Letter on Kenmore Hotel Project (560-574 Commonwealth Avenue)

Comment Letter on Kenmore Hotel Project (560-574 Commonwealth Avenue)

June 27, 2019

Brian Golden, Director
Boston Redevelopment Authority
Attn: Tim Czerwienski
One City Hall Square
Boston, MA 02201-1007

Re: Kenmore Hotel, 560-574 Commonwealth Avenue, WalkBoston Comments

Dear Director Golden:

Thank you for the opportunity to comment on the Kenmore Hotel Project.

WalkBoston believes that the re-configuration of Kenmore Square proposed by the proponent will significantly enhance the environment and improve the safety and convenience of people walking to and through Kenmore Square. It will also create new pedestrian-focused civic space that is presently missing from this important Boston crossroads – where many residents, transit users, students, Red Sox fans and Boston Marathon fans will find new space to enhance their experience of Kenmore Square.

We believe that the re-configuration will also significantly improve the safety of bicyclists and drivers, with its simplified pattern of movement. Based on the traffic analysis provided in the DPIR it also appears that the new traffic pattern will improve the levels of service for vehicles, potentially providing a benefit for the many bus riders who pass through the Square each day.

We are very pleased that the proponent has proposed building a hotel without on-site parking or below-grade service access – either of which would require a curb cut interrupting the sidewalk. With Kenmore Square’s good transit access the hotel will truly reflect an urbanist vision for the City which we applaud. While we have not reviewed any financial information about the project, we wonder whether the decision to forgo the construction of parking spaces (@ approximately $25,000 – $30,000/space) has provided the proponent with the financial capacity to build the extensive plaza and streetscape improvements that are proposed. If this is the case, we hope that future Boston development projects will be encouraged by the City to take advantage of this opportunity.

We urge the City to work with the proponent to bring this new vision for Kenmore Square to fruition.

We have several questions and comments about the project that we urge the City to work with the proponent to address.

  1. The new, much safer, bicycle circulation system is an important improvement for Kenmore Square. We urge the design team to carefully design the western edge of the site to actively discourage eastbound cyclists on Commonwealth Avenue from riding through the plaza area rather than taking the New Road-Beacon Street-Commonwealth Avenue bike route that is the intended route.
  2. Based on the wind study results presented at the June 19 public meeting, several spots on the plaza may be quite windy. We urge the proponent to develop designs that both reduce the wind and avoid the use of walls along Commonwealth Avenue. We believe that walls will serve to privatize the feel of the space and may also cause unintended noise impacts (wooshing sounds) as traffic passes by the intermittent walls.
  3. We hope that the plaza will include seating that has a softer feel than that which seems to be illustrated to date – seating that invites people to linger and enjoy the great people-watching.
  4. For how many years has the proponent committed to maintaining and programming the Plaza?
  5. It appears from the site plan that there are two left turn lanes from westbound Commonwealth Avenue feeding into one receiving lane on Brookline Avenue – is this intended, or is the site plan incorrect? In addition, westbound Commonwealth Avenue traffic will need very clear lane markings (and perhaps a tweaking of the shape of the nose of the plaza) to ensure that traffic does not mistakenly head westbound on Beacon Street.

We look forward to a significantly improved walking experience in Kenmore Square when the project is realized.

Please let us know if you have any questions about our comments.

Best regards,

Wendy Landman
Executive Director

Comment Letter on Paul Dudley White Construction Period Maintenance (02/7/19)

Comment Letter on Paul Dudley White Construction Period Maintenance (02/7/19)

February 7, 2019

Stephanie Pollack                                             Leo Roy
Secretary of Transportation                            Commissioner
Commonwealth of Massachusetts                Department of Conservation & Recreation
Transportation Building                                   251 Causeway Street
10 Park Plaza                                                      9th Floor
Boston, MA 02116                                            Boston, MA 02114

Dear Secretary Pollack and Commissioner Roy:

We, the undersigned organizations, applaud MassDOT’s decision to rebuild the interchange of I-90 in Allston by reconstructing the Turnpike in a way that will result in wider riverside parkland and, we anticipate, restored riverbank. In addition to its environmental benefits, this will enhance facilities for the walkers, cyclists, and runners who flock to the area for recreation and commuting. We write to respond to the announcement that construction of the I-90 Intermodal Project will require an extended closure of the Paul Dudley White (PDW) path.

