WalkBoston Comments on the South Boston Seaport Strategic Transit Plan

WalkBoston Comments on the South Boston Seaport Strategic Transit Plan

July 24, 2020 | WalkBoston Comments on the South Boston Seaport Strategic Transit Plan

To:
Brian P. Golden, Director Boston Planning & Development Agency
Chris Osgood, Chief of Streets
Councilor Wu, Chair Planning, Development and Transportation
Councilor Flynn, District 2

WalkBoston appreciates the opportunity to comment on the plan and are glad to see that a broad set of options are under consideration. We also are glad that a diversity of perspectives is represented by the four criteria used: Expand, Rely, Respect and Equalize.

We offer the following comments and look forward to hearing from you with responses to our comments and the opportunity to comment again as the plan is advanced.

  1. We are pleased that Improving Pedestrian Connections has emerged as one of the top candidates for short term implementation and agree that this strategy will serve many people and improve transit access and use for a broad range of users and locations.
  2. After reviewing the options for short term strategies that are now under consideration, we believe that an evaluation that gives greater weight to Equalize as a value would better serve the needs of the District and of Boston as a whole.

The strategies with the highest Equalize ratings are:

  • Expand Off-Peak Transit Service 100 points
  • Dedicated Transit Corridors 70 points
  • North Station – South Station – South Boston Seaport Direct Bus or Shuttle Service 61 points
  • Bus or Shuttle connection from Nubian Square to South Boston Seaport Link via Broadway 60 points
  • Bus or Shuttle connection from Central Square to South Boston Seaport via LMA and Nubian Square 58 points

While we are pleased that Expanding Off-Peak Transit Service has been flagged as one of the top strategies, we are concerned that Extend Private and Consolidated Shuttles on A St to Broadway has also been given a top rating as this is the ONLY strategy among all of those evaluated that received a negative rating for Equalize, and that it actually increases travel time for many transit users.

We believe that the Bus or Shuttle connection from Nubian Square to South Boston Seaport Link via Broadway or the Bus or Shuttle connection from Central Square to South Boston Seaport via LMA and Nubian Square (# 2 and 3 in overall ratings) should be included as one of the strategies to be advanced. These two options also directly serve some of Boston’s neighborhoods with the greatest number and density of people of color.

  1. There seems to be a disconnect between this BPDA Plan and the work of the Public Works Department on the Northern Avenue Bridge. As WalkBoston and a number of our fellow advocates have commented, we strongly disagree with the plan to allow shuttle buses to use a new Northern Avenue Bridge because it will negatively impact people walking and biking on the bridge, will require that the bridge be very large and expensive, and because it provides very little benefit to shuttle users.

None of the numerous bus service improvements suggested and reviewed in the South Boston Seaport Strategic Transit Plan (short or long term) are shown to be using a future Northern Avenue Bridge. The bridge itself is called out as a strategy, but it is not incorporated into any of the other strategies – all of the routes that cross the Fort Point Channel are shown using the Summer Street or Congress Street Bridges. We urge the Public Works Department to look again at its proposal and eliminate the use of the bridge for shuttle buses.

WalkBoston looks forward to working with you as this plan progresses.

Joint comment letter regarding Arborway Parkways Improvement Project

Joint comment letter regarding Arborway Parkways Improvement Project

Department of Conservation and Recreation
Office of Public Outreach
251 Causeway St 6th Floor
Boston, MA 02114

CC: Senator Chang-Diaz, Representative Nika Elugardo, Representative Liz Malia, City Councilor Matt O’Malley, Chief of Streets Chris Osgood

July 10, 2020

Dear Mr. Jeff Parenti and DCR staff,

Thank you for hosting another meeting concerning the Arborway Parkway Improvements Project We are glad that DCR is prioritizing this project and dedicating time and money to implementing short-term improvements and embarking on a rapid “long-term” process to dramatically improve the way the Arborway functions for vulnerable road users, especially in Murray Circle and improve park access for all.

