Comment on Mount Auburn Corridor Study

Comment on Mount Auburn Corridor Study

September 27, 2017

RE: Mount Auburn Corridor Study – Comments on Concepts Presented on August 18, 2016

WalkBoston would like to submit the following comments on the draft concepts for the Mount Auburn Corridor Study presented on August 18, 2016. We understand that the concepts may have changed since the presentation, but we feel it is valuable for these comments to be captured. We have organized our comments according to specific intersections.

While we appreciate the detail with which the consultants have addressed road crossings for people walking, we feel that the overall pedestrian pathway network has not been adequately addressed. Overall, there needs to be more attention paid to the areas of overlap where people walking and people biking intersect.

Intersection of Mt Auburn Street at Brattle Street

Under the assumption that vehicular traffic volumes at this intersection warrant a traffic signal, the plan diagram (shown on slide 9 of the August 18 presentation) shows both a crosswalk and bike crossing at the east side of the intersection. At the southern end of this dual use crossing, the sidewalk appears to narrow and there is limited (if any) area for people walking to wait for the signal. We would like some assurance that there is a continuous sidewalk and adequate space for pedestrians waiting to cross.

The northern end of the dual use crossing appears to require pedestrians to cross the bike lane to reach the sidewalk running east on Brattle Street and to use the crosswalk when walking west along Mount Auburn Street. There is also no delineated path for people walking west along Mt Auburn Street to safely cross the proposed driveway connections or the proposed bike path leading west from Brattle Street. While we realize this diagram is preliminary, we would like to see that people walking are given the same connected network as people biking and driving.

Gerrys Landing, Memorial Drive, Eliot Bridge, Greenough Blvd

The shortened crossing distances and single-phase crossings in the Two-T Alternative concept are significant improvements to the pedestrian infrastructure that exists today (shown on slide 46 of the August 18 presentation). Our concerns in this area lie in the interactions between cyclists and pedestrians at the crossing locations. The diagrams indicate that cyclists and pedestrians will be sharing waiting areas and in some cases crossing paths to reach destinations. We would like to see a finer grained delineation of space for each user group. Furthermore, the bike paths appear connected, but the sidewalk network is either disjointed or not present.

Intersection of Fresh Pond Parkway at Huron Ave

The plan diagram (shown on slide 52 of the August 18 presentation) shows a raised intersection at Fresh Pond Parkway and Huron Avenue. Given the vehicular traffic volumes in this location and the allowance of trucks, we were surprised to see this proposal. Furthermore, the pedestrian refuge island at the intersection’s southeastern corner seems to interrupt the bike lane without providing benefit to walkers. If there is extra room at this location, we would rather see a curb bump-out or wider sidewalk.

Mid-block Crossing on Fresh Pond Parkway at Larch Street

The mid-block crossing proposed across Fresh Pond Parkway near the Larch Street intersection (shown on slide 55 of the August 18 presentation) seems dangerous even with the introduction of a raised crossing and Rectangular Rapid Flashing Beacons (RRFBs). Pedestrians using this crossing may presume cars will stop once the beacons (RRFBs) are flashing which could lead to tragic consequences. The sight lines along this curvy section of Fresh Pond Parkway and the traffic speeds make this proposal inadvisable. We would suggest that more study be done to substantiate the need for the crossing, and for a safer location to be identified should the need be justified.

Intersection of Fresh Pond Parkway and Brattle Street

The proposed tightening of curb radii at this intersection is welcomed, but we question the proposed raised intersection once again given traffic volumes.

At the August 18 presentation, the guardrail along the western edge of Fresh Pond Parkway was discussed. Some people in the Stakeholders Meeting felt that the “highway scale” guardrail may make drivers feel that they can speed. Furthermore, the railing is not in character with the “park-like and historic” space adjacent to it. Neighborhood residents advocated for the guardrail to be installed to protect children and other pedestrians walking along Fresh Pond Parkway. Several harrowing stories were told about high traffic speeds and erratic drivers. If there is a solution that protects walkers and is more in character with the surroundings, then it could be considered. However, safety must be prioritized in this location given its proximity to Shady Hill School and Buckingham Browne and Nichols School.

Thank you for the opportunity to submit these comments and for inviting us to be a member of the stakeholder group. We welcome any questions you may have about these comments and look forward to your response.

Lenox Dale Walk Audit

Lenox Dale Walk Audit

Lenox is participating in the Massachusetts Department of Transportation (MassDOT) Complete Streets Funding Program to secure funds for bicycle and pedestrian infrastructure projects in town. Lenox has completed the first two steps to receive funding by passing a Complete Streets policy and submitting a Complete Streets Prioritization Plan. WalkBoston completed a walk audit in Lenox Center in the summer of 2016. Many of the infrastructure recommendations made in that audit were included in the Prioritization Plan. The Town of Lenox staff wanted to give Lenox Dale residents the same opportunity to participate in a walk audit to identify needed infrastructure improvements in the Dale.

Read the full report here:
WalkBoston-WalkAudit-LenoxDale

Downtown Fitchburg Walk Audit

Downtown Fitchburg Walk Audit

As part of its efforts to improve traffic safety and revitalize its economy, the Gateway City of Fitchburg, Massachusetts (population 40,000) is pursuing Complete Streets as a framework to address the needs of all road users (people walking, biking, driving and taking transit). Through this initiative as well as others, the City aims to generate more activity in its post – industrial downtown and surrounding areas. Fitchburg started implementing Complete Streets in September 2016 by replacing one of the two travel lanes along Main Street downtown with a bike lane and wooden and concrete planter boxes. These changes, which will be piloted for a year, have reduced traffic speeds on Main Street and beautified the neighborhood , creating a safer, more attractive and more comfortable environment for residents and visitors alike.

