Tag: Back Bay

Comments on Beacon Street Redesign

Comments on Beacon Street Redesign

June 30, 2017

Gina Fiandaca, Commissioner
Boston Transportation Department
1 City Hall Sq., Suite 721
Boston, MA 02201

Re: Beacon Street Redesign

Dear Commissioner Fiandaca,

WalkBoston strongly supports the re-­design of Beacon Street to slow vehicular traffic and improve pedestrian safety. As the neighborhood expressed at the Public Meeting on June 12, 2017, the narrowing of the street will reduce the numerous traffic crashes, including pedestrian fatalities in the past several years. Moreover, the improvements will be implemented in the near term.

WalkBoston Supports Alternative 1, Option A
WalkBoston supports Alternative 1, the Preferred Design, which the neighborhood endorsed at the Public Meeting. This design calls for the removal of a travel lane, two one-­way travel lanes, a bicycle lane and parking on both sides of the street. The buffer between the bike and parking lanes will not only increase bicyclist safety, but also make cycling more comfortable.

Alternative 1 has two options at the intersection of Massachusetts Avenue/Beacon Street. Of the two options, WalkBoston strongly supports Option A, which will retain the protected bike lane to Massachusetts Avenue and also preserve parking. Option B mixes bicycles and vehicles in order to provide a right hand turn for motorists. We believe the vehicle volumes do not necessitate this vehicular right turn and will be very dangerous for cyclists.

Traffic Signals Should Be Automatic with LPIs
Traffic signals in this downtown neighborhood should be automatic (no pushbuttons) and on throughout the 24-­hour period (except when signals are in flashing mode). WalkBoston also understands that leading pedestrian intervals (LPIs) will be incorporated at all signalized locations. Finally, WalkBoston has noted that throughout the City, the concurrent green is on for a relatively short period of time. We request that the concurrent WALK remain throughout the concurrent vehicle green.

Increase Crossing Safety by Establishing No Right Turn on Red and Installing Tactical Medians
The City has installed No Right Turn on Red (NTOR) at intersections throughout the City where there are large volumes of pedestrians. We are pleased to see that the City is calling for NTOR at all intersections in this re-­‐designed section of Beacon Street.

Medians or refuge Islands provide safety at intersections for crossing pedestrians. WalkBoston requests that the City consider temporary medians through paint and flex posts at all crossings.

Re-­Assess Visitor and Resident Parking
At the Community Meeting many attendees asked that the City re­assess the assigned parking, which was established in the 1980s. The City expressed interest in working with the neighborhood to assess how curb space is currently used, and how a balance can be found to meet current resident, visitor, and delivery needs.

In summary, WalkBoston strongly supports the Alternative 1, Option A Design and looks forward to working with the City to implement and evaluate the design. Thank you for consideration of our comments.

Sincerely,

Dorothea Hass
Sr. Project Manager

Comments on the DEIR/DPIR for the Back Bay/South End Gateway Project

Comments on the DEIR/DPIR for the Back Bay/South End Gateway Project

April 18, 2017

Matthew Beaton, Secretary
Executive Office of Energy and Environmental Affairs (EEA)
ATTN: Alex Strysky, MEPA Office 100 Cambridge Street, Suite 900
Boston MA 02114

Brian Golden, Director
Boston Planning and Development Agency
ATTN: Michael Rooney
One City Hall Square
Boston, MA 02201-­‐1007

RE: Comments on the DEIR/DPIR for the Back Bay/South End Gateway Project
MEPA: #15502

Dear Sirs:

WalkBoston has reviewed the DEIR/DPIR for Back Bay/South End Gateway Project. We are concerned about this project because of its impacts on rail and bus transportation, walking and biking. With the latest submission of plans for the project, we continue to see serious issues with pedestrian access into, through and around the site. These are described below.

