Tag: bike lanes

Beacon Street Multimodal Improvements Comment Letter-Somerville, MA

Beacon Street Multimodal Improvements Comment Letter-Somerville, MA

May 13, 2014

Richard K. Sullivan, Jr.
Executive Office of Energy and Environmental Affairs
Attn: Alex Strysky
100 Cambridge St., Suite 900
Boston MA 02114

Mark Kolonoski
MassDOT Highway Division
Environmental Services Section
10 Park Plaza, Room 4260
Boston, MA 02116

RE: Comments on the Environmental Notification Form for the Beacon Street Multimodal Improvements and Streetscape Enhancement in Somerville, MA

Dear Secretary Sullivan and Mr. Kolonoski:

The Beacon Street project area extends from the bridge abutment at Oxford Street to Dickinson Street, a distance of approximately 1.1 miles. The project is intended to enhance pedestrian and bicycle movements with improved streetscape, wider sidewalks, a new cycle track/bicycle lanes, and new ADA compliant curb ramps. The project goal is to enhance the multimodal connectivity of the Beacon Street Corridor.

We have reviewed this project and offer the following comments:

1. Updated and continuous sidewalks on Beacon Street
The program for complete streets along Beacon Street will result in new cycle tracks and a significant reconstruction of both the street and the sidewalk. Sidewalks are to be updated and rebuilt to correct current deficiencies, including substandard slopes and lack of ramps at intersections. A sidewalk will be added to the south side of Beacon Street in a location where no sidewalk now exists. Adherence to this plan is essential for the safety and convenience of all users of the sidewalk.

The proposed sidewalks will replace the existing 10’-11’ wide sidewalks with new ones of substantially the same width. Retention of this dimension as a minimum is extremely important because some space within the sidewalk will accommodate other uses, such as trees. In only one portion of Beacon Street, where there are space constraints due to an existing stonewall, will the 10’-11’ width be precluded; we note
that no trees are planned for the sidewalk in this section.

2. Cycle tracks and bike lanes
Cycle tracks are proposed between Oxford Street and Museum Street, bike lanes between Museum Street and Park/Scott Streets, cycle tracks between Park/Scott Streets and Washington Street and bike lanes between Washington Street and the Cambridge City line. On the north side of the street, the alignments of the cycle tracks and bike lanes are end-to-end, resulting in a virtually straight path for the full length of
the project.

On the south side of the street the cycle tracks and bike lanes do not quite line up. The transitions between cycle tracks and bike lanes at the intersection of Beacon Street/Museum Street and Park Street/Washington Street are angled to accommodate the needed connections between cycle tracks and bike lanes. These intersections have crosswalks where pedestrians will cross near the bike routes. Since separate traffic signals for bicycles are not included in the project, WalkBoston is concerned that walkers may not be aware that bicycles are approaching at these intersections and need to be especially careful because these diversions might distract the cyclists or the
motorists. We request that special signage and/or pavement markings be provided to alert walkers, bicyclists and drivers of these shifts in alignment and the need to be aware of movements by others.

3. Separation of cycle tracks and sidewalks
In several locations, the proposed cycle tracks are immediately adjacent and at the same grade as the sidewalk. In effect the cycle track will be located on an extension of the sidewalk. A pronounced and clear separation between bicyclists and walkers is needed to deter cyclists from using the sidewalk to bypass slower moving bikes. The
starting and stopping of cycle tracks and bike lanes may be confusing and lead to cyclists using the sidewalks to avoid merging into traffic or worrying about people opening car doors directly in front of them.

Since all 208 of the street trees included this project are to be planted within the width of the sidewalk, we assume that they will help to separate the cycle track from walkers. Other street furniture such as the existing utility and lighting poles, or new benches, trash containers, bollards or signs might also help. The precise location of each element should be carefully considered, as they have the potential to interfere with pedestrian or bicycle movements.

4. Placement of trees
Although the sidewalks are 10 feet wide in nearly all locations along Beacon Street, some of that width – perhaps up to 5 feet – will be lost due to the planting of 208 trees directly in the sidewalk. All of the proposed new trees should be placed in long narrow tree pits (we have seen tree pits that are 2’ wide by 6’-8’ long). More typical 4-foot square tree pits that intrude into the sidewalk should not be used. Irrespective of the shape of the tree pit, tree grates and or special permeable but sturdy filler (similar to that used in some South End locations) should be explored. This is important for the safety of walkers, as is the long-term maintenance of the tree pits so that they do not pose tripping hazards for walkers or for the visually-impaired.