Read the full report here:
WalkBoston-DowtonWalkAssessment-Fitchburg

Comment Letter: Tremont Crossing Draft Environmental Impact Report MEPA #14900

Comment Letter: Tremont Crossing Draft Environmental Impact Report MEPA #14900

November 23, 2016

Matthew Beaton, Secretary
Executive Office of Energy and Environmental Affairs
Attn: MEPA Office
Analyst: Erin Flaherty
100 Cambridge Street, Suite 900
Boston, MA 02114

RE: Tremont Crossing Draft Environmental Impact Report  MEPA #14900

Dear Mr. Beaton,

WalkBoston has reviewed the DEIR for the Tremont Crossing proposal in Roxbury. We believe that the very auto-oriented proposed development is inconsistent with the urban character of the neighborhood and needs to be substantially modified to benefit its neighbors.

Parking Spaces Proposed are Excessive
The development calls for a multi-level parking garage of 1,371 spaces that will generate 8,000 vehicle trips per day.  WalkBoston questions the need for such a large garage given that the development will be less than two blocks from Roxbury Crossing and Ruggles Transit Stations, and within a 10-minute walk of Dudley Square that is served by twenty bus lines.

By comparison the two large Target Stores in the Fenway (Boston) and Cambridge have only a couple of hundred parking spaces.  Numerous parking studies of big box stores and shopping malls throughout the country have shown that parking lots/garages are underutilized.

The emphasis on parking and downplaying of the use of transit suggests an imbalance for so large a project in the heart of the city.   As stated in the 2012 comment letter from Boston Transportation Department a consistent supply of available parking will counteract efforts to encourage alternative travel modes.

Tremont Street Should Not Be Widened
To accommodate the large number of vehicles accessing and exiting the proposed development Tremont Street is projected to be widened to eight or nine lanes.  Such a wide roadway at this location is incompatible with the urban character of the street and will create safety hazards to the pedestrians and bicyclists moving to and from the transit services, residences and institutions.

Also, the environmental review should include an assessment of the impact of increased traffic on the busway at Ruggles.  Numerous buses leave Ruggles headed for Dudley and WalkBoston has concern that at peak hours buses will be waiting through numerous traffic signal cycles to exit unto Ruggles Street.  The result could be a backlog of congestion from Ruggles to Malcolm X Boulevard.

Roxbury Crossing Development Should be Integrated into the Neighborhood
As currently designed, the development will be an island, separated from its neighborhood setting.  The proposed development has the opportunity to contribute to the street by creating easy walking access from the transit stations as well as nearby residential developments (Madison Park and Whittier Housing) and institutions (Northeastern University).  The Tremont Street Development is located in an area where Transit Oriented Development is particularly appropriate.

Proposed Project Could Acknowledge Changing Retail
The retail environment has changed since the project was proposed 4 – 5 years ago.  More and more shopping is done on line and traditional walk-in retail is struggling.  Evidence of this is in Dudley Square, the heart of Roxbury.  WalkBoston would like to see the City devote greater efforts to supporting viable retail in Dudley.  Promoting retail within a 10-minute walk of Dudley will only further depress the market for shops in Dudley Square.  However even within the proposed development the liveliness of the retail is questionable given that the proposed network of bridges will connect the garage on the second floor, discouraging patronage of the ground level retail.

Ensure Safety of Major Pedestrian Crossings.
The major pedestrian crossings of Tremont Street will take place at intersections with Ruggles/Whittier Street, South Drive and Prentiss Street. The primary crossing is likely to be at Ruggles/Whittier Street, because of the direct access it provides to the Ruggles MBTA Station. Care should be taken to provide for significant numbers of people wanting to cross Tremont Street at this location. Retention of the median strip in the center of Tremont Street would be useful as a refuge for pedestrians who may not be able to cross the entire width of a widened Tremont Street in one signal cycle. Similarly, leading pedestrian signal intervals should be incorporated to facilitate safe pedestrian crossings at the intersection. Analysis should also be undertaken to determine if a crosswalk is truly needed at South Drive, in view of the nearby Prentiss Street crossing.

Thank you for the opportunity to review this proposal. Please feel free to contact us with questions you may have, and we look forward to hearing how our suggestions are incorporated into subsequent revisions to this plan.

Sincerely,

Wendy Landman
Executive Director

Dorothea Hass
Sr. Project Manager

cc: Councilor Tito Jackson
Byron Rushing, State Representative
Deirdre Buckley, MEPA Director
Dana Whiteside, Boston Planning and Development Agency
Kay Matthews, Friends of Melnea Cass Boulevard (FMCB)
Marah Holland, FMCB
Alison Pultinas, FMCB

 

Walk and Bike Assessment Pittsfield

Walk and Bike Assessment Pittsfield

WalkBoston and the Massachusetts Bicycle Coalition (MassBike) working with Toole Design Group (TDG) led a walk and bike assessment in Pittsfield, Massachusetts on Thursday , December 4 , 2014. The assessment is part of the Massachusetts Department of Transportation’s (MassDOT) Bicycle and Pedestrian Safety Awareness and Enforcement Program, funded by the Federal Highway Safety Improvement Program (HSIP), in association with the Massachusetts Department of Public Health. The MassDOT program is a collaboration among Federal, State, regional, and local agencies, along with advocacy groups, WalkBoston and MassBike, to improve pedestrian and bicyclist safety in identified high – crash areas.

Read the full report here:
WalkBoston-WalkandBikeAssessment-Pittsfield