In addition to the comments we provided in December 2019 and this spring, we propose the following suggestions to the short-term improvements and overall planning process from the meeting on June 24:

1) Changes to the proposed short-term improvements

We are pleased to see an aggressive timeline to have a design by the start of 2021 and construction to begin in 2021 — don’t let up! However, we are concerned about short-term bike accommodations not being implemented this year. We want to be sure this opportunity is used to create a safe, connected route to and through the Emerald Necklace Parks. As stated in our previous letter last December, short-term improvements should calm traffic and reduce crashes while also encouraging greater usage by people walking and biking. Toward that end, we reiterate our request for short-term improvements to include a lane removal on the carriage roads between Murray and Kelley Circles to accommodate a physically separated bike lane in the reclaimed space. We also remain concerned about the lack of a plan to improve safety for people biking through Murray Circle. Murray Circle is a critical gap in the network, and is plagued by crashes that impact safety of all road users.

2) Concern About CTPS Modeling Projections

We are concerned that this project is planning to accommodate an increase in vehicular traffic despite a 2019 study showing a decrease in daily traffic volumes since 2014, and despite Boston and Massachusetts’ goals to shift mode share away from personal vehicles.

In last month’s meeting about this project, DCR cited a CTPS study showing a slight increase in morning traffic. However, that same study found a decrease in evening traffic. As a result, we are deeply skeptical of the CTPS model projecting an increase in overall volume from 2020-2030. We would like to remind you that traffic models have again and again overestimated future volume. In one notable example, in 2018 CTPS projected that inbound traffic on the Longfellow Bridge would double from pre-construction levels once the bridge fully reopened that year; in reality, traffic volumes fell by almost 30% during the morning rush hour relative to 2008. The projection for outbound traffic was even further off-base. CTPS estimated a morning rush of 2,121 vehicles — nearly five times more than the actual peak of 442 measured in September 2018. We also would like to remind you that we must build for the future we want to see! Designing this road to accommodate more traffic will only create more induced demand for driving at a time when that’s the last thing needed on Boston’s already congested roadways.

As you move forward conducting traffic studies, we encourage you and the consultant team to not only consider current vehicle demand to predict future behavior, but to take into consideration that a design that encourages walking/biking can actually get people out of their cars. Both the Commonwealth, under the Global Warming Solutions Act, and the City of Boston have ambitious goals (e.g., Boston reducing emissions and car traffic in half by 2030) that relate to reducing the number of cars on the roads. Emissions from the transportation sector have stayed steady in the state and are not meeting the reduction goals set; as a State agency who has custody and control of the roadways, DCR must be a critical partner in meeting these goals.

3) A robust public engagement process

Especially given the history of previous planning processes for the Arborway and the frustrations expressed by the public at the first meeting, we suggest extra communication and time with the public and believe that this will lead to the most successful process and outcome. We appreciate, for example, the robust public comment period held during the first meeting and are glad to hear that there is a communications and facilitation team for meetings moving forward.

We ask for a publication of a timeline for the project that outlines expected meetings, other public engagement opportunities and milestones (25% design, construction, etc) as soon as possible and for you to stick to the promised dates and timelines. We strongly feel that this will go a long way in building trust and transparency with area-residents. We hope the process is as concise as possible and includes regular communication so residents continue to engage productively in the planning and discussion.

Finally, we suggest including walks — which can be planned in a way to allow for safe social distancing — as a public engagement tool. We have seen that people who currently only drive through the area have a very different understanding of the safety and connectivity needs when walking or riding a bike there.

4) Coordination

a. Given resident concerns about traffic being diverted to side streets, we suggest including those neighborhood side streets in Jamaica Hills and the Jamaica Pond neighborhood in traffic studies and projected traffic patterns to demonstrate to residents the hopefully minimal impact it will have on their streets.

b. Thank you for the coordination and communication you have had with the City of Boston around this project. We hope this will continue so the City can partner around implementing some traffic calming at intersections or side streets that will be impacted.

c. We understand that Centre/Walter St and Arborway are proceeding at the same time. We ask that DCR consider the impact one project will have on the other and ensure that both consultant teams are sharing information and plans. We ask that public meetings on either project share consolidated updates on the other related process.

