WalkBoston comments on Craigie Dam/Bridge Design Alternatives

WalkBoston comments on Craigie Dam/Bridge Design Alternatives

Date: January 2, 2019

To: Secretary Stephanie Pollack, Administrator Jonathan Gulliver, Andy Paul, Jackie Douglas,
James Kersten, MassDOT, Commissioner Leo Roy, Jeff Parenti, Dan Driscoll, DCR

Re: WalkBoston comments on Craigie Dam/Bridge Design Alternatives

We are relieved that MassDOT and DCR are committed to acting to improve the safety of people walking and biking on this critical roadway segment.

We have reviewed the options that were presented to the community on December 18th and have several comments that are detailed below. However, we do not think that the relatively modest improvements that are planned for Spring 2019 are adequate to providing truly safe walking and biking conditions, and we urge MassDOT and DCR to develop more significant plans for safety for the Charles River bridges.

One approach that WalkBoston would like to see explored is the adoption of a pilot 20 MPH speed limit on all the Charles River Bridges from Harvard Square to the Craigie Dam/Bridge that would test an automated speed enforcement protocol. Over the last month we have attended meetings regarding safety and operations for the BU Bridge, the Longfellow Bridge and the Craigie Dam/Bridge. In each case, the completely fixed and limited right-of-way does not allow for the provision of protected bike accommodations within the roadway right-of-way without reducing the number of vehicle lanes. WalkBoston was distressed to hear suggestions by community members at one of these meetings to dedicate one of the sidewalks to bicycles rather than pedestrians in order to free up roadway space for vehicles (a suggestion that we were pleased was simply given, but then not taken up or discussed by any of the state or municipal staff).

MassDOT has already expressed its interest in adding automated enforcement to the state’s safety tools and we urge MassDOT to vigorously support a pilot program for the bridges. Setting and then enforcing a 20 MPH speed limit on all the bridges would significantly increase the safety of bicyclists using on-street bicycle lanes while at the same time allowing the number of vehicle lanes to remain as they are today.

Comments on Design Options A and B

Craigie Dam/Storrow Drive Intersection

Take the following steps to minimize conflicts between people walking, biking and driving:

  • For turns from Craigie into Storrow Drive put in place (and enforce) a permanent No Right on Red regulation and include the permanently illuminated NRTOR sign
  • Set the vehicle for Craigie Dam traffic approaching Leverett Circle stop line back from the intersection (with Don’t Block the Box markings and enforcement) to allow bikes to queue in a bike box ahead of traffic
  • Provide marked bike lanes from Craigie to Martha Way through Leverett Circle
  • Tighten the turning radius of the corner from Craigie onto Storrow Drive and provide a bike ramp to the Paul Dudley White Path at the corner rather than having bikes get on the sidewalk before reaching the intersection. The very tight sidewalk space should be reserved for pedestrians.

Museum of Science Driveway and Museum Way/Craigie Intersection

  • Add crosswalk striping across the Museum of Science driveway.
  • Narrow the driveway to the greatest extent possible given the truck and bus movements needed for Museum of Science operations.
  • Consider signalizing the driveway entrance to the Museum of Science in coordination with the Museum Way signal.
  • Eliminate the conflicting left turn arrow across the WALK signal at the Museum Way crosswalk across Craigie.
  • Improve the street lighting of the crosswalk across Craigie at Museum Way

Craigie/Land Boulevard/Gilmore Bridge Intersection

Configure the signal timing at the Land Blvd/Craigie/Gilmore Bridge intersection to allow safe pedestrian and bike movements. A detailed description is provided below of the maneuver needed to ride a bike safely through the intersection under current conditions. This is in urgent need of improvement.

  • “At the intersection with Edwin H Land Blvd/ Gilmore Bridge, to feel safe as a bicyclist I will often violate traffic signals. The problem is that, whether traveling either inbound or outbound, if you wait for the light to change, traffic builds up next to you. When the light turns green, you are forced into the middle of a pack of fast-moving traffic, with cars and trucks rapidly accelerating and changing lanes.

    The situation is particularly dangerous when traveling outbound and making a left on Cambridge Street (a route most bicyclists take, as Route 28 gets faster and more dangerous beyond the Cambridge St. intersection). As a bicyclist, if you leave the Gilmore intersection with vehicle traffic, you then have to work your way across 2 lanes of fast-moving traffic to get into your left turn, and then must hold your ground in the middle of four lanes of outbound traffic in order to end up on the right-hand side of the two lane Cambridge St. turnoff. You can also hug the left-hand side of the road by the median strip, but traveling on the left side of the road can be dangerous too.

