Concord Avenue Reconstruction Comment Letter

Concord Avenue Reconstruction Comment Letter

March 5, 2009

Cambridge Department of Public Works 147 Hampshire Street,
Cambridge, MA 02139

Attn: Rebecca Fuentes, Community Relations Manager

Dear Ms. Fuentes:

WalkBoston is the Commonwealth’s leading advocate for pedestrians and safe walking. We work throughout the state – encouraging walking, supporting pedestrian improvements and sponsoring walks. We have extensive experience in helping residents and local governments with pedestrian issues, safe routes to schools, and safer street crossings and sidewalks.

We are very pleased to support the application by the City of Cambridge for Public Works Economic Development (PWED) funding for the Concord Avenue Reconstruction project, from Fresh Pond Parkway to Blanchard Road. The proposed improvements will make the corridor safer and more attractive for walkers, thus encouraging local trips on foot, and longer trips via transit.

We believe the balance of improvements for pedestrians, bicycles and vehicles is an appropriate mix for this important urban corridor.

Sincerely,

Wendy Landman
Executive Director

The Commons at Prospect Hill SDEIR Comment Letter

The Commons at Prospect Hill SDEIR Comment Letter

February 18, 2009

Secretary Ian Bowles
Executive Office of Energy and Environmental Affairs
100 Cambridge Street, Suite 900
Boston, MA 02114

RE: Supplemental Draft Environmental Impact Report (SDEIR)
The Commons at Prospect Hill
MEPA # 13952

Dear Secretary Bowles:

Thank you much for the opportunity to comment on the evolving plan represented in the SDEIR for The Commons at Prospect Hill in Waltham.

We are commenting this time to underscore our feeling that opportunities are being lost to create a development that could be a model for the 21st c. We are certain that proponents for The Commons at Prospect Hill could go further toward ensuring that walking (and bicycling and transit use) can be supported by the new development.

Summary of Comments
We note that the SDEIR has incorporated few, if any, adjustments to the proponent’s DEIR plan that reflect the comments raised by WalkBoston about that plan’s pedestrian circulation and safety needs and possible modifications to the physical layout of the project to encourage walking.

The following comments relate to pedestrian safety and circulation throughout the site. We have added suggestions that we think should be considered to make the development more attractive to pedestrians.

1. Pedestrian safety along the rail trail

  •  Access to adjacent buildings. We continue to be concerned that there do not seem to be any places where pedestrians can access new buildings from the trail without crossing driveways or parking lots. A more extensive effort should provide routes that are safe for pedestrians moving within parts of the project. For example, access to Buildings 10 and 11, immediately adjacent to the rail trail, could be included and made attractive.
  • Trail/site driveway crossings. Unprotected pedestrian crossings along the rail trail are not safe for walkers. The crossing of the rail trail at the East Driveway has the potential for being difficult to use and unsafe for each crossing. It seems insufficient to state that safety issues related to crossings will be dealt with at a later date. At the Central Driveway and at the Primary Driveway, crossings will be signalized, but extremely heavy site traffic is anticipated, and pedestrian phases must be built into the signalization of both intersections.

2. Pedestrians in the Main Street corridor

  • The relatively high density of development proposed for the entrance areas near Main Street would suggest that a pedestrian-friendly precinct is especially important in this part of the site. However, the sidewalk along Main Street remains cramped and narrow, with insufficient space to accommodate both walking and bicycling.
  • Snow storage in winter will further complicate pedestrian movement along this frontage. No provision is evident for snow storage along this perimeter.
  • Extending the sidewalk partially u n der Building No. 9 would make it more useful as the major entry to the site that also must accommodate MBTA transit access and the rail-trail as it crosses the site. As the front door of the site, it should be extremely welcoming to all who arrive on foot, by transit and bike.