5) Other overall comments

We are glad to see one of the goals of this project is to “Create a continuous and comfortable bicycle and pedestrian connection between the Arboretum and Pond”. We ask that the bicycle facilities be physically separated the entire length, regardless of whether they are a shared-use path, off-road or on-road facility. Protected or physically separated bike lanes have been shown to improve safety for not only people who bike, but for all road users. A 2019 study by researchers at the University of Colorado Denver and the University of New Mexico found protected bike lanes reduced injury risk to cyclists by 90%, while reducing fatal crashes overall by 44%. Moreover, countless studies have found that a majority of Americans are interested in biking, yet the primary reason why people don’t bike is the fear of being hit by a car. To create a truly “comfortable” bike route that encourages many more people to ride bikes, you must implement protected/separated bike lanes.

Thank you for your consideration of our suggestions. We look forward to continuing to work together around our shared goals for this project.

Becca Wolfson Boston Cyclists Union
Ambar Johnson, LivableStreets Alliance
Brendan Kearney, WalkBoston

Testimony as prepared for City of Boston City Council Budget Hearing on Public Works and Transportation

Testimony as prepared for City of Boston City Council Budget Hearing on Public Works and Transportation

Testimony as prepared for City of Boston City Council Budget Hearing on Public Works and Transportation, May 7, 2020 conducted via Zoom.

Thank you for the chance to speak today. My name is Brendan Kearney, and I’m the Deputy Director of WalkBoston. 

Earlier this week, MassDOT reported that the rate of fatalities on Massachusetts roadways doubled in April: with 50% less traffic on the road, 28 individuals died in crashes, compared with the month of April 2019 when there were 27 deaths on roadways in the state. This highlights why the safety projects identified for funding here are important. 

The BTD staff expansion over the last two budget cycles is now showing dividends: Many projects those team members started on are moving to implementation. There is a need to keep working to make our streets safer for people walking; safety projects in the public works and transportation budget are moving us in the right direction.

I wanted to highlight a few things from the budget & Transportation Priorities overview:

  • 1st: Great to see Tremont Street has construction dollars in the coming year.
  • 2nd: Very glad to hear that “$2 million for a Safety Intervention Program on Neighborhood Streets, which will help us evaluate and act on all resident 311 safety requests” is part of the budget. It would be great for more clarification around this, and how it will be equitably implemented similar to sidewalk repairs in the Walkable Streets Program. This could be a way for spot improvements like speed humps at dangerous intersections or on streets that may not be a good fit or eligible for the Neighborhood Slow Streets Program. 
  • 3rd: Thank you for continued work toward accessibility for all, with “Newly expanded pedestrian ramp plan that doubles number of ramps installed” & adding an ADA Coordinator to Public Works. 
  • 4th: We’re hopeful on the item “$150,000 to improve the Pedestrian Signal Retiming Program in order to retime more of our most dangerous intersections in a more equitable manner.” This could be a step in the right direction of the GoBoston2030 goal of pedestrian-prioritized signals, especially good to hear about the goal of POLICY changes. 
  • Finally, echoing Eliza and Louisa about the Northern Ave Bridge: WalkBoston, LivableStreets, and the Boston Cyclists Union asked last night that the City commit to a bridge design that is only open to pedestrians, bicycles, and emergency vehicles. That was not reflected in last night’s meeting. We are asking City Council not to approve the Northern Ave Bridge project in the budget until this commitment has been made. The scale of funding for the safety projects I just mentioned throughout the city pale in comparison to the estimated dollars for the current iteration of this proposed bridge.

Thank you for the opportunity to comment.

Please add your voice to the design and environmental review of MassDOT’s plans to rebuild the Mass Pike Allston Interchange!

Please add your voice to the design and environmental review of MassDOT’s plans to rebuild the Mass Pike Allston Interchange!

The federal environmental review for the I-90 project is about to begin, and there are elements of this project design that are causing us concern.

We need your help to submit comments on the design before Thursday, Dec. 12th 2019. Over 100 people emailed in February 2018, and it changed the process for the better. Can we count on you again?

DearMassDOT

Send an email to I-90Allston@dot.state.ma.us and cc: comments@walkboston.org when you send it in!

