Tag: MassDOT

Unchoked: Dual Paths included in MassDOT’s plans for massive Allston I90 Project!

Unchoked: Dual Paths included in MassDOT’s plans for massive Allston I90 Project!

“Unchoke the Throat!” – the rallying cry to improve the Charles River park and river edge in the I-90 Allston Interchange project – grew out of WalkBoston’s call for separate paths for people walking and biking along the river within a landscaped park. Joined by the Charles River Conservancy and community residents, the idea came to life when Sasaki produced drawings showing a vision of how it could be done. WalkBoston produced a video showing how the massive highway project could be an opportunity to create a better place for people running, biking, and walking along the Charles River.

People from around the region wrote letters to MassDOT expressing their support for dual paths and a better park in the Throat. Of the 500 letters MassDOT received during the FEIR public comment period, over 150 referenced our “#UnchokeTheThroat” video proposal.

MassDOT listened! The notion of dual paths, nonexistent in most of the planning prior to #UnchokeTheThroat, is now in nearly every paragraph of Transportation Secretary Pollack’s explanation of her January 10th decision to pursue a new concept for the Throat (see today’s Boston Globe Mass. Pike in Allston, Soldiers Field Road are set for a major overhaul”).

The chosen plan makes dual paths and a wider park possible with an at-grade Turnpike and placement of Soldiers Field Road on a new, smaller viaduct above the Turnpike. A more generous, straightened park is also included as part of the plan that extends commuter rail to Cambridge via the Grand Junction line across the Charles River. Each of these improvements will help to reduce noise and visual intrusions into the riverside park.

What’s next?

WalkBoston’s advocacy is not done! We have tracked this project since its beginning in 2014, and we will continue our efforts to make it better.

Our focus, along with other advocates and community partners, is to convince MassDOT of the need to prepare for the traffic disruption during construction by enhancing transit access to and from the west and protecting Allston and Brookline neighborhoods from cut through traffic. Maximizing express bus and commuter rail services in the corridor served by the Turnpike and the Framingham/Worcester Commuter Rail Line will be critical. New service should include West Station to enhance public transportation options that provide additional capacity when vehicle lanes on the Turnpike are removed from service during the years of construction. Local bus connections are needed to provide a web of services that get commuters to final destinations; the stations further out, too, will need to be considered, as they will likely see an influx of new riders hoping to avoid driving delays in the construction area. Pedestrian connections to all new or supplemented services are essential.

Work on the project – some call it “the biggest highway project since the Big Dig” – goes on. It is, of course, much more than a highway project. It is a major development with public transportation components that lead outward from West Station, with repercussions that stretch all the way to Worcester – encompassing the Western Corridor and the major employment centers of Harvard Square, the Longwood Medical Area, Kendall Square, Back Bay and Downtown. Boston will gain a whole new neighborhood that will add over 10 million square feet of new employment and residential buildings that will make the area another of the region’s most important destinations over the next few decades.

The Allston I-90 Project is a once in a generation project that Massachusetts needs to get right. It is our move to call attention to everyday issues that can be improved to make it safer and easier to get around now and in the future.

Comments on Morton Intersection Improvements, Project: 608755

Comments on Morton Intersection Improvements, Project: 608755

Patricia Leavenworth, P.E., Chief Engineer
MassDOT-Highway Division
10 Park Plaza Boston, MA 02116-3973

Attn: Roadway Project Management – Room 6340

Re: Morton Intersection Improvements Project: 608755

December 21, 2018

Dear Ms. Leavenworth:

We are submitting comments in regards to Intersection Improvements at three intersections along Morton Street after seeing the plans at a public meeting on December 19, 2018.

First, we ask the Department to please extend the 10-day public comment period given that the meeting was held just before the Christmas holiday and it may be hard for residents to get feedback in on time. We are pleased to see MassDOT undertaking this project and look forward to continuing to work with you on implementation of safety improvements to the corridor.