    I have found navigating the Science Bridge is actually safer when breaking the traffic signals. For example, when traveling outbound, if I hit the red light at the Gilmore intersection, there is a break in the signal when I usually run the red light on my bike. The break occurs between the green light for vehicles coming from Charlestown towards Cambridge, and the following green light for traffic moving inbound on 28. Taking the light this way has dangers too – at least one or two vehicles coming from Charlestown almost always speed through their red light (committing their own traffic violation), and you need to be absolutely sure those vehicles have stopped. Nevertheless, this method still allows me to make my way over to the Cambridge St turnoff without needing to cut across vehicle traffic, and feels much safer to me.”

Cc:
State Senator Joe Boncore
State Senator Sal DiDomenico
State Representative Jay Livingstone
State Representative Mike Connolly
Joe Barr, Cara Seiderman, Cambridge
Chris Osgood, Vineet Gupta, Charlotte Fleetwood, Boston
Becca Wolfson, Eliza Parad, Cyclists Union
Stacy Thompson, Steve Miller, LivableStreets Alliance
Galen Mook, Tom Francis, MassBike
Nate Fillmore, Cambridge Bike Safety

Comments on the DEIR/DPIR for the Suffolk Downs Project, MEPA 15783

Comments on the DEIR/DPIR for the Suffolk Downs Project, MEPA 15783

December 14, 2018

Matthew Beaton, Secretary
Executive Office of Energy and Environmental Affairs (EEA)
ATTN: MEPA Office
100 Cambridge Street, Suite 900
Boston MA 02114

Brian Golden, Director
Boston Redevelopment Authority
One City Hall Square
Boston, MA 02201-1007

RE:  Comments on the DEIR/DPIR for the Suffolk Downs Project
MEPA: #15783

Dear Secretary Beaton and Director Golden:

Thank you for the opportunity to review and comment on the Suffolk Downs project. We offer the following comments on the project’s pedestrian environment, which overall is well addressed.

The project offers generous walking opportunities

The heart of the proposal is a 15-acre park – the Central Common – with walkways surrounding the site and connecting into and through the open space it provides. The Common has been designed as a one-mile running/walking loop. The park has water features with one pond that can be used for skating and another elongated pond that connects into the nearby saltwater Belle Isle Inlet. The Common connects on either end to meeting and performance spaces on plazas leading to the two Blue Line stations.

Main Street, a second north-south walkway, also connects Beachmont and Suffolk Downs Blue Line stations. This street will have wide, landscaped walkways with setbacks to allow for sidewalk cafes and other such uses along its route.

A third walkway, the Active Linear Corridor, parallels Main Street and runs midblock between Main Street and Tomasello Drive. This pedestrian-only street is intended to provide a series of active play spaces for all ages. The proposal is an extraordinary experiment – a half-mile long area that gives nearby space for casual and active uses. Figure 3.37 lists the potential uses of the corridor as active play, jumping mounds, rolling course, flex turf, climbing health, ping pong and jungle gym. Many of these are likely intended for children.

An additional north-south community trail skirts Tomasello Drive and is shown as a two-way bike facility that follows a swale on the side of the property facing the gas tanks, coupled with a sidewalk on the opposite side of the street.

There are several cross streets that connect the four north-south walkways. They vary in scale and importance. Several contain landscaped walkways and add to the many opportunities for walking throughout the project area.

One concern we ask the developer to address with respect to this generously scaled set of pedestrian ways and open spaces is that the play areas along the Active Linear Corridor (with the exception of the block near Waldemar Avenue) are located within blocks intended to be developed not for housing, but office uses, where presumably there will be few children in nearby buildings. As development occurs within the project, the proponents should ascertain if the proposed Active Linear Corridor is located appropriately to serve the intended users who may be living in residences on-site. Active recreational facilities for small children might be more appropriate lining the loop road at the eastern edge of the proposed Common. This route directly serves the three residential areas near the proposed Beachmont Plaza, the Belle Isle Plaza and the “Panhandle” near Route 1A. This route would strengthen the opportunities for residents to use the Common and its central meeting places as well.

East Boston Greenway extension

WalkBoston encourages the proponents to seriously consider a connection to the East Boston Greenway. The existing East Boston Greenway ends at the Belle Isle Marsh, near the Suffolk Downs MBTA station but on the other side of Bennington Street from the station. There is a roadside path/sidewalk paralleling Bennington Street between the main entrance to the marsh reservation and the crosswalk to the Suffolk Downs transit station. This path is used two-way by both cyclists and pedestrians. Extending the path further north toward Revere Beach is not an easy task. The frontage of Bennington Street is spacious and possibly could be the location of an extended route until reaching Everard Street in Revere, where the Bennington route narrows down on the approach to the Beachmont station at Winthrop Avenue.