5. Traffic signals at crosswalks and mid-block
New traffic signal equipment and signal timing at the intersections of Beacon Street with Park/Scott and Washington Streets are planned. In addition, two High-Intensity Activated crossWalK (HAWK) pedestrian signals on mast arms are planned for pedestrian crossings at the Sacramento Street intersection and at the Buckingham/Cooney intersection. The project thus appears to have signals of some sort at intervals of about ¼ mile; however, in the portion of Beacon Street between Sacramento Street and the rail overpass at Somerville Avenue, the intersections with Oxford and Prentiss Streets have no traffic signals. With no signals to slow traffic these mid-block crossings may be difficult for pedestrians. Signage or other warnings may be essential to inform drivers and cyclists of the crosswalks.

6. Crosswalk paving
The proposed use of concrete pavers at crosswalks has been cited by one of our members as a hazard for nearly all walkers, and we agree. For all crosswalks on Beacon Street, the customary white reflective thermoplastic strips should be used. Pavers have low visibility and are uneven, making it harder for wheelchairs, seniors, and people pushing strollers or grocery carts.

7. Pedestrian signal phasing
At existing signal locations the exclusive pedestrian phase will be replaced with concurrent pedestrian phasing. For all new signals, a leading pedestrian interval (LPI) is proposed to allow pedestrians to enter the crosswalk before vehicles approaching the intersection have a green signal indication. It will be important to coordinate the LPI at each signalized intersection with any preferential treatment given to bicycles at the same location, to avoid potential conflicts.

8. Signage
There is a need for sidewalk and cycle track signs that make it clear to walkers, bicyclists and drivers how the cycle tracks function. In particular, since all the street’s users will be unfamiliar with cycle tracks it will be important to let pedestrians know what to expect in bicycle movements adjacent to them. Signs should advise bicycles to stay within the cycle tracks and avoid using the sidewalks. Signs should advise walkers of approaching bicycle traffic,places to wait before crossing the street, and to not walk in the cycle tracks. Specific notice should be given to cyclists and pedestrians of potential conflicts at intersections, where turning bicycles, vehicles and pedestrians present many different movements.

9. Lighting
New street lighting has not been proposed, and cyclists may be ‘invisible’ to walkers and drivers. The City should explore the need for additional lighting, especially at intersections where so many different movements will be taking place. In addition, as part of the introduction of the cycle track, the City should explore the opportunity to market and enforce state laws requiring bicycles to carry white front lights on bicycles visible that are visible from 500 feet. WalkBoston has received comments from a number of our older members that they find it impossible to see bicyclists approaching at night if they do not use head lights, and with the addition of a sidewalk level cycle track they are very nervous about crossing the track at intersections.

10. Driveways
A great number of private driveways will be accommodated with this design, with each rebuilt to cross both sidewalk and bicycle facilities. The north side of the street has 43 driveways and the south side has 30. Most of the driveways are narrow, and will involve drivers who will back out to reach Beacon Street. Drivers backing vehicles into the street may have obstructions that limit abilities to see approaching walkers, runners or cyclists.

11. Speed control
Speeds on local streets that are primarily residential such as Beacon Street should be strictly regulated. The current 30-mph limit should not be raised. It should be made lower with advisory signs if possible. Reminder signs should be posted at intervals along the route to warn drivers not to go faster.

Thank you for the opportunity to comment on this project. Please feel free to contact us if you should have questions.

Sincerely,

Wendy Landman
Executive Director

Robert Sloane
Senior Planner

Beacon Street Multimodal Improvements and Streetscape Enhancement Comment Letter

Beacon Street Multimodal Improvements and Streetscape Enhancement Comment Letter

The Beacon Street project area extends from the bridge abutment at Oxford Street to Dickinson Street, a distance of approximately 1.1 miles. The project is intended to enhance pedestrian and bicycle movements with improved streetscape, wider sidewalks, a new cycle track/bicycle lanes, and new ADA compliant curb ramps. The project goal is to enhance the multimodal connectivity of the Beacon Street Corridor.