Here are WalkBoston’s top five concerns with the current plan:

  1. The construction of West Station is not being accelerated, and the design of the tracks and station cannot accommodate the level of rail service that is needed to serve the Framingham-Worcester corridor or the Boston/Cambridge/Brookline neighborhoods near the station. The MBTA Board of Directors recently endorsed a plan to significantly increase the frequency of commuter rail service – MassDOT’s plan for West Station must align with that vision.
  2. The walking and biking connections provided in MassDOT’s proposal do not include the connections that we need between the Charles River path and Allston Village or Commonwealth Avenue including: a safer new Franklin Street Footbridge connecting North and South Allston, without the unsafe switchback hairpin turns currently included in design; a footbridge at Agganis Way to connect Allston, Comm Ave, and Boston University to the Charles River paths; and a new park and multi-use path built as a buffer between the Wadsworth Street neighborhood and the train tracks,
  3. The project’s purpose must include a plan to improve the quality and extent of the Charles River parkland, the storage and treatment of stormwater, the ecological health of the river, and the need to provide human access to the river’s edge.
  4. MassDOT must provide a detailed plan to effectively mitigate travel disruptions during the 10-year construction period. No additional rail or bus service has yet been described or offered and no commitment has been made to keeping two tracks in service on the Framingham-Worcester Line during construction.
  5. The construction plan described by MassDOT will have significant impacts on the Charles River for 10+ years. Project planning must include further review of design and construction alternatives to ensure that these impacts are mitigated and reduced to the greatest extent possible.

We need your help to speak up for the future of this project!

Below you’ll see an email template you can adapt and send to
I-90Allston@dot.state.ma.us and comments@walkboston.org before next Thursday, Dec. 12 to make your voice heard.

Thank you for speaking up for a better Allston I-90!

Sincerely,
WalkBoston

Sample Email
Recommended email subject: Comments for Mass Pike’s Allston Interchange Project
Dear Allston I-90 Project Team,
I am writing to give my comments on MassDOT’s current project plan for the Mass Pike Allston Interchange project.
[Tell your own story here. Why are you concerned with this project? What do you support and what would you like to be considered? What points above would you like to include?]
Thank you,
[full name
street address
city/town, state, zip
phone:
email: ]

More Context + Reading on the Allston I-90 Project

Comments on Planned Development Area for the Air Rights Parcel 12 Project

Comments on Planned Development Area for the Air Rights Parcel 12 Project

July 22, 2019

Aisling Kerr
Boston Planning & Development Agency
City Hall, 9th Floor
One City Hall Square
Boston, MA 02201-1001

Re: Development Plan for the Planned Development Area for the Air Rights Parcel 12 Project

Dear Ms. Kerr:

WalkBoston has reviewed the proposal for the development of Parcel 12 in Boston’s Back Bay, and believe that it will significantly improve the pedestrian environment on what is now a wind- swept and uncomfortable bridge above the MassPike. The site design shows significant attention to the movement, comfort and amenities of people coming to and through it, and should provide an inviting new space for people to walk and linger. We are pleased that the tunnel under Mass Ave will be reopened allowing people to make intermodal transfers between buses, blue bikes, and walking and the Green Line without crossing Mass Ave. We do have some thoughts about some of the complex pedestrian and bicycle movements that the site must accommodate and would like to share the following comments.

Our Understanding of the Parcel 12 Development Project

The proposed development of Parcel 12, located between Newbury and Boylston Streets, and fronting on Massachusetts Avenue, consists of two towers – an office tower and a residential/ hotel tower on either side of a park located above the Turnpike. The two towers are located partially on existing terra firma and partially on air rights above the Turnpike and the commuter rail tracks. The proposed park, situated primarily on a platform using air rights above the Turnpike, contains facilities for both pedestrians and bicycles.

Public open space for the project totals 28,000 square feet on three levels. The public space facing Mass Ave is likely to be the most heavily used space for pedestrians and is described as a public gathering space where 16,000 square feet on the street level is dedicated to primarily pedestrian activities. The remainder of the open space is located either along Boylston Street or on two raised levels that bridge the space between the two dominant on-site buildings.