  1. Inappropriate relocation of the layover site for the Route 39 bus
    The proposal states that the layover site for the Route 39 bus will be located “off-­‐site.” Back Bay Station is one end of this bus route, which is one of the busiest in the MBTA system, serving Back Bay, the Fenway and Jamaica Plain. Buses congregate here and wait until schedules require them to return to the main route.The proposal for Route 39 is to remove it entirely from the streets directly connected to Back Bay Station, and to truncate the route before it connects with the Orange Line or the commuter rail/Amtrak services. Reducing the convenience of connections between Route 39 and other portions of the MBTA system will result in negative impacts on transit riders that should be avoided. We urge the City and MEPA to require the proponent to bring Route 39 back to the station. A possible layover site is Trinity Place (between Stuart and St. James Streets). The re-­‐routing of the 39 bus route to this layover location could provide a reasonable drop-­‐off and pick-­‐up solution on Stuart Street, which will have direct pedestrian access in Back Bay Station for bus riders.
  2. Sidewalks that surround the site
    Sidewalks along the Dartmouth Street side of the project, where foot traffic is already heavy and likely to increase due to the new development, have been widened to a minimum of 13 feet, as shown in Fig, 3.8b. Sidewalks along Stuart Street are to be a minimum of 11 feet, as shown in Fig, 3.8c, perhaps reflecting the proponent’s projection of likely foot traffic on this side of the site. Along Clarendon Street, sidewalks range from 9 to 15 feet, as shown in Fig. 3.8d; it is not entirely clear if the 9’ width is a result of the footprint of the proposed residential building.Sidewalks may not be sufficiently wide, especially if street trees, planters or bicycle parking are also accommodated in the width otherwise available for pedestrians.A large public plaza is proposed at the Clarendon Street intersection to replace the existing forecourt to the east entrance to the station. Here sidewalks are very wide and the plaza offers generous open space. Much of this plaza appears to be for passive use to people walking by, although there is a retail space provided in one corner that, if used as a restaurant, might result in tables on the outdoor plaza.We are pleased to see that the principal entrance to Back Bay Station on Dartmouth Street is enhanced by the addition of major new entrances framed by the arch and a design that focuses on providing continuity of the sidewalk and interior surfaces to unite them and welcome users. An enlarged Dartmouth Street crosswalk that is 60 feet wide along the site’s frontage will be centered on the new entrance. Taxi zones are provided both north and south of the main entrance.We are pleased that the proponents have increased sidewalk widths by comparison to the earlier proposals.
  3. Movement on sidewalks around the perimeter of the project
    The project site is in a pedestrian-­friendly portion of the city. There are more people walking along and crossing the perimeter streets than there are drivers using these same streets. For example, looking at the existing condition pedestrian volumes counted between 8:00 and 9:00 AM in 2016 in Figure 4.6a, we note that there are 2,253 people crossing Dartmouth in front of Back Bay Station, 1,264 walkers crossing on the east walk of the Stuart Street/Dartmouth Street intersection, 1,098 pedestrians crossing Stuart Street at Trinity Place, and 1,646 pedestrians crossing Stuart Street at Clarendon Street. A total of 1,071 pedestrians crossed the garage driveway on Clarendon Street during this period.Meanwhile, in the same period, Dartmouth Street handles 486 cars northbound and 703 cars southbound. Stuart Street handled 784-­1,057 vehicles in this period and Clarendon Street handled 503-­625 vehicles.Although there are 15 different projections of vehicular traffic under alternative futures, there are no projections at all of pedestrian traffic. There are, however, projections of pedestrian level of service at selected intersections. See Table 4.12.3 page 4-­126. The accompanying text states that PLOS doesn’t change between Existing, No-­build and Build Conditions because walk times and cycle lengths will not change. Is this a valid conclusion without he benefit of projecting future pedestrian volumes?Based on the data that was provided, it appears that there are about three times as many pedestrians as there are cars during peak hours.
  4. Movement across the sidewalk – Dartmouth Street
    In order to improve access to the proposed parking garage, the proponent has proposed changing Turnpike access patterns and partially shifted vehicle access and egress away from Stuart and Clarendon Streets and provided a new exit onto Dartmouth Street. These changes directly affect pedestrian safety at the principal pedestrian access to Back Bay Station.As shown on the proponent’s plans, the proposed vehicular exit from the garage is in an inappropriate location on Dartmouth Street. The exit ramp will pose a hazard for pedestrians on this portion of Dartmouth Street, where thousands of people (see numbers in Section 3 above) are walking during peak hours. This location is an especially busy and important place for pedestrians walking to, through and making connections to transit.Shifting the location of Turnpike access so significantly by removing a major access point to the westbound Turnpike in the midst of Back Bay and requiring all drivers to use alternative access on Huntington Avenue does not make sense for this part of the City. This does not seem an appropriate choice in the context of Boston’s adoption of Vision Zero and the City’s declaration in GoBoston 2030 that Boston will “prioritize the movement of people over cars.”
    WalkBoston does not believe that it is in the interest of public safety and convenience to shift existing vehicular access so that it results in a garage exit ramp in a congested pedestrian zone. An alternative to this garage exit ramp should be developed.
  5. Movement across the sidewalk -­Clarendon Street
    On the Clarendon Street side of the property, there are multiple garage entrances and exits as there are today, and the sidewalk needs very careful treatment to protect pedestrians. The proposal to add a bulb out to shorten the Clarendon mid-­‐block pedestrian crossing is a good idea. As noted above, WalkBoston believes that Clarendon Street is a better location for garage and Turnpike access than the proposed Dartmouth Street garage exit and circuitous Turnpike access.The new plaza on the Clarendon Street side of the property has been designed with a drop-­‐off lane that doubles as a route for delivery and service vehicles for the residential and retail occupants of the structure. The drop-­‐off lane occupies what appears to be about 40% of the plaza, and raises the question of whether it needs to be this size.If the space is being used primarily for vehicular needs – drop-­offs, taxis, deliveries, service, and potential bus storage – that colors the manner that the design might take for the plaza. If, on the other hand, some of the vehicular needs could be transferred to the street – perhaps with some widening to accommodate the intended use. Getting rid of the drop-­off lane would considerably improve the potential for this plaza to be genuinely pedestrian-­friendly, and open it to other retail uses that would enhance the productivity and attractiveness of this end of the property.
  6. The station area concourse
    We are gratified that the proponent enlarged the proposed waiting area, rather than transforming it into a retail facility. However, we continue to be concerned about the redesign 4 of the concourses to narrower passageways lined by many retail facilities. New retail activity will increase in the number of pedestrians to accommodate on the narrowed concourses. The relocation of the commuter rail and Amtrak ticket offices to a new location at a substantial distance from either the waiting area or the entrances to the rail platforms seems ill-­‐advised. The proposed new location is deeper within the station area, much closer to the east entrances than to the likely more important west entrances. It is also indistinguishable from adjacent retail stalls that may or may not have relevance for rail travelers. The proposed layout is occurring during a period of reduction in the number of small retail businesses in many locations, including central Boston and the Back Bay. Active ticket offices in a central location may be more important to bolster other retail outlets, and benefit the management and rental of retail stalls throughout the station area.
  7. Construction on the rail station platforms
    The proposal calls for use of the station platforms for supports for the new high-­‐rise building being built in the Station East portion of the project. These new obstructions narrow the platforms for waiting or alighting passengers and add complexity in an environment where moving to or from access points is already complicated. This is true of both the Orange line platform, serving both directions for subway passengers and the southernmost railway platform serving commuter rail passengers to and from the south and southwest, including Providence, New York, Washington and the entire eastern seaboard.Using the existing rail platforms for construction of these supports will obstruct passenger traffic during construction as well as after completion. Designs should be carefully integrated with existing obstructions such as columns to minimize interference with passenger traffic flow.