3. Pedestrians in the Lifestyle Center
The layout of the Lifestyle Center, comprised of Buildings 5,6,7,8 and 9, is unchanged from the DEIR. It remains a problem area that is largely unsupportive of safe and attractive pedestrian activity. About 180 parking spaces are planned to be the focus of the pedestrian-oriented Lifestyle Center area, and they separate all the buildings with double rows of parking and a traffic circle. These concessions to cars are made despite the existence of a very large parking garage, which will abut the parking lots at the heart of the Lifestyle Center – the traffic circle – adjacent to Building 6. To cope with these liabilities, we suggest:

  •  Limiting parking on both sides of Lifestyle Center streets to parallel curb parking rather than diagonal parking, and narrowing the street in the regained space.
  • Reserving a portion of the wide sidewalks on the Lifestyle Center streets solely for pedestrians, with outdoor cafes and other attractions to make it lively.
  • Adding retail spaces on the ground level of the garage to enlarge the variety of business options in the Lifestyle Center and attract more pedestrian/customers.
  • Connecting Building 9 more directly with the Lifestyle Center by providing sidewalks on both sides of the building all the way to Main Street, and by including retail facilities on the ground floor to attract more pedestrians and to make the walk more interesting.
  • Connecting Building 3 more directly to the Lifestyle Center. Presently located immediately behind the parking garage, Building 3 is indirectly connected to the pedestrian network via walkways that wind between Building 6 and the parking garage. Whether Building 3 has retail, office or other occupants, it can be directly connected to the Lifestyle Center.
  • Connecting Building 4 more directly to the Lifestyle Center. It is not far from Building 6 in the present plan, but inexplicably unconnected to the Lifestyle Center.

4. Pedestrians in the big box areas
The scale of the remaining development remains sprawling, with large 1-2 story retail structures surrounded by parking. This layout is not conducive to encouraging pedestrian trips. If buildings are to be so widely separated by parking lots, the proponent should make additional efforts to assure that these very lengthy walkways are pedestrian-friendly. Buildings 1, 2 and 11 are so large and so distant from the Lifestyle Center pedestrian ways that they may never become pedestrian destinations.

  • Redesign sidewalks in the outlying areas to make them more direct. Navigating the sidewalks from the Lifestyle Center to Building 11, for example, requires following a formidable, very indirect route that few will follow.
  • Redesign sidewalks leading to outlying large retail buildings to make them landscaped, green corridors with shelters, lights and wayfinding signs added. • Incorporate green walking corridors alongside partially open, functional drainageways inside the parking lots (also useable for snow storage).

5. Walkways in and connecting to the adjacent parks
The abutting Prospect Hill Park and the 20-acre Berry Farm parcel offer opportunities for recreational walkways linked to the development on this site.

  • Connections between Prospect Hill Park, the Berry Farm and the Wayside Rail Trail should be added, perhaps at the east boundary of this site, where parking lots could be skirted.
  • Hillside Road, an existing roadway through land owned by the city in Prospect Hill Park, will be abandoned and truncated as a result of this project. Hillside Road might become the corridor for a walkway within the park along the east side of the site – readily useable by all site occupants. An extension of Hillside Road further north on the site could be located within the buried power line corridor and could eventually extend to Third Street north of the site.
  • Connecting a Hillside Road walkway with the rail trail would apparently involve using the sidewalk along the East Driveway. As an alternative, the City of Waltham might be interested in a Prospect Park corridor between Hillside Road and a yet-to-be planned trail system within the Berry Farm – ultimately connecting with the rail trail.

6. Intersections and the rail trail
The statewide rail trail through the site involves passage through very high density land uses and traffic. Because of this, considerable effort must be made to assure that children and others walking or riding along the rail trail are safe. Three difficult intersections on the site will be crossed by the trail at Primary Driveway, Central Driveway and East Driveway. Additional intersection crossings will be required within the new interchange to be constructed above Route 95/128. All intersections will be very heavily traveled. An extraordinary amount of effort will be required to assure that pedestrian safety at all of these intersections is made secure and convenient.

Thank you for the opportunity to comment on this document. Please feel free to contact us for clarification or additional comments.

Sincerely,
Wendy Landman                                 Robert Sloane
Executive Director                               Senior Planner

Route 181 Reconstruction Comment Letter

Route 181 Reconstruction Comment Letter

November 18, 2008

Frank A. Tramontozzi, P.E.
Chief Engineer Massachusetts Highway Department
10 Park Plaza
Boston, MA 02116

RE: Route 181 Reconstruction and Minor Widening project in Belchertown, MA
Project File No. 604433

Dear Mr. Tramontozzi:

WalkBoston is the Commonwealth’s leading advocate for pedestrians and safe walking. We work throughout the state – encouraging walking, supporting pedestrian improvements and sponsoring walks. We have extensive experience in helping residents and local governments with pedestrian issues, safe routes to schools and safer street crossings and sidewalks.