Overall, we feel the project will improve safety for drivers, but will do little to improve the safety or convenience for pedestrians or cyclists. In this area, pedestrian safety needs to be prioritized in the design utilizing Complete Streets guidelines. We also ask that these spot improvements are the beginning and not the end of a process to improve the entire stretch of Morton St and create connections from Mattapan to Franklin Park and walking/biking paths in Jamaica Plain, especially as this stretch is identified in Go Boston 2030 for connecting the Southwest Corridor to the Blue Hills Reservation. In addition, we are advocating for the following adjustments and additions the plans presented on December 19:

  • Increased traffic calming on Morton Street
    The high speeds on Morton Street make the street unsafe for drivers, cyclists and pedestrians. We applaud that the design calls for narrower travel lanes but additional measures need to be taken to slow speeds. Possible solutions might be raised intersections, additional STOP signs and/or traffic signals.
  • Create a safe pedestrian crossing between Morton/Blue Hill Ave and Morton/Harvard
    There is no crosswalk in the 1000-foot stretch between Blue Hill Ave and Harvard Street. This is a dense residential neighborhood and the lack of a safe crossing here is a major community concern. The crossing could either be at Courtland/Havelock/Morton or Wellington Hill/Morton depending on the neighborhood’s preference.The lack of a crosswalk contributes to the highway feel of Morton Street and hence the high speeds and extremely high crash clusters over the past four years. Any crosswalk should include a HAWK beacon for improved notice and safety of pedestrians crossing the street.
  • Design a traffic signal system which enables pedestrians to easily and safely cross Blue Hill Ave
    People wishing to cross Blue Hill Ave must now push a button to wait for a WALK signal. Once the intersection is redesigned they will still have to push a button to cross the street. We strongly request traffic signals that “rest in WALK”.
    Push buttons result in very long waits for walkers. Depending upon when a walker pushes the button in the traffic cycle he/she may wait for over two minutes to get a walk signal. Furthermore, pedestrians must be able to cross the six lanes of Blue Hill Ave in one cycle. Neither MassDOT staff nor their consultants could guarantee that walkers would be able to cross in one cycle.
  • The bike boxes at the Blue Hill Ave and Morton St intersection are an important safety measure however the placement of one in the Southeast corner of the intersection could pose a dangerous conflict with right turning cars. We would like to look more closely at the designs to assess this. An additional left-turning bike box is needed at the northeast corner in so that cyclists can safely turn left off of blue Hill onto Morton St towards Jamaica Plain.
  • We support the overwhelming response from residents who advocated to keep the bus stop where it currently is on Blue Hill Ave.
  • We applaud the design’s tightening of curb radii at Blue Hill/Morton and if floating bus stops are in a location supported by community members, we would support them and the addition of bike facilities at the intersection. It appeared that at least some people at the public meeting had never seen or experienced floating bus stops and more education is needed about how they work when proposing them. We understand that parking will not be permitted within 20 feet of the intersections but we also heard that there are many violations of this regulation. We recommend that additional curb extensions, either concrete or flexposts, be added to the design.

Sincerely,
Dorothea Hass, WalkBoston
Eliza Parad, Boston Cyclists Union
Galen Mook, Massachusetts Bicycle Coalition
Tony Lechuga, LivableStreets Alliance

WalkBoston comments on Craigie Dam/Bridge Design Alternatives

WalkBoston comments on Craigie Dam/Bridge Design Alternatives

Date: January 2, 2019

To: Secretary Stephanie Pollack, Administrator Jonathan Gulliver, Andy Paul, Jackie Douglas,
James Kersten, MassDOT, Commissioner Leo Roy, Jeff Parenti, Dan Driscoll, DCR

Re: WalkBoston comments on Craigie Dam/Bridge Design Alternatives

We are relieved that MassDOT and DCR are committed to acting to improve the safety of people walking and biking on this critical roadway segment.

We have reviewed the options that were presented to the community on December 18th and have several comments that are detailed below. However, we do not think that the relatively modest improvements that are planned for Spring 2019 are adequate to providing truly safe walking and biking conditions, and we urge MassDOT and DCR to develop more significant plans for safety for the Charles River bridges.

One approach that WalkBoston would like to see explored is the adoption of a pilot 20 MPH speed limit on all the Charles River Bridges from Harvard Square to the Craigie Dam/Bridge that would test an automated speed enforcement protocol. Over the last month we have attended meetings regarding safety and operations for the BU Bridge, the Longfellow Bridge and the Craigie Dam/Bridge. In each case, the completely fixed and limited right-of-way does not allow for the provision of protected bike accommodations within the roadway right-of-way without reducing the number of vehicle lanes. WalkBoston was distressed to hear suggestions by community members at one of these meetings to dedicate one of the sidewalks to bicycles rather than pedestrians in order to free up roadway space for vehicles (a suggestion that we were pleased was simply given, but then not taken up or discussed by any of the state or municipal staff).