We are very concerned about the changes proposed for the station, the bus layover facility, the vehicle circulation, sidewalks and interior passageways. We would appreciate your consideration of our comments and look forward to your responses to them. Please feel free to contact WalkBoston with questions you may have.

Sincerely,

Wendy Landman                                               Bob Sloane
Executive Director                                             Senior Project Manager

 

Cc City Council President Michelle Wu
City Councilor Josh Zakim
Ellis South End Neighborhood Association
Bay Village Neighborhood Association
Neighborhood Association of Back Bay

Comment Letter: A proposal for the Massachusetts Avenue Bridge

Comment Letter: A proposal for the Massachusetts Avenue Bridge

September 19, 2016

Mayor Martin Walsh, Boston
Mayor Denise Simmons, Cambridge
Stephanie Pollack, Massachusetts Secretary of Transportation
Tom Tinlin, Massachusetts Highway Administrator
Leo Roy, Massachusetts Commissioner, Department of Conservation and Recreation
Monica Bharel, Massachusetts Commissioner, Department of Public Health

Re: A proposal for the Massachusetts Avenue Bridge

Dear Friends:

Boston and Cambridge have declared themselves Vision Zero cities. The Healthy Transportation Compact has united our state agencies in concerted efforts to increase active transportation and improve safety for walking and bicycling.