We appreciate the opportunity to comment on the proposed reconstruction and minor widening of Route 181 in Belchertown and are pleased to have been notified by MHD about the project. We are commenting because we think there may be ways to further enhance pedestrian safety.

As we have seen in the plans, the project focuses on Route 181 between its intersection with Maple Street (the town center) and the Belchertown-Palmer town line. The reconstructed road will have two 11-foot wide travel lanes and 4-foot wide shoulders. The project will include safety improvement measures such as bicycle accommodation; sidewalk reconstruction; enhanced roadway drainage; improved sight distance in some areas; and installation of guardrail, pavement markings and signage.

We are concerned about pedestrian access in the Route 181 corridor for these reasons:

1. Safe Routes to Schools. WalkBoston is involved with a number of communities across the state in providing walking programs and encouragement, along with planning for physical improvements that could better accommodate children walking to school. In Belchertown, sidewalks connect to both the Center School on Rte 181 north of Maple Street and the Cold Spring School on Rte 181 at Old Springfield Road. Pedestrians going to schools are accommodated along Rte 181 by sidewalks between Maple Street and by a sidewalk between Old Springfield Road to a point about 2000 feet south on Rte 181. These sidewalks should be maintained and, if rebuilt, should be maintained at 4’ or 5’ clear walking width. Poles, signs or other impediments should not be located within the clear walking width.

2. Continuous sidewalk on at least one side of the street. Sidewalks are available on both sides of the street between Maple Street and Old Springfield Road and along only one side of Rte 181 to a point about 2000 feet south of Old Springfield Road. Sidewalks should extend outward for at least 1 mile from schools, assuming there are residences where students might live within that radius. Along Rte 181 south of Old Springfield Road and within 1 mile from the Cold Spring School, there appear to be residences that might warrant extending the sidewalk beyond the 2000’ length.

3. Crosswalks. Along Rte 181, crosswalks are provided at the intersection of Rte 181 and Maple Street and Rte 181 and Old Springfield Road. There is a single intersection with Rte 181 at Fuller Street that does not presently have a crosswalk. Consideration should be given to installation of crosswalks at the Fuller Street intersection, in addition to repainting the crosswalks at the two existing intersections.

4. Detailed design. Sidewalks already in place along Rte 181 should be reconstructed if possible – largely to bring them to a standard width. Care should be taken to assure that any widening of Rte 181 does not narrow sidewalk widths. Where possible, sidewalks should be separated from the roadway by a minimum of 4’ to provide greater safety and comfort for walkers along this relatively high speed road.

Thank you for the opportunity to comment on this project. We look forward to working with you and welcome any questions you may have.

Sincerely,

Wendy Landman
Executive Director

Bob Sloane
Senior Project Manager

Cc: MABPAB
MHD Commissioner Luisa Paiewonsky

Meadow Walk DEIR Comment Letter

Meadow Walk DEIR Comment Letter

March 21, 2008

Secretary Ian Bowles
Executive Office of Energy and Environmental Affairs
100 Cambridge Street, Suite 900
Boston, MA 02114
Attn: MEPA Office, Anne Cannaday, MEPA Analyst

RE: Draft Environmental Impact Report (DEIR)
Meadow Walk at Lynnfield
MEPA # 14096

Dear Mr. Bowles:

We have reviewed the Draft Environmental Impact Report (DEIR) for Meadow Walk at Lynnfield, a proposed mixed-use retail, office and residential redevelopment of a portion of the Sheraton Colonial Golf course in Lynnfield and Wakefield. We are encouraged that walking is such a major organizing feature of the development and that the Town of Lynnfield is firmly implementing its design standards for the project.

We are commenting because of the need to continue promoting new ways to encourage pedestrian safety and access in suburban development throughout Massachusetts. In this project, the design details can help in making it pedestrian friendly.