A potential alternative location for extending the East Boston Greenway that was suggested in the DEIR exists in the large tract of land between the MBTA rail tracks and the Suffolk Downs property line. This land is nearly 10 acres of unused space and has no buildings on it between the Suffolk Downs transit station and Washburn Avenue in Revere. Depending on ownership the tract might be made available. If owned by the MBTA, the property might become available to the developer, who could include a north-south path that would be available as a substitute for the Bennington Avenue route and link the property into the regional Greenway network as a principal route in the system.

Possible new walking connections into Orient Heights from the project site

A decision has been reached with neighborhood residents that vehicular access between the project site and Orient Heights will not be provided. Several walking issues should be addressed to overcome this lack of street connection.

  1. Walley Street and the Suffolk Downs MBTA station
    Walley Street, just off Waldemar Avenue, is the current road and pedestrian access point to the Suffolk Downs transit station for Orient Heights residents. This approach currently works for all access to the neighborhood, and the proposed development adjacent to it respects existing neighborhood preferences and adds no vehicular access to the existing site. Instead the proposal adds a new access route for vehicles and shuttle buses to drop off transit-riders from the new development as close as possible to the transit station; this connection appears to be a part of the proposed Belle Isle Plaza. It is a bit unclear how this new connection will meet with existing streets and paths, and the developer, the City of Boston and the MBTA will need to coordinate the proposed new access with the existing street and path layout.
  2. South project boundary – Waldemar Avenue
    A community path along the full length of the south project boundary (approximately ½ mile long) connects the bus stop on Route 1A with the Suffolk Downs MBTA station at Walley Street. This is a good walking connection for East Boston/Orient Heights residents, as it provides connections to transit in two directions. From the Suffolk Downs station to a location about halfway between the MBTA station and Route 1A, an on-site road (also called Waldemar Avenue) parallels the path. It will be lined with small residential buildings backing onto the path. The Waldemar Avenue/Tomasello Drive intersection is well located to connect pedestrians into Orient Heights via the sidewalks of the Orient Heights public housing project and especially via Crestway Road, a short street that links to Faywood Avenue and directly to the Manassah Bradley School.
  3. Safe walking access to schools
    The proponents include no discussion or description of schools and safe routes to schools. For any students who are attending nearby schools, walking to school should be safe and convenient. The proponents of the project should work with both the City of Boston and the City of Revere to assure safe passage for all students living in Suffolk Downs and using local schools.

    WalkBoston suggests additional examination of the role of schools on the walking paths proposed for the development. Students attending the Bradley School from both Suffolk Downs and Orient Heights would be well served by a neighborhood connection to the proposed path network. In addition, we suggest looking at whether a playfield that includes active recreation uses could be located where Crestway Road meets Waldemar Avenue (Block 5 on Figure 3.7). A playfield located here could serve both the school and the new neighborhood at a logical intersection of the walkways that are such a positive element of the project.

    For children living in the Boston portion of the Suffolk Downs neighborhood, access to schools in the Orient Heights neighborhood will be somewhat constrained because there is no vehicular access between the two neighborhoods, other than the route provided by going out from Waldemar Avenue onto Route 1A between Tomasello Drive and Boardman Street.

    The closest Revere school is the Seacoast School, located on Bennington Street, which can be reached from Suffolk Downs only by an indirect route through the Beachmont transit station and by sidewalks for a further 1000 feet. The Garfield Elementary and Middle School is about 1500 feet north of Winthrop Avenue. Revere High School is located approximately one mile north of Winthrop Avenue.

Route 1A along the western border of the project area

WalkBoston has significant concerns about the proponent’s plans for the Route 1A corridor. Adding a third vehicular travel lane in each direction and increasing roadway capacity from 2,100 to 3,300 vehicles in each direction – an increase of 57 percent – threatens to undermine the ambitious transit-oriented development goals the proponent expresses elsewhere in the proposal. Increased vehicular traffic will also mean more greenhouse gas emissions and more risks to pedestrian and bicyclist safety. We question the need for more vehicular travel lanes on Route 1A between Furlong Drive and Boardman Street, as most southbound traffic on Route 1A will likely access and exit the project site via Route 145/Winthrop Avenue, rather than the proposed “super street” corridor. Similarly, because of the extensive footprint of the Tomasello Drive intersection with Route 1A, we assume that the proponents are anticipating that most of the northbound Route 1A traffic into the site will enter via Tomasello Drive and exit via the same intersection.