In the 16,000 square feet of open space along Mass Ave – a large triangle – a significant number of activities are planned. These include generous sidewalks of varying widths along Mass Ave and along the facades of the two proposed buildings. The open space also contains landscaping, bicycle facilities, bike racks, trash receptacles, lighting, street trees in raised planters, an expanded bus shelter on Mass Ave, a new headhouse (called a kiosk) with elevator and stairway to Hynes Green Line Station via a tunnel under Mass.Ave, and seating elements integrated into the rim of the bicycle path or in treed areas. Outdoor dining areas line two sides of the triangular open space.

The lobby entrance into the hotel-residential building faces this Mass Ave oriented open space, and the lobby entrance of the office building is located on Boylston St.

Access to the frequent buses on Mass Ave is a dominant use of the Mass Ave fronting sidewalk. The existing bus stop shelter is to be replaced next to a wider Mass Ave sidewalk with a larger shelter to serve the 140’ long bus stop on Mass Ave which can serve as many as three buses at a time. A new connection to the Green Line is provided, connecting the Parcel 12 site and the entrance to the subway on the east side of Mass Ave via on-site access to a stairway and elevator that links to an abandoned under-street tunnel for pedestrians. In addition to the Mass Ave sidewalk, a broad and generally parallel sidewalk leads from the Boylston Street entrance to the site to the Newbury Street entrance. A bicycle path is located between this sidewalk and the Mass Ave sidewalk.

Signal timing

The Project will include a full intersection redesign and the installation of new traffic signal equipment at the intersection of Mass Ave and Newbury Street, with a more limited set of intersection and signalization improvements planned for the intersection of Mass Ave and Boylston Street.

  • Per the MassDOT Separated Bike Lane Design Guide, pedestrian signal timing near separated bike lanes should include sufficient clearance time for a pedestrian to cross the entire roadway including the bike lanes and street buffers. Both intersections fit this description, and should have that additional time included for people walking.
  • In the Boston Smart Utilities filing (p 584-585), ‘Adaptive Signal Technology’ is referenced as a consideration, “where appropriate, and feasible.” We would encourage the proponent to adhere to the forward-looking signal policies put forth in the GoBoston 2030 plan, since the City of Boston’s current Signal Timing Guidelines do not yet reflect that same vision. ‘Smart Signals’ should be able to ‘see’ and serve the needs of people walking and biking as well as people in vehicles. Likewise, we urge the timing be used to improve bus service along Mass Ave and not be allowed to delay buses along Mass Ave in order to push more vehicles through the Mass/Newbury intersection to access the I-90W ramp.

Plaza level bicycle path

The bicycle path is a potential problem for people circulating throughout the new plaza, raising several issues:

  • Both north and south of the boundaries of Parcel 12, the bicycle lane is a protected lane located behind a row of parked cars along Mass Ave on the west side of the street. On the proposed plaza between Newbury Street and Boylston Street, the proposed bicycle path leaves the street and crosses the land included in the new park provided by Parcel 12. Although this appears to have been planned to avoid having bicycles compete with buses on-street, it results in bicycles having to compete for space with pedestrians.
  • Bicycles on the bike path will intersect at a right angle with an important pedestrian route between the bus stop and access to the Green Line in the new kiosk. At this location, many transit riders are changing modes (bus to Green Line, Green Line to bus). People who are connecting between these two transit services will be required to cross the bicycle path to make the connection, unless they cross Mass Ave midblock illegally or use the Boylston St. or the Newbury St. crosswalks. We are concerned that the large pedestrian volumes in this area, and especially the potentially large groups of people transferring between buses and the Green Line, may result in conflicts between people walking and biking. We would encourage a close examination of this issue with the use of projected bus transfer, pedestrian and bicycle volumes.
  • There are potential bicycle/pedestrian conflicts at the crosswalks on Newbury and Boylston Streets. Bicycles make the move from the street-based bike route north of the site into the on-site bike path across pedestrian flows on the crosswalk at Newbury Street and leave the Parcel 12 site by crossing pedestrian traffic on the Boylston Street crosswalk to reach the street-based route of the bicycle path on Mass Ave south of the site. We would encourage making the spaces for pedestrians and cyclists waiting to cross the street generous, to discourage further conflicts and enable efficient crossings.
  • The proposed open space containing the Mass Ave sidewalk, the bicycle path, the wider sidewalk between Newbury and Boylston Streets, the bus stop and the kiosk leading to the underground tunnel to the Green Line Hynes Station comprises a 16,000 square foot destination. We urge you to compare the proposed space with the downtown park at the intersection of Washington Street and School Street, sometimes called “Readers Park.” The plaza and street area in both locations are roughly similar in dimensions. The Downtown plaza is occupied by outdoor tables, landscaping, benches, the Irish Famine Memorial, benches and street trees. A wide sidewalk stretches along Washington Street, and an even wider sidewalk fronts onto Walgreens. Both are flooded with pedestrians every day, and the plaza seems to offer little space where a bike path could be threaded through it. It would be interesting to compare projected numbers of pedestrians in Parcel 12 with the actual numbers at Readers Park.