 

Summary of comments:

  •  A change has been made in parking lot design to incorporate landscaped swales. These swales could be used creatively to offer an opportunity for pedestrian walkways through the parking lots. If equipped with walkways, the swales could be integrated into a network of pedestrian ways. New safety measures such as crosswalks and signage should be added.
  •  As proposed, the perimeter road remains a relatively high-speed roadway. Speeds should be mitigated by signage, traffic control measures and traffic calming installations.
  •  Because the residences and the town center are separated by the perimeter road and parking lots, it remains difficult to imagine much walking between these two components of the project. It would be more encouraging for people to walk if the two were located closer together, and were not divided by so much vehicle circulation.
  •  Pervious sidewalks are now a feature of the design of the residential areas. Walkways at the edges of water and marshy areas should also be paved with pervious materials.
  •  The former golfing fairway between the Saugus River, the Lynn Canal and Route 128/95 should be designated as open space with walkways. If signage for the shopping center is needed in this area, it would not substantially detract from this use.
  •  Guiding principles for this project call for the use of traffic calming techniques, traffic controls and signage elements. All should be detailed and mapped in future documents.
  •  Paving materials that are selected and put in place should maximize wide, smooth surfaces where wheelchairs or carriages can be used in comfort.
  •  Retaining an option for additional pedestrian access between site walkways and Walnut Street will make a future walking network more complete.

 

Walking in the parking lots
Town design standards for Meadow Walk at Lynnfield call for large parking lots to be divided into blocks of no more than 200 spaces, with each parking block separated from others by a landscaped area that is a minimum of 10 feet wide. Standards also call for 7 percent of the area of large parking lots to be landscaped. The town design standards do not address the safety of walking in the parking lots.

In following these directives, the proponent has begun to humanize the site’s large parking lots by dividing parking areas into blocks of 200 cars or less divided by long, rhythmically spaced, vegetated biofiltration swales perpendicular to the service drives at the rear of Main Street’s business structures and the perimeter road. The swales are designed as 10-foot wide landscaped, unpaved areas that collect and distribute runoff from the parking areas and filter it through soil and plantings.

From review of diagrams in the report, it appears that the swales, with design modifications and/or widening, could also serve as walkways. Flat walkways on each side of the sloped portion of the swales could be an integral part of the landscaping and provide safer walking through the parking lots. If built of pervious materials, the walkways would help with the biofiltration functions. The walkways would give safe access for walkers who otherwise are forced to wander among vehicles in the midst of the expansive parking areas. The walkways could be part of the 7% of the parking lot area that must be landscaped.

Safe methods for pedestrians to cross the parking lots exist only in a few locations via sidewalks along access streets. Figures 1.4 and 9.2 show the pedestrian network for the project. Based on Figure 9.2, up to 15 parking lot walkways could be assembled along the biofiltration swales and along with the sidewalks accompanying the entrance streets.

Crosswalks, traffic controls/signage and traffic calming
Crosswalks at street crossings within the shopping and residential areas should be identified as part of the pedestrian network for the site. Crosswalks should also be provided at all major access into parking areas, such as the entrances to the Main Street shop groupings. Crosswalks should also be provided at walkways that may be added to the biofiltration swales.

Grade separated crosswalks are cited in responses to our EENF comments (C-003-002), but are not shown in this document. A grade separated crossing for pedestrians within the parking area that connects the Main Street Village Development with the walkway to the Reedy Meadow is cited in responses (C-003-007), but not shown in maps.

Traffic controls throughout the project should be detailed, along with signage that helps direct traffic and make the area safer for pedestrians. Signage should include wayfinding signs and signs relating to the residential areas, as needed.

Traffic calming is hinted at but not fully described. (See Response C-003-009 mentioning a “flush plaza area.” A full explanation of the traffic calming strategies is essential. These should include any raised intersections, narrowed streets, and curb extensions that make street crossings shorter and safer for pedestrians.

The Reedy Meadow/Saugus River/Lynn Canal Walkway
A walkway along the Reedy Meadow is proposed in Figures 1.4 and 9.2, (Pedestrian and Bicycle Circulation Plan), extending along the edge of the Saugus River to the bridge where Route 128/95 crosses the stream. The open space associated with this walkway is shown on Figure 5.1. (Plan Changes Since MEPA Submittal.) All paving done to construct this walkway should be made of pervious paving materials to absorb and filter associated run-off.