The proposal to add more vehicular travel lanes within the existing roadway footprint will also undermine pedestrian and bicycle accommodations along Route 1A. Adding lanes will likely require narrowing or eliminating the current highway median, which would otherwise provide an important pedestrian refuge at the new proposed crossings at Tomasello Drive and Furlong Drive. Absent such a refuge, pedestrians will be forced to cross six highway travel lanes at once, which increases safety hazards and diminishes connectivity between the project site and development and recreation opportunities along the Chelsea Creek. Adding travel lanes while maintaining a five-foot roadway shoulder also reduces the space available for truly safe and protected bicycle facilities. The current proposal for a narrow five-foot unprotected shoulder alongside fast-moving highway traffic does not provide any meaningful protections for cyclists.

Instead of the “super street” concept, we encourage the proponents to reconsider Route 1A as a truly multimodal transportation corridor, with no new travel lanes except those built as dedicated pull-offs for buses on both the northbound and the southbound sides of Route 1A. This will further advance the proponent’s vision for transit-oriented development, while also maintaining space for protected pedestrian facilities in the median of Route 1A. Dedicated bus pull-out lanes also provide for increased bus service. As part of such a plan, the proponent should commit to improved bus stop facilities along Route 1A, including benches and shelters. Pull-outs for bus lanes and bus stop facilities should be considered for replacement of the existing unsafe bus stops at Furlong Drive, the jug handle at the tank farm, Tomasello Drive and Boardman Street.

Pedestrian access to Route 1A bus connections 

Existing conditions for pedestrians and bus riders on 1A are terrible. We are glad that there are proposals that provide safe access for pedestrians to bus stops on Route 1A, including new pedestrian crossings at Tomasello Drive and Furlong Drive. The principal users of bus services may be most concerned about access at Tomasello Drive. The existing Tomasello Drive intersection is proposed to be divided into two components – one for traffic entering Suffolk Downs from Route 1A and the other for traffic exiting Suffolk Downs onto Route 1A.

Pedestrians from both Waldemar Avenue and Suffolk Downs are affected in a dramatic way by this proposal, which would add a bus stop island for northbound buses on Route 1A, a pedestrian island between the travel lanes for traffic exiting the site onto Route 1A, and a right-turning slip lane for traffic entering the site from Route 1A. We encourage the project proponents to also consider a more conventional T design for this intersection, similar to what exists now.

Under the proposed new configuration, most pedestrians will approach the intersection on the south side of Tomasello Drive, as that is the path that connects to the residential areas in the “Panhandle” of Suffolk Downs, as well as the homes in Orient Heights. The bus stop on the Suffolk Downs side of Route 1A would be located directly adjacent to the Tomasello Drive exit lanes onto Route 1A. Getting to the bus stop would require passengers to cross the right-turning slip lane from Route 1A to reach the bus stop island. The crossing of the slip lane is likely to be more dangerous for pedestrians than other crossings, as traffic entering the site may not be stopped by the Route 1A signals. This should get more attention in final designs; one option would be to install a signal protecting pedestrians and a crosswalk.

Pedestrians crossing Route 1A are primarily bus passengers using southbound Route 1A bus services. They, too, are required to cross the potentially dangerous slip lane from Route 1A into Tomasello Drive, along with the southbound lane that serves traffic exiting from Tomasello Drive. Pedestrians would halt on the island between the travel lanes exiting the site and cross directly to the bus stop on the west side of Route 1A. This movement can be made concurrently with the signal phase allowing exiting traffic to move from Tomasello Drive onto Route 1A. Designers of the traffic flow for this intersection must consider the possibility that walkers cannot cross without a median break that affords refuge and safety for pedestrians who cannot cross in one signal phase.

Offsite mitigation for pedestrians and bicyclists

The project proponents outline an extensive program for offsite traffic mitigation in Section 6.10 of the DEIR, detailing numerous operational improvements for motor vehicles broken down by specific locations and intersections. Pedestrian and bicycle improvements are described only briefly and in largely general terms at the end of this section. We encourage the proponents to provide more detailed plans in the FEIR for pedestrian and bicycle improvements at the same locations and intersections they are prioritizing for offsite traffic mitigation.

Thank you again for this opportunity to comment on the proposals that affect pedestrians in the Suffolk Downs project.