We encourage the proponent to consider some options that could minimize potential conflicts between the on-site bicycle path and pedestrians including the following:

  1. Keep bicycles on-street on Mass Ave. This could be a shared bus/bike lane allowing a direct continuous path for cyclists on Mass Ave since southbound cyclists north and south of Parcel 12 are already in the street and not potentially conflicting with pedestrian space on the sidewalk.
  2. A separated, on-street bike lane with a floating bus stop. As an alternative, consider the possibility of a separated, marked bike lane on-street with a floating bus stop: similar to what is being built in the Commonwealth Ave Phase 2A Project, even if it means taking space from the plaza. This would avoid requiring cyclists to leave the Mass Ave pavement, and cross several different pedestrian paths at north and south crosswalk entrances to the Parcel 12 development to get to a 260’ long bicycle path through this busy plaza.
  3. Move the Green Line kiosk and stairway east, to be closer to the bus stop. It may be possible to reposition the kiosk with access to the Green Line via elevator and stairs closer to the bus stop. This shortens and makes the route more direct between the bus stop and the kiosk, and would allow the bicycle path to be moved a bit further away from potential conflicts with transit riders making connections between buses and the Green Line, but bicycles would not be trying to move through the group of people making the connection.
  4. Design the proposed bicycle path 2”-3” lower than the pedestrian areas. A 2”-3” vertical difference drop with angled edges would emphasize the path, and make its edges less abrupt. There would need to be one or more raised crosswalks, especially for the potentially heavily used route between the bus stop and the Green Line access kiosk. The raised crossing would clearly help direct pedestrians while signaling to, and slowing down, bicycle riders as they pass through the pedestrian crossing. There may need to be warning signs to avoid pedestrians tripping at the edge of the path. The proponent could add tactile longitudinal strips to guide visually impaired people and further warn pedestrians near the bike path. The proposed parallel row of bollards helps to define the bike path, but some cyclists view bollards as dangerous if one needs to jump in or out of the bike path.
  5.  Make sure that there is a back on the “bench” that is next to the cycle track behind the bus stop to eliminate people sitting facing Mass Ave with their legs going into the cycle track.

Boylston Street Access

  1. Another design issue that we believe should be re-considered is the Boylston St. vehicular access to the office building. At the loading zone and vehicle entrance to the office building on Boylston Street, trucks may have to back into the loading zone area, creating a difficult safety issue for pedestrians walking along the street, as well as the traffic disruption that backing vehicles may cause on Boylston St. Requiring police units to help trucks or parkers seems to indicate that a certain level of difficulty in using this space is anticipated and the difficulty cannot be resolved in the present design. Perhaps the proposed parking spots along Boylston St. could become truck loading zones to alleviate the problem.
  2. The proponent and the City should evaluate requiring all vehicles exiting the parcel to turn right on Boylston Street. We believe that left-turning vehicles would pose a hazard to pedestrians walking along the sidewalk and would also disrupt traffic on Boylston Street. We do not believe that the proponent will be able to have a police officer directing traffic at all times.

Thank you for the opportunity to provide comments on this important project.

Sincerely,

Wendy Landman
Executive Director