Details of the walkway along the Saugus River are shown in Figures 3.4 and 3.5 (Buffer Zone Improvement Plan and Saugus River Buffer Zone Improvement Plan). The Lynn Canal, which transports water from the Saugus River to the City of Lynn, will remain a permanent feature. It should be treated in a sensitive way, similar to the plans for the banks of the Saugus River. A buffer zone along the full length of the Lynn Canal is not included. (Figs 3.5 and 5.1)

The Saugus River buffer area affects about half of the Lynn Canal, lying between the Lynn Canal and Route 128/95 in an area that once was a fairway of the Sheraton Colonial Golf Course. The entire former fairway – perhaps 800 feet long – should be part of the designated on-site open space. This would protect the edges of the Lynn Canal, provide additional space for walking and set a welcoming landscaped area for the on-site shopping area. Even if the land is intended for installation of a large shopping center sign, the open space could remain useful as watershed buffer and as an asset for walkers.

Pedestrian access to Walnut Street
Despite adverse local comment, we continue to think that the option for additional pedestrian access between the site and Walnut Street should be retained. With increasing numbers of walkers, future walking possibilities and the need for such connections cannot now be foreseen. Without this access, pedestrians arriving via Walnut Street must enter near the Rte 128 ramps, a location with heavy traffic volumes.

Connecting the residences and shopping components
The on-site luxury housing (180 units) and the LIFE component (40 units) are wholly separated from retail/office uses by the perimeter roadway. The layout is not designed to maximize walking from the residential buildings into the mall. Walking from the LIFE component will be a primary mode of getting to the shops other than driving, as the shuttle bus does not appear to provide this service. Two crosswalks of the perimeter road are indicated between the residences and the main town center buildings. These crosswalks are located at the luxury apartments. We remain concerned that the crossings are located on the relatively high speed perimeter. Raised crosswalks at these locations have been cited but not shown. (See Response C-003-011.)

Thank you for the opportunity to comment on this document. Please feel free to contact us for clarification or additional comments.

Sincerely,

Wendy Landman
Executive Director

Robert Sloane
Senior Planner

Westwood Station Comment Letter

Westwood Station Comment Letter

October 24, 2007

Secretary Ian Bowles
Executive Office of Energy and Environmental Affairs
MEPA Office
100 Cambridge Street, Suite 900
Boston, MA 02114

RE: Comments on the Final Environmental Impact Statement for Westwood Station,
University Avenue, Westwood, MA
EOEA # 13826

Dear Secretary Bowles:

WalkBoston appreciates the opportunity to comment on the FEIR for Westwood Station. We are commenting because of concern about the pedestrian connections to this site. We are especially interested in commenting on the progress made since the DEIR in incorporating pedestrian facilities and concerns into the proposal.

As the FEIR points out, the existence of superb access to both local and intercity rail service makes the site a great opportunity for a mixed-use transit-dependent community. In this community, pedestrian facilities will be of the utmost importance to create a significant town center for new and existing residents of the region.

The scale of the proposed development is so large that there are challenges to making it safe and convenient for pedestrians. The total development program for Westwood Station is approximately 5 million square feet:
• 1,348,000 square feet of retail and restaurant space located from the MBTA station through the large commercial area south of Rosemont Road. This includes five or six multi-story buildings with ground-floor retail, with smaller scale retail between the larger stores and parking garages on the surrounding streets. The development encompasses more retail square footage than the South Bay Plaza in South Boston, Natick Collection (formerly Natick Mall), North Shore Plaza and Liberty Tree Mall in Danvers, South Shore Plaza in Braintree, or Burlington Mall.
• 1,295,000 square feet of residential uses (1000 housing units)
• 328 hotel rooms
• 1,490,000 square feet of office space
•11,985 parking spaces – 600 for residences, 3676 for offices, 7709 for central commercial