Sincerely,

Wendy Landman
Executive Director

Cc:
Bob O’Brien, City of Revere

Page Czepina, MEPA Office

Tim Czerwienski, Boston Planning and Development Agency

Boston Comment Letters in 2018

Boston Comment Letters in 2018

WalkBoston reviews selected development and transportation projects that are located in areas of particular importance to people walking, or that could have impacts on many existing (or future) pedestrians. Comment letters are submitted to the appropriate state or local public agencies.

Comments on the findings of the Independent Review Team for the Throat portion of the I-90 Allston Interchange Project

Comments on the findings of the Independent Review Team for the Throat portion of the I-90 Allston Interchange Project


November 30, 2018­­­

Stephanie Pollack
Secretary of Transportation
State Transportation Building
10 Park Plaza
Boston, MA 02116

Matthew Beaton
Secretary of Energy and Environmental Affairs
Saltonstall Building, 100 Cambridge St #900
Boston, MA 02114

Re: Comments on the findings of the Independent Review Team for the Throat portion of the I-90 Allston Interchange Project

Dear Secretary Pollack and Secretary Beaton:

As advocates for people walking, running, meandering and biking on the paths along the Charles River, we have reviewed the two documents prepared by the Independent Review Team (IRT) on the I-90 Throat area of the I-90 Allston Interchange Project. We have followed the IRT work closely, and appreciate the Team’s ability to deal with time constraints and the complexities of the project while including direct contacts with members of the I-90 Task Force.

The original options for the Throat area have been successfully updated and improved by the IRT. We recommend that they be discarded from further consideration. Whether those options are discarded or not, issues remain that must be resolved prior to MassDOT’s selection of a preferred alternative to carry into the Final Environmental Impact Report (FEIR).

Issues to resolve before choosing a preferred alternative

A. Good pedestrian and bicycle access for the heavily used Paul Dudley White (PDW) path on the Boston side of the river must be maintained throughout the multi-year construction period. The reports state that a replacement is ‘to be determined.’ Here are some possibilities:
  1. A temporary boardwalk in the river.
    • A boardwalk in the Throat would be short – roughly 1800’ long.
    • A boardwalk could maintain access for bikes and pedestrians close to the existing route of the PDW path.
    • Temporary paths can be used in the wider segments of the riverfront at each end of the Throat.
    • The design of a temporary boardwalk would need to be attentive to safety. Wooden boardwalks are often slippery and difficult for users.
  2. Limited fill in the river to support temporary paths.
    • Fill would be relatively minor – a narrow strip roughly 1800’ long.
    • Fill would be coordinated with the mandated ecological improvements to the river’s edge.
  3. Alternatives that detour all walking and biking to the Cambridge side of the river are not adequate. However, improvements must be made to encourage some shifts to the Cambridge path.
    • For walkers and bicyclists coming from the Cambridge path, connections on the Boston side of the river between the Mass Ave Bridge and the riverfront use a steep and narrow ramp that connects only to the downstream sidewalk and bike lane. It is not possible to safely cross Mass Ave at the entry to the ramp.
    • The walking and biking connections across the BU Bridge in Cambridge are difficult, and the path on the downstream side of the bridge is inadequate and unsafe for all users.
  4. A significant wayfinding system is needed to provide safe temporary routings.
B. All options must include ecological restoration of the banks of the river, between the BU and the River Street Bridges, to repair the neglected, unattractive, degraded and eroded bank. Ecological restoration would:
  1. Provide additional parkland, integrated with it and expanding upon the areas in the current options.
  2. Protect the river bank from further degradation by stabilizing the eroded edge.
  3. Restore aquatic habitat for the fish run for alewives, blueback herring and American shad, as they return to the river each year to spawn.
  4. Reduce stormwater runoff discharging to the river via overland flows and outfalls, including the 13 outfalls along Soldiers Field Road in the Throat Area.
  5. Provide flood resilience, control and storage capacity for precipitation-based inland flooding.
  6. Provide a solid footing for construction of improvements at the river’s edge, including a new PDW path or a new SFR.
  7. Develop landscape strategies and designs that provide Section 4(f) mitigation.
  8. Remove invasive species, dead trees and replant with native vegetation.
  9. Help plan for the riverfront parkland, a water-dependent use under Chapter 91.
  10. Help meet historic requirements for the Charles River Basin Historic District included in Section 106 of the National Historic Preservation Act and Massachusetts Historical Commission review.
  11. Comply with the Article 97 no net loss policy that requires replacement of parkland that is to be taken by the Project.
C. Mitigation for the impacts of each option must be provided prior to MassDOT’s selection of a preferred alternative. The full implications of each option cannot be known without exploration of how the impacts of each are to be treated.
In addition, the provisions for treating impacts will vary by option, with some being more attractive than others. Showing what mitigation can do to each option will help with the process of making and justifying a choice:
  1. Physical improvements intended as mitigation for impacts from highway construction must be provided close to the site of the impacts.
    • The IRT documents suggest that the addition of parkland 1,000 feet upriver will mitigate the loss of historic parkland in the Throat. Many Task Force members disagree with that conclusion.
    • Replacing parkland within the Throat area is a valuable and necessary element of mitigation to replace parkland taken by highway uses.
  1. Mitigation can make some options more attractive than others.
    • For example, if the riverbank restoration requires the addition of fill to the river edge, that fill can serve as an extension to the narrow strip of riverfront parkland and integrate with it either as landscaped edging or as a grassy area for exploration, sitting, walking and picnicking.
    • A wider park is a major element of mitigation for localized impacts from highway construction.
  2. Mitigation for each option is required by the federal legislation that governs the use of Section 4F (for parks) and Section 106 (for historic resources).
    • It seems likely that the analysis required by Section 4F and Section 106 will result in an exploration of alternatives to discern the least harmful alterations to the 20th century parkway (a highway bounded by two landscaped strips of land) that this project will be removing.
    • It is important to integrate the work done by Sasaki on pathways along the riverbank to meet the “all possible planning” requirements of Section 4F.