MassDOT has already expressed its interest in adding automated enforcement to the state’s safety tools and we urge MassDOT to vigorously support a pilot program for the bridges. Setting and then enforcing a 20 MPH speed limit on all the bridges would significantly increase the safety of bicyclists using on-street bicycle lanes while at the same time allowing the number of vehicle lanes to remain as they are today.

Comments on Design Options A and B

Craigie Dam/Storrow Drive Intersection

Take the following steps to minimize conflicts between people walking, biking and driving:

  • For turns from Craigie into Storrow Drive put in place (and enforce) a permanent No Right on Red regulation and include the permanently illuminated NRTOR sign
  • Set the vehicle for Craigie Dam traffic approaching Leverett Circle stop line back from the intersection (with Don’t Block the Box markings and enforcement) to allow bikes to queue in a bike box ahead of traffic
  • Provide marked bike lanes from Craigie to Martha Way through Leverett Circle
  • Tighten the turning radius of the corner from Craigie onto Storrow Drive and provide a bike ramp to the Paul Dudley White Path at the corner rather than having bikes get on the sidewalk before reaching the intersection. The very tight sidewalk space should be reserved for pedestrians.

Museum of Science Driveway and Museum Way/Craigie Intersection

  • Add crosswalk striping across the Museum of Science driveway.
  • Narrow the driveway to the greatest extent possible given the truck and bus movements needed for Museum of Science operations.
  • Consider signalizing the driveway entrance to the Museum of Science in coordination with the Museum Way signal.
  • Eliminate the conflicting left turn arrow across the WALK signal at the Museum Way crosswalk across Craigie.
  • Improve the street lighting of the crosswalk across Craigie at Museum Way

Craigie/Land Boulevard/Gilmore Bridge Intersection

Configure the signal timing at the Land Blvd/Craigie/Gilmore Bridge intersection to allow safe pedestrian and bike movements. A detailed description is provided below of the maneuver needed to ride a bike safely through the intersection under current conditions. This is in urgent need of improvement.

  • “At the intersection with Edwin H Land Blvd/ Gilmore Bridge, to feel safe as a bicyclist I will often violate traffic signals. The problem is that, whether traveling either inbound or outbound, if you wait for the light to change, traffic builds up next to you. When the light turns green, you are forced into the middle of a pack of fast-moving traffic, with cars and trucks rapidly accelerating and changing lanes.

    The situation is particularly dangerous when traveling outbound and making a left on Cambridge Street (a route most bicyclists take, as Route 28 gets faster and more dangerous beyond the Cambridge St. intersection). As a bicyclist, if you leave the Gilmore intersection with vehicle traffic, you then have to work your way across 2 lanes of fast-moving traffic to get into your left turn, and then must hold your ground in the middle of four lanes of outbound traffic in order to end up on the right-hand side of the two lane Cambridge St. turnoff. You can also hug the left-hand side of the road by the median strip, but traveling on the left side of the road can be dangerous too.

    I have found navigating the Science Bridge is actually safer when breaking the traffic signals. For example, when traveling outbound, if I hit the red light at the Gilmore intersection, there is a break in the signal when I usually run the red light on my bike. The break occurs between the green light for vehicles coming from Charlestown towards Cambridge, and the following green light for traffic moving inbound on 28. Taking the light this way has dangers too – at least one or two vehicles coming from Charlestown almost always speed through their red light (committing their own traffic violation), and you need to be absolutely sure those vehicles have stopped. Nevertheless, this method still allows me to make my way over to the Cambridge St turnoff without needing to cut across vehicle traffic, and feels much safer to me.”

Cc:
State Senator Joe Boncore
State Senator Sal DiDomenico
State Representative Jay Livingstone
State Representative Mike Connolly
Joe Barr, Cara Seiderman, Cambridge
Chris Osgood, Vineet Gupta, Charlotte Fleetwood, Boston
Becca Wolfson, Eliza Parad, Cyclists Union
Stacy Thompson, Steve Miller, LivableStreets Alliance
Galen Mook, Tom Francis, MassBike
Nate Fillmore, Cambridge Bike Safety

Patch – “Activists Call For Protected Bike Lane On Canal Bridge”

Patch – “Activists Call For Protected Bike Lane On Canal Bridge”

Patch: “Activists Call For Protected Bike Lane On Canal Bridge

“This isn’t a new issue to MassDOT and DCR. Transportation advocates have been discussing safe bike facilities on the Craigie Dam and Longfellow Bridge with state agencies since at least 2009,” said Wendy Landman, executive director of WalkBoston also in a statement. “Not only is this the right action to take for the safety of people biking, it is also the right action for the safety of people walking because it means that bicyclists do not ride on the sidewalk.”