Read the full letter here:
WalkBoston-CommentENF-BeaconSt-Somerville

Arlington Massachusetts Avenue Redesign Regional Advocate Comment Letter

Arlington Massachusetts Avenue Redesign Regional Advocate Comment Letter

To: Richard Davey

Massachusetts Secretary of Transportation

From: Phil Goff, Co-Chairman, East Arlington Livable Streets Coalition
David Watson, Executive Director, MassBike
Wendy Landman, Executive Director, WalkBoston
Charlie Denison, Advocacy Committee Chair, LivableStreets Alliance
Chris Hart, Director of Transportation Projects, Institute of Human Centered Design
Pete Stidman, Executive Director, Boston Cyclists Union

Re: Arlington Mass Ave Corridor Plan redesign project
Date: March 28, 2013

Dear Secretary Davey:

As a group of neighborhood and regional advocacy organizations that promote Complete Streets, safer walking and bicycling, and sustainable transportation planning policies, we are unanimous in our support of the Town of Arlington’s current plan for the reconstruction of Massachusetts Avenue from the Cambridge line to Arlington Center. The Town’s current plan includes the reconfiguration of the de facto four-lane street into a three-lane roadway with striped bike lanes, wider sidewalks, improved crosswalks with refuge islands and an assortment of streetscape enhancements. We are collectively writing to express our concern that MassDOT may give too much weight to a non-binding ballot question on the local ballot in Arlington that contradicts state policies and guidelines.

Public support for the Mass Ave project is strong throughout East Arlington and among a number of businesses in the Capitol Square business district. This has been made clear in numerous meetings in the past three years, including MassDOT’s 2011 25% design hearing where over 60% of the public comments were made in support of the three-lane plan. More recently, MassDOT’s Feb 26th 75% hearing drew hundreds of supporters from throughout the Town and public comments in support ran 3:1 versus those opposed. The Arlington Board of Selectmen unanimously supports the plan and would like to see the four-and-a-half year process come to a conclusion soon.

Similar to other projects that promote a reduction in the available space for motor vehicles, opposition has formed among some neighbors and businesses. For the past four years, the opposition group has become more entrenched and has tried to delay or stop the project on numerous occasions. Most recently, opponents to the current three-lane plan gathered enough signatures to place a non-binding referendum on the April 6th ballot for Town elections. The question simply asks if Arlington voters desire to “retain four lanes on Mass Ave in East Arlington as currently practiced.”

The question discusses none of the safety benefits of the three-lane plan, whether four lanes would accommodate MassDOT design guidelines or the potential impact on funding of a “yes” vote. While we respect the use of a ballot referendum to guide local decision-making, the simplicity of the question is an inappropriate response to a complex roadway design and engineering project. A resulting “yes” vote to recommend a four-lane plan would contradict MassDOT guidelines for safe bicycle accommodations and puts numerous pedestrian safety features at risk. Four travel lanes would also contradict the goals set forth in the Healthy Transportation Compact, the GreenDOT policy, the Governor’s “Way Forward” and the Mode Shift Goals to triple the share of walking, bicycling and transit use by 2030.

The Board of Selectmen has made clear their support for the project and, short of an extremely-unlikely lopsided vote, will continue to support a three-lane design in accordance with state policy and guidelines. However, in both individual meetings and at the 75% hearing, Town officials and community members have received mixed messages from MassDOT staff about the potential results of the referendum. This included hints that a majority “yes” vote for four lanes could endanger state support and funding for the current three-lane plan. This possibility is a serious concern to our organizations as a worrisome precedent to future roadway reconstruction projects that incorporate pedestrian and bicycle enhancements that may be controversial.

In conclusion, we strongly encourage MassDOT to maintain support and full funding for the reconstruction of Mass Ave in Arlington no matter the results of the simplistic non-binding referendum. To abandon support would send a message that MassDOT is unwilling to stand behind its own Complete Streets policies, guidelines and goals, and would encourage opposition to Complete Streets in projects throughout the Commonwealth.

CC: Tom Broderick, Chief Engineer, MassDOT
Kim Sloan, Project Manager, MassDOT
Senator Ken Donnelly
Representative Sean Garballey
Representative Dave Rogers
Kevin Greeley, Chair of the Arlington Board of Selectmen Adam Chapdelaine, Arlington Town Manager Congressman Ed Markey

Massachusetts Avenue Reconstruction Regional Advocate Comment Letter

Massachusetts Avenue Reconstruction Regional Advocate Comment Letter

As a group of neighborhood and regional advocacy organizations that promote Complete Streets, safer walking and bicycling, and sustainable transportation planning policies, we are unanimous in our support of the Town of Arlington’s current plan for the reconstruction of Massachusetts Avenue from the Cambridge line to Arlington Center. The Town’s current plan includes the reconfiguration of the de facto four-lane street into a three-lane roadway with striped bike lanes, wider sidewalks, improved crosswalks with refuge islands and an assortment of streetscape enhancements. We are collectively writing to express our concern that MassDOT may give too much weight to a non-binding ballot question on the local ballot in Arlington that contradicts state policies and guidelines.