Summary Observations

  • The site is isolated from its surroundings and principal access will be via car, with a small proportion by train. Access to abutting neighborhoods is not improved by the project.
  • The real main street of the project is Westwood Station Boulevard because vehicular access to and within the site is principally by car.
  • The development has three distinct districts each representing different opportunities for pedestrian activity and safety. We have examined several of the indicators of walkability for the project as a whole and for the three areas individually.
    – The north end of the project – the area between the MBTA Route 128 Station and Rosemont Road, east of Westwood Station Boulevard – is a mixed use shopping/housing/ hotel/office district that includes virtually all of the proposed housing units, two office structures, two hotels, street-level shops, and most of the usable public open space (the Common, the Promenade and the Meadow.) This is the most pedestrian-friendly district.
    – The south end of the project – between Rosemont Road and Harvard Street, east of Westwood Station Boulevard – is a more traditional “big box” mall, with large sites for retail establishments, separated by parking areas and garages. There are a fair number of small street-level retail units along Market Street, the central pedestrian way.
    – The west side of the project between Westwood Station Boulevard and the adjacent residential area – is an area of office buildings backed by landscaped buffering space between the development and the adjacent community.
    – Both the south and west districts could be improved gradually in keeping with the observed market for mixed-use development and on-site pedestrian needs.
  •  From a large scale transportation perspective, it would be desirable to have the dense office uses near the station, and not west of Westwood Station Boulevard where they are not within easy walking distance of the station. For example, if the garages adjacent to the hotels had office use above them (or parking below grade), the office use would in fact be transit and pedestrian friendly. The currently planned location for significant office use will generate a great deal of traffic for a use that could be served by transit and contribute to the pedestrian life of the Market Street area.
  • Sidewalks should be provided along all streets. Design standards for all pedestrian facilities should be clearly articulated.
  • Recreational walking facilities should be expanded and made into a system useable for jogging, strolling and biking.
  • Walking facilities should be used to increase transit use to reduce vehicular traffic.

Walkability analysis

1. Access to and through the site

  •  Only a small proportion of the daily traffic into the project area is anticipated to be on foot (excluding drivers accessing a building on foot after parking). Most of the walkers will be coming from public transit connections or the MBTA station at the north end of the project. Few walkers are anticipated from abutting neighborhoods.
  •  Westwood Station Boulevard is the real main street of the project. It is the principal connection to local streets and the expressway network, and will carry the lion’s share of vehicular traffic. The large-scale uses in the project – the big box stores and the office buildings – front on the boulevard, while the smaller retail stores front primarily on Market Street. The boulevard design capacity encourages traffic to use it for access throughout the site.
  • The design emphasis on Westwood Station Boulevard may afford a bypass of the north end of the project with its shops and attractive pedestrian environment. The five street access points from the boulevard into the project encourage drivers to use the boulevard as the major spine of the site, with Market Street being only the first of several access streets.

2. Pedestrian amenities

  • Throughout the project the proponent has worked toward a pedestrian scale design, with shorter blocks, narrow streets, pedestrian-oriented buildings and street furniture. Because of the design of each district, the results vary in terms of pedestrian safety and the encouragement of walking.
  • At the north end of the project land uses are integrated in an intentional mix to create a vibrant and interesting area for pedestrians who are residents or visitors. Residents, employees and visitors can walk to transit, local shops, restaurants and nearby offices. Connections are easy to make, because of the relatively short distances (1500 feet or less). More pedestrians might be attracted by a civic use of some kind such as a branch library with meeting rooms.
  •  At the south end of the project, only retail uses are included. There is a significant orientation toward open parking lots facing Westwood Station Boulevard – a traditional big box zone. An attempt has been made to bring pedestrians into the district where it abuts the shopping/housing/hotel/office area by providing a two-sided row of relatively small-scale retail uses along Market Street.
  • At the southernmost end of the project site, the big box layout is most pronounced, with a grouping of three big box retail outlets arranged around a parking area abutting the intersection of Westwood Station Boulevard and Harvard Street. Market Street connects with this area but turns into a roadway for parking access in front of the big box stores. In general, this will not be a pedestrian-friendly area; people who drive here to shop will likely be strolling through parking areas rather than along the central avenue.
  •  The western portion of the project is a single use office area with large garages and no real provision of pedestrian scale environments.
  •  Traditional pedestrian amenities such as street furniture (e.g., benches, pedestrianoriented street lights, public washrooms, etc.) should be included where possible and not only in areas where pedestrian traffic is expected to congregate. Along all transit routes, the proponent should consider covered waiting areas for passenger pick-up, with shade from hot sun and protection from rain.