Choosing a preferred alternative

The following comments and questions are offered to help MassDOT select a preferred alternative for the Throat:

A. The Hybrid Variant Option

We are drawn to this option because it is more respectful of the need for improvements along the river’s edge than the other options, providing space for riverbank restoration, dual paths, and landscaping that will enhance the riparian environment and improve the quality of the park for all park users and non-motorized commuters along the river. However, the IRT report has developed the option only in brief outline form. The basic elements of the proposed option must be retained as they form the basis for its attractions.

  1. The dimensions of the riverfront park, as shown by the Independent Review Team on page 219 of the report, must be retained to provide an adequate park width throughout the Throat area.
    • The total dimension of the riverfront park is 42’ between the edge of the river and the wall of the Westbound Turnpike boat section.
      • The goal of two separated paths – one 10’ wide for bicyclists and one 10’ wide for walkers/runners – have been included.
      • A 16’ landscaped buffer is between the edge of the bicycle path and wall of the Westbound Turnpike boat section. This portion may also be used to fulfill many of the stormwater and resiliency goals of the project.
      • A 2’ buffer lies between the river’s edge and the walking path and a 4’ buffer between the bicycle and walking paths.
  1. These dimensions are in danger of being diminished as MassDOT and FHWA resolve questions about adding more shoulder space to the Turnpike.
    • An additional 2’ for a breakdown lane on right side of both WB and EB cross-sections of the Turnpike would take 4’ away from the 16’ landscaped buffer.
    • An additional 2’ for a breakdown lane on both sides of the WB and EB cross-sections of the Turnpike would take a total of 8’ away from the 16’ landscaped buffer.
    • Other roadway dimension issues may still emerge – all widenings of the highway elements of the project will diminish the 16’ landscaped buffer.
  1. If more space is required for highway elements this must be provided without diminishing parkland.
    • Make use of additional land on the south side of the project area. BU has been very helpful on the development of solutions that do not include a Turnpike viaduct and the use of BU property appears to be an integral part of both the at grade and the Hybrid options. The IRT report highlights other opportunities to use BU property. See “Maximum Potential Encroachment on Boston University Property” (Figure 6.1, p. 190 IRT Report).
    • Restoring and enlarging the degraded and unstable river bank, which could add some land that would serve as a landscaped buffer between the paths and the water sheet of the river.
    • The possibility of placing Soldiers Field Road above the eastbound, as opposed to the westbound, lanes of the Turnpike is intriguing and opens the possibility that the park-like setting might be significantly widened and potentially enhanced. We look forward to analysis of the possibility.
  1. Footbridges to connect the riverfront park and its walking and cycling paths with the community must be provided as an integral part of the project over the Turnpike, Soldiers Field Road and the rail lines.
    • Access for non-motorized travelers between the community and the river is severely limited. The existing footbridge over Storrow Drive just behind the chapel on BU’s campus is not ADA compliant and does not include any bicycle access. The next access is Massachusetts Avenue, a half mile east, or the proposed New Cambridge Street a half mile west. None of these locations can directly serve all users or people coming on foot or by bicycle from Packard’s Corner or Brookline.
    • A bicycle and pedestrian bridge has been proposed for a location at the end of Agganis Way, where it currently overlooks the rail lines. Agganis Way already connects to Commonwealth Avenue and a link to the proposed West Station could be readily made from that location and would serve BU students, South Allston and Allston Center, the northernmost neighborhoods of Brookline, bordering Commonwealth Avenue for nearly a mile.
    • An additional bicycle and pedestrian bridge connection has been proposed to connect the riverfront to Commonwealth Avenue near the BU Bridge. An exact location for this proposal has not been defined, but it would serve the area’s many walkers and bicyclists who are currently cut off from the river’s path network.
  1. The Hybrid Variant includes the reconstruction of the Little Grand Junction railroad bridge as an integral portion of the project, which would allow the straightening of the riverside Paul Dudley White Path, and removal of the boardwalk that intrudes into the river under the BU Bridge where it complicates and impacts boating activities.
    • This bridge is not a contributing element to the Charles River Basin Historic District, as claimed in the DEIR, according to DCR.
    • Elimination of the boardwalk under the BU Bridge, made possible by rebuilding this bridge, is a high priority among boaters.
  1. A method of attenuating sound must be included to dampen noise impacts from the Westbound Mass Turnpike on the surroundings including:
    • The IRT addendum report describes the possibility of a noise wall between the boat section and the paths in the riverfront parks, which diminishes the width of the park.
    • Other options must be explored.
B. The At-Grade Option

