Tag: Worcester

Lead a Jane’s Walk this May in your neighborhood

Lead a Jane’s Walk this May in your neighborhood

image

Jane’s Walk is happening the first weekend of May (5th-6th-7th).
Last year, 1,000+ walks happened all over the globe!

Think of this as an opportunity to:

  • start a conversation with your neighbors,
  • continue highlighting safety issues that have been identified through initiatives like Boston’s Neighborhood Slow Streets application process
  • get outside and enjoy a weekend in May!

Create your walk idea on Janeswalk.org, or get in touch with us at WalkBoston (contact Brendan!). We’re happy to help you or your neighbors with suggestions, promote your walk, and answer any questions you may have.
We look forward to helping you get out walking!

Edit: We’ll add neighborhoods/cities/towns below that will be hosting walks on this post (and include links to the separate walks within the communities as we find out about them.) 

Boston – West End – “Jane’s Walk West End Tour”
Meet at the West End Museum
Saturday, May 6, 2pm
http://janeswalk.org/united-states/boston/janes-walk-west-end-tour/

Boston – West Roxbury – “West Roxbury Walk Audit”
Meet at the Hastings Street Lot
Saturday, May 6, 2pm
http://janeswalk.org/united-states/boston/west-roxbury-walk-audit/

Boston – Jamaica Plain – “Growing the City: Washington St from Forest Hills to Green St”
Meet at Brassica Kitchen & Cafe
Sunday, May 7, 11am
http://janeswalk.org/united-states/boston/growing-city-washington-st-forest-hills-green-st/

Boston – Roslindale – “Roslindale Gateway Path & proposed Blackwell Path Extension”
Meet at SE corner of the Arboretum (look for Walk UP Roslindale Banner)
Sunday, May 7, 1pm
http://www.walkuproslindale.org/weblog/2017/04/21/janes-walk-planned-sunday-may-7-at-1-pm-start-at-the-southeast-corner-of-the-arboretum/

Cambridge – “The Dense Layers of History in Old Cambridge”
Meet at Out of Town News Kiosk, Harvard Square
Saturday, May 6, 10:30am
http://www.janejacobswalk.org/upcoming-2017-walks/the-dense-layers-of-history-in-old-cambridge

Worcester – Jane Week (May 1 – 7, 2017) gives Worcester residents and visitors a chance to connect to each other, explore Worcester by foot and participate in interesting discussions on how we can enhance the design and function of our city. – 20+ events and walks throughout Worcester.
http://janeswalk.org/united-states/worcester-ma/

Lowell – “Labor Movement in Lowell”
Meet at Lowell National Park Visitor Center, 246 Market St
Saturday, May 6, 10:30am
http://richardhowe.com/event/labor-movement-in-lowell-walk/

Dedham – “Walking Tour of Proposed Dedham Heritage Rail Trail”
Meet at the parking lot by the football field/track on Whiting Ave
Sunday, May 7, 4:00pm
Saturday, May 13, 10:00am
http://mailchi.mp/f20ef35375c4/rail-trail-happenings-this-spring

Somerville – “A Metamorphosis of Industrial Buildings Along the Rails”
Kickoff to Somerville’s Preservation Month, ending at Aeronaut Brewery
Saturday, May 13, 9:30am
http://janeswalk.org/united-states/somerville-ma/meta/

Boston – Jamaica Plain – “Walking Tour of Monument Square”
July 1 & August 19, 12:45pm
http://janeswalk.org/united-states/boston/walking-tour-o/

Bicycle and Pedestrian Infrastructure Assessment Worcester

Bicycle and Pedestrian Infrastructure Assessment Worcester

Worcester is one of 18 communities participating in the MassDOT multi-disciplinary program to improve bicycle and pedestrian safety in Massachusetts. One of the components of the MassDOT program is to conduct walk and bike assessments that identify infrastructure challenges to biking and walking, and recommend short- and long-term improvements. These assessments are also a means of building local knowledge of the importance of well-designed bicycle and pedestrian facilities. WalkBoston and MassBike led representatives from the City of Worcester, local advocates, and students on a walk and bicycle assessment of Chandler Street in Worcester. Toole Design Group (TDG) prepared this summary and associated report. These summarize observations of and recommendations to the built environment by team members to increase the walkability and bikeability of the area.