3. Pedestrian network connectivity (how well sidewalks and paths are connected, and how directly pedestrians can travel to destinations).

  • The overall project layout features a grid of streets and sidewalks with frequent cross streets, making access on foot reasonable. The only dead end streets are lead directly to destinations – the train station and the Common. Widths of streets throughout the project are principally 1-lane in each direction, except for Westwood Station Boulevard which has 2-lanes in each direction with additional lanes for turning movements.
  • The east-west pedestrian connections have been designed to aid in crossing Westwood Station Boulevard. These connections should be well marked and signed and include signals with pedestrian phases.
  •  The Common and the Promenade have been introduced as a connected set of civic spaces. These will serve the best mix of uses in the project: offices, small retail stores, and upper floor residences all within short distances of one another.

4. Design standards for sidewalks, street crossings, paths

  •  The overall project features sidewalks along both sides of the street. However, design standards for both streets and sidewalks reflect a high-volume automobile orientation. On all streets except Westwood Station Boulevard, turning radii are much too expansive given the intent to serve slow-moving traffic. Turning radii that are too large encourage higher speeds, add to pedestrian crossing distances, remove waiting areas of sidewalk and interfere with safe pedestrian crossings.
  • The project should include universal design features (transportation systems that accommodate special needs, including people using wheelchairs, walkers, strollers and hand carts).
  • Where possible, sidewalks might be partially covered – perhaps awnings along the fronts of retail spaces – for protection of walkers during inclement weather.
  • North End – sidewalks appear to be wider here than elsewhere in the project, according to the “Proposed Internal Roadway System” map. This suggests that pedestrian traffic is anticipated to be higher here than elsewhere. Wide sidewalks also allow more space for pedestrian amenities (seats, lighting, etc.) and landscaping.
  • South End – it would be useful to see the design details for sidewalks in this area. From the “Proposed Internal Roadway System” map, it is unclear if the design includes wide sidewalks and favors pedestrian movement and safety.
  • West Side – The bicycle-pedestrian path on the west side of Westwood Village Boulevard is set back from the street. On the east side of the boulevard, sidewalks are narrow and directly abut the automobile lanes. A divider between the street edge and the sidewalk would be desirable here, both to encourage walking and to make it safer.

5. Walking Safety

  • The overall project makes few distinctions between categories of traffic allowed on proposed streets. For example, the proponent should designate truck routes (Westwood Station Boulevard and University Avenue appear to serve the major truck needs). Truck traffic should be discouraged from Market Street and other local thoroughfares – anywhere extensive pedestrian traffic is anticipated.
  • Proposed intersection traffic controls and their effects on pedestrian movement should be indicated. Signals located on site roadway intersections should include pedestrian phases and countdown signals to indicate how many seconds are left in the walk phase. Traffic controls might be needed for mid-block pedestrian crossings.
  • Traffic calming would help protect pedestrians. Mention has been made of raised intersections to slow traffic. Speed limit signs should be placed throughout the development, and where possible, should be set for low speeds. Streetscape improvements such as lighting, an extensive tree canopy and on-street parking can also make a street more conducive to walking and lead to slower-moving cars.

6. Recreational walking

  • While the project includes sidewalks and recreational paths leading into adjacent open space, a network of paths is not created. The proposal for a walking/jogging/biking trail along Westwood Station Boulevard could be part of a larger jogging/strolling trail connected via Harvard Street or Canton Street to University Avenue. This would make a large loop (a mile or more) for residents and on-site employees.
    • A trail connection is proposed by the Department of Conservation and Recreation between the Route 128 Railway Station and Royall Street in Canton, which leads to the Blue Hills Reservation. Construction drawings of the trail will be prepared by the 5 proponent, with construction to await final design and construction of the I95/I93/128 interchange. An endowment to operate the trail would be extremely beneficial.
  • A canoe access site to the Neponset River is near the southern end of Westwood Station. There appears to be limited access to the site on foot. Perhaps there can be an extension of on-site trails into this area.
  • Paths alone cannot provide the level of exercise provided by outdoor playing facilities. The nearest recreation and sports facilities are nearly a mile away at K-5 Downey School, where there is a baseball diamond, tennis courts and a soccer field. On-site, the principal recreation facilities are paths at the Meadow and a dog-walking reservation. Adding a path network and recreation facilities would be helpful and would encourage walking and physical activity.
  • Sites west of Westwood Station Boulevard may offer some opportunities for additional recreation – space for a ball diamond, courts for tennis, basketball, public gardens, paths for strolling or nature walks, or a jogging track. This space could serve both the residential community and adjacent office employees.
  • Additional recreation facilities could be located at the Meadow if they did not interfere with the protective area around the wellhead.
  • A playground could be added in the Meadow, the Common or the Promenade for shoppers’ children or for families with children living in nearby housing units.