The At-Grade option remains a viable possibility and must be retained as an important alternative to continue analyzing because of the superior profiles the fully at grade options achieve in the essential Aggasis to Charles River Basin pedestrian and bicycle connection, in comparison with the highway profile required to clear the elevated Soldiers Field Road element of the Hybrid Variant. We have reviewed this option in prior comments submitted about the DEIR.

  1. The At-Grade option removes the viaduct and creates a more livable environment for the BU West Campus and the surrounding neighborhoods. A thorough investigation of ways to make the option more acceptable would have included adding more land from the BU campus to make the right-of-way wider and remove the option from its intrusion onto the river bank, where construction permits become difficult.
  2. The At-Grade option described in the IRT report is difficult to support. The paths and parkland are much too narrow. We suggested frequently that the Paul Dudley White paths could be constructed either on a boardwalk or on limited fill at the river’s edge. These options have not been explored, yet we think they would have been successful in meeting goals related to riverbank restoration, water quality, parkland and the riverfront paths. We suggest that they are still worth looking at to solve problems related to the river’s edge.
  3. Extensive design and environmental studies that describe the visual, accessibility, noise and air quality conditions for walkers and bicyclists are needed for the option that includes walkways suspended or cantilevered above Soldiers Field Road. The option remains interesting because it offers a high-level connection to potential pedestrian and bicycle bridges to Commonwealth Avenue.
C. The Highway Viaduct (HV) Option

We have reviewed this option in prior comments submitted for the DEIR. In view of the numerous objections to this option, we do not think that any Turnpike viaduct replacement option should be carried forward. These objections include:

  1. It is a barrier to an essential pedestrian and bicycle connection between Commonwealth Avenue and the river paths, as needed to provide a complete walking and biking network and as requested by the surrounding neighborhoods of Allston and Brookline.
  2. It cannot remove the horizontal curve on the Turnpike adjacent to the Commonwealth Avenue Bridge.
  3. During construction it cannot maintain two track service on the Worcester commuter rail line, thus negatively impacting riders from the Western corridor, and forcing spillover traffic onto local streets.
  4. The new HV option, at the tightest section of the Throat, has very difficult construction design issues where the Grand Junction is rising, because limited space is available for the Turnpike to hover over Soldiers Field Road.
  5. Boston University has generously offered space for widening the Throat for all purposes, but not if the Viaduct is to be rebuilt.
  6. The Houghton Spur, an early reason for rebuilding the viaduct, is to be abandoned.
  7. It does not include replacement of the Grand Junction bridge, a critical component of rail service into Cambridge, and would, if replaced, allow straightening and widening the Paul Dudley White Path and removing the boardwalk under the BU Bridge.

We believe that the next phase of comparison of plans should compare two options:

  1. A Hybrid combined with a Sasaki plan to make the necessary further improvements.
  2. A fully At-Grade combined with a Sasaki plan to achieve the necessary further improvements.
    This would fulfill the commitment by the Secretary to make each plan as good as it can be before making a final decision on which plan, including its necessary mitigation, should be included in the FEIR.

We have worked long and hard together on this project during the past 4 1/2 years. Now that we are getting closer to the decision among the options, we hope that MassDOT’s choices will reflect the opinions of the Task Force and the many hundreds of comments that have been shared by the public and elected officials.