Read the letter here:
WalkBoston-Comment-RegionalAdvocatesMassAve_130328-Arlington

 

Alewife Brook Parkway Bridge Comment Letter

Alewife Brook Parkway Bridge Comment Letter

October 13, 2009

Secretary Ian Bowles
Executive Office of Energy and Environmental Affairs 100 Cambridge Street, Suite 900
Boston, MA 02114
Attn: Anne Canaday

RE: Environmental Notification Form (ENF)
Mystic Valley Parkway Bridge No. 2 over Alewife Brook Somerville, MA
MEPA # 14487

Dear Secretary Bowles:

WalkBoston has reviewed the Environmental Notification Form (ENF) for Mystic Valley Parkway Bridge No. 2 over Alewife Brook in Somerville.

Located on an historic parkway bridge, the project is a reconstruction that will add significant width to the bridge cross-section to widen the bridge sidewalks and better accommodate pedestrians and bicycles, while maintaining access for automobile traffic.

Our understanding of the project is that the DCR plans to retain the curb-to-curb width of the bridge, striping 12’ lanes with 8’4” shoulders that could be converted to bike lanes in the future. An addition of 8 feet to the sidewalks will make both directions 10 feet wide to better accommodate pedestrians and bicycles and connect to the existing and proposed multi-use paths in the adjacent riverbank parks.

While we are very pleased that the sidewalks will be widened, we urge DCR to consider the following possibilities:

  1. With the guidance of DCR, we have learned over time that a parkway is not solely a road,but a park that has a road that passes through it. The Mystic Valley Parkway is a case in point. It is a set of continuous open spaces located within neighborhoods that are densely built. These open spaces are the major parks available to nearby residents. Since roadways are but one element of the parkway, they should not be allowed to determine the character of this remarkable string of urban parks.
  2. It is difficult to imagine traffic moving more rapidly than 30 mph inside a park. That should be the maximum speed. All speed limits in the park and on the parkway roads should be made 30 mph or less to safely accommodate non-motorized traffic.
  3. The parkway and its roads are intended for non-commercial traffic only. We have serious reservations about the need for 12’ lanes for traffic if no trucks are using the bridge. Wide lanes will encourage drivers to move faster through the corridor, to the detriment on non- motorized traffic of all kinds. Since it is not a truck route and will never serve heavy trucks in the future, it seems that narrowing the travel lanes to 11’ or less could be accomplished without inconveniencing traffic. This very simple design feature would produce safety benefits for pedestrians, bicycles and vehicles by slowing speeds.
  1. The shoulder of the roadway should be designed for installation of bike lanes, even if not intended immediately. The Mystic River Corridor Parks are destined to become increasingly attractive to bicycle riders for both commuting and recreation. As bike traffic grows, all parts of the Mystic Valley Parkway should be upgraded to accommodate on- road bike lanes that are sufficiently wide for rider safety. The bridge sidewalks should be reserved for pedestrians, in keeping with a long-term goal of separate paths for pedestrians and bicycles through the length of the riverbank parks.
  2. The Mystic Valley Parkway Bridge No. 2 is in line to provide major access to the future Route 16 Green Line station at the Somerville/Medford line. It has been described as one of three key routes people will use to get to the new station. That means that there will be peak hours of all types of traffic on the bridge. It should be designed to accommodate peak hour transit rider traffic on foot and by bicycle.
  3. The nearby rotary at Mystic Valley Parkway and Alewife Brook Parkway is only a few hundred feet from this bridge. This rotary is to be redesigned to bring it up to modern standards in connection with the proposed Green Line extension to Route 16. The rotary is on the walking route to the new Green Line station, a new senior housing facility, Dilboy Stadium and the Mystic River Reservation, and is currently extremely dangerous to cross, as there are NO pedestrian accommodations of any kind. The plans (or at least conceptual changes) for this rotary should be considered when deciding how to reconstruct the bridge so all the elements ultimately work together for the benefit of all the users.

Thank you for the opportunity to comment on this ENF. We look forward to further development of the project.

Sincerely,

Wendy Landman
Executive Director

Robert Sloane
Senior Planner

Cc:DCR Commissioner Rick Sullivan
DCR Planner Dan Driscoll
MHD Chief Engineer Frank Tramontozzi