7. Public transit

  •  Pedestrian access between the development and the MBTA station must be encouraged. However, given the size of the project, especially its great north-south length, internal transit will be needed to encourage arriving at the site via longer-distance transit and then walking around portions of the site. For shopping, the large stores at the southern end of the development are almost too distant for significant pedestrian traffic from the residential/retail/office/hotel areas. The farthest stores are more than 3,000 feet from the MBTA station – a 20 minute walk and a distance that may be unattractive for shoppers on foot. The proponent has indicated that it will provide a shuttle bus service, equipment and a maintenance facility. A commitment to operation of shuttle bus services on a permanent basis would be appropriate.
  • The proponent suggests shuttle bus service with shelters that display real time bus arrival times and support safe and efficient use of non-automobile transportation. This would be a welcome level of transit information.
  • Bus stops should be provided on all routes, signed to preserve space for the vehicles to pick up passengers at shelters.

8. Sidewalk connections

  • The proponent has committed to building sidewalks on both sides of all streets to be built or reconstructed. This should include the portions of the existing University Avenue that abut properties to the east that are not included in the proposed development site.
  • It would be useful to know the proposed dimensions of the sidewalks, and documentation should include proposed cross-sections and landscape and lighting design of all streets, sidewalks and rights-of-way.
  • Pedestrian facilities are largely self-contained within the project site. There are few nearby residences within walking distance and the design seems to assume that access from nearby neighborhoods will occur only by auto. At a minimum, sidewalks should allow pedestrians to walk into the project along the Blue Hill Drive entrance. Other connections into the abutting neighborhood would be desirable.
  • Pedestrian access directly to the canopied platform of the MBTA railroad station is essential. Details of the proposed connection and the effects that the reconstruction of Greenlodge Street should be provided.
  • Preferential parking for carpools, vanpools and Zipcars should be provided in locations convenient for users, who are likely to be carless residents or employees. Signs on sidewalks should indicate where the vehicles are located.

9. Encouraging pedestrians

  •  The proponent should institute an active walking encouragement program. This could include maps of the site that are made available at many locations. It could also include transportation access guides to give concise information for accessing a destination by walking, cycling and public transit, and facilities and services for people with special mobility needs.
  • One of the real tests of pedestrian-friendly design of a residential proposal could be “Can you live here without a car?” Does the area provide for all resident needs, such as shopping for groceries, access to school, work, and recreation? Does the site provide sufficient access to transportation, whether train, shuttle bus, Zipcar, taxi, sidewalk or path? Are there supportive transportation management aids such as the guaranteed ride home that make movement efficient at all hours?

10. Toward full build out

  • Phase I of the development is scheduled to include all of the retail uses, half of the residential units, the hotels and one office building.
  • North end. Build out of this area will be almost complete at the end of Phase I. The exception will be the Meadow residential units that await Phase II. It will be critical that essential retail establishments are present to serve the 500 residential units on-site.
  • South end. Build out of this area seems more difficult. The big box stores at the southernmost end of the site may be readily built, but the midsection of the area is less well defined. This area, with its small stores fronting Market Street, could be the experimental portion of the development, evolving in accord with feedback from the fully built-out residential/office/hotel community in the north end of the project. If the market holds, it might be possible to incorporate residences above the retail units along Market Street, or office uses that are planned west of Westwood Station Boulevard. This might aid in removing issues caused by siting residential structures that negatively affect the well field at the Meadow.

Thank you for the opportunity to comment on this document. Please feel free to contact us for clarification or additional comments.

Sincerely,

Robert Sloane
Senior Planner