Posted December 19, 2018

Event: MassDOT Design Public Hearing – Cypher Street Improvements, 11/13, 6:30pm

Event: MassDOT Design Public Hearing – Cypher Street Improvements, 11/13, 6:30pm

Cypher Street

We led a walk two years ago in November 2016 from near the Broadway T Station (meeting at Dorchester Ave & W 2nd Street) that walked toward the Fort Point area. The route went by the proposed GE Headquarters site and highlighted gaps in the pedestrian network at Cypher Street that neighbors in the area have been trying to shine a light on. One of our guest speakers on the walk described a project that would include improvements for Cypher Street that was proceeding toward 25% design.

There is now a public hearing scheduled to take place at the Condon School on November 13 at 6:30pm:

“The proposed work includes new sidewalks and pavement, street lighting, traffic signal systems, improved drainage, accessibility ramps and crosswalks, separated bike lanes, new pavement markings, signing and landscaping in accordance with current state and federal standards.”

Corner of Haul Road & Cypher Street

The full announcement from MassDOT can be found below. We encourage you to go and speak up for safe walking!


The Commonwealth of Massachusetts – Department of Transportation Highway Division – Notice of Public Hearing

Project File No. 608807
(search for this number on MassDOT project tracking system)

A Design Public Hearing will be held by MassDOT to discuss the new Cypher Street Improvements, including Richards Street, E Street and Fargo Street in the Seaport District of Boston, MA.

WHERE:

Condon School, 200 D Street, Boston, MA 02127

WHEN:

Tuesday, November 13, 2018 at 6:30 PM

PURPOSE:

The purpose of this hearing is to provide the public with the opportunity to become fully acquainted with the proposed improvements to the streets listed above. All views and comments made at the hearing will be reviewed and considered to the maximum extent possible.

PROPOSAL:

The project will include improvements for truck access to Massport’s Conley Terminal, and expand/improve multi-modal transportation connections through the corridor. The proposed work includes new sidewalks and pavement, street lighting, traffic signal systems, improved drainage, accessibility ramps and crosswalks, separated bike lanes, new pavement markings, signing and landscaping in accordance with current state and federal standards.

A secure right-of-way is necessary for this project. Acquisitions in fee and permanent or temporary easements may be required. MassDOT is responsible for acquiring all needed rights in private or public lands. MassDOT’s policy concerning land acquisitions will be discussed at this hearing.

Written views received by MassDOT subsequent to the date of this notice and up to five (5) days prior to the date of the hearing shall be displayed for public inspection and copying at the time and date listed above. Plans will be on display one-half hour before the hearing begins, with an engineer in attendance to answer questions regarding this project. A project handout will be made available on the MassDOT website listed below.

Written statements and other exhibits in place of, or in addition to, oral statements made at the Public Hearing regarding the proposed undertaking are to be submitted to Patricia A. Leavenworth, P.E., Chief Engineer, MassDOT, 10 Park Plaza, Boston, MA 02116, Attention: Roadway Project Management, Project File No. 608807. Such submissions will also be accepted at the hearing. Mailed statements and exhibits intended for inclusion in the public hearing transcript must be postmarked within ten (10) business days of this Public Hearing.

Project inquiries may be emailed to dot.feedback.highway@state.ma.us

This location is accessible to people with disabilities. MassDOT provides reasonable accommodations and/or language assistance free of charge upon request (including but not limited to interpreters in American Sign Language and languages other than English, open or closed captioning for videos, assistive listening devices and alternate material formats, such as audio tapes, Braille and large print), as available.  For accommodation or language assistance, please contact MassDOT’s Chief Diversity and Civil Rights Officer by phone (857-368-8580), fax (857-368-0602), TTD/TTY (857-368-0603) or by email (MassDOT.CivilRights@dot.state.ma.us).

Requests should be made as soon as possible prior to the meeting, and for more difficult to arrange services including sign-language, CART or language translation or interpretation, requests should be made at least ten (10) business days before the meeting.

In case of inclement weather, hearing cancellation announcements will be posted on the internet at
http://www.massdot.state.ma.us/Highway/
JONATHAN GULLIVER PATRICIA A. LEAVENWORTH, P.E.
HIGHWAY ADMINISTRATOR CHIEF ENGINEER