WalkBoston-BicycleandPedestrianInfrastructureAssessment-Worcester

Main Street Comment Letter Worcester

Main Street Comment Letter Worcester

December 18, 2015

Patricia A. Leavenworth, P.E.
Chief Highway Engineer
MassDOT
10 Park Plaza
Boston, MA 02116

Attention: Roadway Project Management Project
File No.606434

Dear Ms. Leavenworth:

WalkBoston is pleased to offer comments on the proposed improvements to Main Street in downtown Worcester. In our work throughout the state, we offer comments on projects to assure that pedestrians will be well served by the proposed changes.

We applaud both the city and the state for the Worcester Main Street project, which, as currently envisioned, supports an improved, sustainable downtown. The traffic calming measures that are included will work toward and help upgrade in the use of downtown to make it a more attractive place for business, for educational opportunities and for cultural activities.

Curb radii and bulb-­outs
It is encouraging to see that the street corners are being designed with tight curb radii. This permits greater flexibility in constructing facilities for walkers, such as curb ramps and, in particular, bulb-­‐outs. The extension of the sidewalks into the street at bulb-‐outs is a proven method of enhancing pedestrian safety. Especially noteworthy are the bulb-­outs shown on both sides of the major street crossing in front of Mechanics Hall. This is an effective method of providing safe crossing for crowds going to or from the hall for cultural events. We encourage the city and the state to look for further opportunities to add more bulb-­outs to the project.

Street trees
 A relatively small number of street trees are shown on the plans. We recommend that the plan include a sufficiently large number of trees to give Main Street more shade and a friendlier appearance. In some cases, this is impossible because of underground utilities, electric lines or other impediments. However, the city should look for additional installations of trees in an area where the goal is to make the street more attractive to shoppers and people doing business downtown.

Pedestrian crossings at traffic signals
We understand that the city and the state are looking at additional methods of assuring pedestrian crossing safety at intersections. We encourage the use of concurrent signals at intersections where they are feasible because of relatively low turning volumes, along with leading pedestrian indicators (LPIs) as part of the signalization. LPIs have been proven to aid in safe crossings by pedestrians due to the fact that pedestrians are more visible to drivers and because they provide extra time they provide walkers to cross the street.

Bi-­level sidewalks
A major project element is the bi-­level sidewalks on the west side of Main Street. These sidewalks are designed to solve gradient problems on the existing slope of the sidewalks that arise in applying ADA design standards as part of the street upgrade. We understand that the bi­‐level sidewalks are designed to avoid constructing a sidewalk with a high curb that could be dangerous for walkers.

The result is the design of two sidewalks ‐ an upper sidewalk, nearest the buildings, which varies from some 12’ to more constrained widths that are 6’ or narrower. These variations appear to be required because the right-­of-­way boundary is not straight and many of those variations have long existed along the west side of Main Street.

The lower sidewalks, nearest the street, appear in typical cross‐sections to be a continuous 4’ in width throughout the project. The plans suggest that this 4’ width of the lower sidewalk will always be a hard surface –paved with stamped colored cement. The hard surface, along with proposed parking meters, implies that pedestrians will be encouraged to use the lower sidewalk. The lower sidewalk also includes several bus stops. In order to meet accessibility requirements, a 3’ wide path without obstacles is required to provide handicapped accessibility on sidewalks. However, the lower sidewalk includes street light poles and pits for street trees. Light poles and trees are shown in central locations along the lower sidewalk – i.e., 2’ from both the bollards and the curb. This results in segments of the lower sidewalk that are less than 3’ wide and thus do not meet ADA standards for walkability. The lower sidewalks need to be widened to safely and accessibly accommodate walkers. Widening to a 6’ width is recommended because that width would allow for tree planting and accommodation of street lights, etc. and still be able to provide a 3’ clear width as required by ADA. The extra width of the sidewalk might be obtained by reducing the widths of the two 6’ bicycle lanes to 5’ each. This gains 2’ of width that can be added to the lower sidewalks, making them 6’ wide. Within this space a 3’ clear walkway could be provided to meet ADA standards. A 3’ wide strip would then be available for installation of street trees, parking meters, street lights and signs.

Thank you for the opportunity to comment on this important project. Please feel free to contact us if there are any questions.

Sincerely,

Robert Sloane
Senior Planner

Brendan Kearney
Communications Manager