Thank you for your attention to our concerns.

Sincerely,

Wendy Landman, Executive Director, WalkBoston
Galen Mook, Executive Director, MassBike
Laura Jasinski, Executive Director, Charles River Conservancy
Stacey Thompson, Executive Director, Livable Streets
Becca Wolfson, Executive Director, Boston Cyclists Union
Josh Fairchild, President, TransitMatters
Emma Walters, Executive Director, Allston Village Main Streets
Anthony D’Isidoro, President, Allston Civic Association
Jason Desrosier, Mgr, Community Building, Allston-Brighton Community Development Corporation

I-90 Task Force Members and Allston Residents

Jessica Robertson, Harry Mattison, Paola Ferrer

WalkBoston comments on JP/Rox Transportation Action Plan

WalkBoston comments on JP/Rox Transportation Action Plan

November 14, 2018
Boston Transportation Department
1 City Hall Square
Room 721
Boston, MA 02201

RE: WalkBoston comments on JP/Rox Transportation Action Plan

To whom it may concern,

Thank you for the opportunity to comment on proposed projects for the JP/Rox Transportation Action Plan.

WalkBoston supports the plan’s commitments to multimodal transportation and to expanding walking, biking, and transit options. Piloting a bus/bike lane on Columbus Avenue and a morning bus lane on Washington Street will provide residents and commuters with low-cost alternatives to car transport and improve roadway safety, public health, and environmental quality. To support current and future bus usage, improving bus stops to ensure safe pedestrian access and comfort is critical. We encourage the City to work with the MBTA to ensure the presence of crosswalks, ADA-compliant curb ramps, and benches at bus stops throughout the JP/Rox focus area.

WalkBoston is also pleased to see “Egleston Square Intersection Improvements” identified as a priority project. The proposed concept plan to install curb extensions at the intersection of Columbus Avenue and Washington Street will reduce long pedestrian crossing distances and help calm traffic. It is our understanding that Boston Transportation Department (BTD) intends to conduct a temporary test of these measures. Such a test can be conducted at low cost in the near term using paint, plastic flex posts and/or planters, and we urge BTD to do so quickly to lay the groundwork for a more permanent installation.

In addition, WalkBoston is encouraged to see several other projects that advance pedestrian safety and traffic calming, including “Pedestrian Crossing Improvements Throughout Neighborhood,” “Atherton Street Bike Connection/Traffic Calming,” “School Street Safety Improvements — paint and signage,” and “Amory Street Traffic Calming.” However, we are disappointed and concerned that the proposed timelines for implementation are overly lengthy and vague. The first three of these projects are characterized as short-term (0-5 years), and the last is characterized as long-term (5+ years).

It is hardly reasonable to suggest that a potential five-year wait for simple pedestrian crossing and traffic calming improvements is a meaningful short-term measure. We urge BTD to commit to implementing these critical safety projects in the next 1-2 years in the Draft Action Plan, and to create specific and actionable roadmaps for doing so. Previous improvements in other parts of the City, such as installing a protected bike lane on Beacon Street and creating safer crossings on Tremont Street using paint and plastic flex posts, were planned, designed and implemented within 1-2 year timeframes and can serve as models for future improvements in the JP/Rox focus area.

The notion that simple fixes to our streets can be delayed for up to five years is also not reasonable when one considers that some of the proposed projects have already been on BTD’s radar for over two years. We again submit our October 2016 Egleston Square walk audit report (attached), which featured participation from BTD staff, to help inform your process moving forward. Our walk audit highlighted numerous opportunities for improved pedestrian crossings and traffic calming in and around Egleston Square, which we hope to see implemented in the next 1-2 years as outlined above.

We also encourage BTD to provide more specific timelines for all the proposed projects, with implementation in the next 1-2 years frontloaded to the fullest extent possible. If certain projects are not possible in the next 1-2 years, BTD should provide a rationale for why longer-term implementation is needed.

Thank you for your consideration of these issues.

Sincerely,

Wendy Landman
Executive Director

Cc: Chris Osgood, Chief of Streets
Gina Fiandaca, Transportation Commissioner
Vineet Gupta, Director of Planning, Boston Transportation Department
City Councilor Kim Janey
City Councilor Matt O’Malley
City Councilor Michelle Wu
City Councilor Frank Baker
City Councilor Ed Flynn
Carolyn Royce, Egleston Square Neighborhood Association
Robert Torres, Urban Edge
Becca Wolfson, Boston Cyclists Union
Stacy Thompson, LivableStreets Alliance