We urge you to develop a plan to retain the path during the construction period.  We acknowledge that the project design next steps involve extensive mitigation, that stakeholders will continue to actively participate in stakeholder discussions, and that there is an immediate need to flag concerns regarding the PDW path.

The construction of the I-90 Project cannot and should not require closure of the Paul Dudley White (PDW) path for 8-10 years. The number of people who use the path and rely upon it as a commuter route is simply too large (and growing) to result in PDW users’ diversion to Cambridge. The proposed detour routes through Cambridge are difficult to maneuver and involve unsafe situations where path users will be forced to cross dangerous intersections and cyclists will be directed toward narrow sidewalks causing hazardous conditions for pedestrians sharing the walkway.

Our understanding is that closure of the PDW is an anticipated result of construction in the Throat area. We also understand that other parts of the project site, which are not as confined, offer places where the PDW path can be integrated safely with the highway construction. The law requires that MassDOT implement “all possible planning to minimize harm to the . . . recreation area” during and after construction. To comply, MassDOT and DCR must mitigate construction impacts in the Throat area allowing the PDW path to remain open for as much of the construction period as practicable, preferably on land or, if there is no other option, on a temporary structure in the Charles River.

In the past short temporary boardwalks have been built in the Charles River — for example, to bypass the Bowker interchange reconstruction. Temporary boardwalks have been used safely and effectively in the Indiana Dunes National Lakeshore park in Indiana, Jones Beach State Park in Wantagh, New York, and at beaches in the Cape Cod National Seashore and in Duxbury and Sandwich, Massachusetts.

We urge you to incorporate plans to ensure access to the PDW path on the Boston side of the Charles River as you proceed with the difficult design work in the I-90 Throat area. The provision of atemporary Boston-side walking and biking path during construction is a necessary and legally required project element to mitigate any interruption in access to the permanent PDW path and prevent the safety problems that a Cambridge detour would bring to pedestrians and cyclists. Given the potentially lengthy roadway disruptions, alternative modes of transportation on the PDW will be critical to the Project’s success. We further request that the PDW path construction phase plans be added to the agenda for an upcoming Allston Multimodal Project Task Force meeting.

Thank you very much for your consideration and we look forward to your response.

Wendy Landman, Bob Sloane, WalkBoston
Margaret Van Deusen, Pallavi Mande, Charles River Watershed Association
Laura Jasinski, Harry Mattison, Charles River Conservancy
Staci Rubin, Conservation Law Foundation
Michael Nichols, The Esplanade Association
Galen Mook, Executive Director, MassBike
Becca Wolfson, Boston Cyclists Union
Stacy Thompson, Livable Streets

CC:
City of Boston, Mayor Marty Walsh, Chief of Streets Chris Osgood
City of Cambridge, Mayor Marc McGovern, Transportation Program Manager Bill Deignan
Town of Brookline, Transportation Board Chair Chris Dempsey
FHWA, Division Administrator Jeff McEwen, Assistant Division Administrator Ken Miller
Senator Joseph Boncore
Senator William Brownsberger
Senator Sal DiDomenico
Representative Michael Moran
Representative Kevin Honan
Representative Jay Livingstone
Representative Tommy Vitolo

Wicked Local Belmont – A Growth Mindset for the New High School

Wicked Local Belmont – A Growth Mindset for the New High School

Wicked Local Belmont: “A Growth Mindset for the New High School
By Kate Bowen

Transit: Did you know we charge for school buses, while we provide school parking for free? Did you know that Belmont once plowed sidewalk routes to schools? Facing practices that are at odds with our goals of reducing vehicular traffic, we are responding. We are conducting a town-wide traffic study, applying to the Complete Streets program, learning from experts including WalkBoston and Nelson/Nygaard, and re-examining our policies for buses, parking, and commuter programs. We are learning from peers like Melrose, which plows walking routes to schools:
https://tinyurl.com/MelrosePlows
and safely utilizes on-street drop-off areas. We are learning that, despite our small geography, we need to actively support walking, biking, and public transit to achieve our goals.

Posted May 22, 2018