DCR is on track to add a new Charlesgate Path and a signalized pedestrian/bike crossing of the Mass Ave Bridge to connect the Esplanade with the Back Bay/Kenmore neighborhoods (the crosswalk will be located where the Mass Ave. Bridge crosses the open space between inbound and outbound Storrow Drive). The new Charlesgate path, and the enhanced connection between the Esplanade and Charlesgate via the new crosswalk will generate significant new use by people walking and biking.

These are wonderful developments for people from across Massachusetts and the world who commute, amble and sightsee on the Esplanade, along Memorial Drive, and across the Massachusetts Avenue Bridge! And, they are all leading to more people on foot and bike on the bridge.

As we see the increase in people walking and biking, the lack of safe biking accommodation on the Mass Ave Bridge is leading to large numbers of bicycles on the sidewalks of the Bridge – an unsafe and uncomfortable situation.

We ask that MassDOT, DCR, Boston and Cambridge explore the re-purposing one of the outbound Mass Ave Bridge vehicle travel lanes to provide space for a protected bike lane on each side of the bridge, with access provided from the Esplanade and Charlesgate paths that will connect to the Bridge.

Based on a very preliminary look at the traffic volumes and lane use on the Bridge, we believe that improving the network by adding low-stress, protected bicycle lanes could be accomplished without significant impacts to vehicle operations. Providing protected bike lanes will both improve the safety of people on bikes and improve the safety of pedestrians by removing bicycles from the Bridge sidewalks.

We look forward to working with you and your staff to explore this suggestion.

Best regards,

Wendy Landman, Executive Director, WalkBoston
Tani Marinovich, Executive Director, The Esplanade Association

Cc Senator Will Brownsberger
Senator Joseph A. Boncore
Representative Jay Livingstone
Chris Osgood, Chief of Streets, City of Boston
Gina Fiandaca, Boston Commissioner of Transportation
Joe Barr, Director of Traffic, Parking, and Transportation, City of Cambridge
Becca Wolfson, Executive Director, Boston Cyclists Union
Stacy Thompson, Executive Director, LivableStreets Alliance
Richard Fries, Executive Director, MassBike
Herb Nolan, Solomon Fund
Renata von Tscharner, Charles River Conservancy
Peter Furth, Northeastern University
Suzanne Walmsley, Boston Athletic Association

Comment Letter: ENF and the PNF for the Back Bay/South End Gateway Project MEPA: #15502

Comment Letter: ENF and the PNF for the Back Bay/South End Gateway Project MEPA: #15502

June 17, 2016

Matthew Beaton, Secretary
Executive Office of Energy and Environmental Affairs (EEA)
ATTN: MEPA Office
100 Cambridge Street, Suite 900
Boston MA 02114

Brian Golden, Director
Boston Redevelopment Authority
One City Hall Square
Boston, MA 02201-1007

RE:  Comments on the ENF and the PNF for the Back Bay/South End Gateway Project MEPA: #15502

Dear Sirs:

WalkBoston reviewed the ENF and PNF for Back Bay/South End Gateway Project.

We are very interested in this project, which is superbly located to be served by public transportation, walking and biking. However, we have concerns about pedestrian access into, through and around the site which we would like to see addressed in the next project submissions. These are:

1. Relocation of the layover site for the Route 39 bus
The proposal states that the layover site for the Route 39 bus will be located “off-site.” Back Bay Station is one end of this bus route, which is one of the busiest in the MBTA system, serving Back Bay, the Fenway and Jamaica Plain. Buses congregate here and wait until schedules require them to return to the main route.This bus route is too important to the MBTA system and its many riders to shift the layover site to another location which could lead to a major change in the frequency of bus service. A layover location must be found nearby.

2. Sidewalks that surround the site
Sidewalks along Stuart and Clarendon Streets have been designed at minimum widths for their functions. The MassDOT Design Guide calls for sidewalks in busy downtown areas of cities to be between 12 and 20 feet in width. These guidelines should be generously incorporated into the planning for this project.  The City’s Complete Streets Guideline Manual suggests that 8 feet is a minimum but prefers a width of ten feet.

This is particularly important for the Dartmouth Street side of the project. Foot traffic on Dartmouth Street is already heavy and likely to increase, due to the new development and to moving the principal entrance to the station to the center of this frontage. The plan calls for a portion of the Dartmouth Street frontage to be as narrow as 8 feet at one point, and 13 feet otherwise. The 8’ foot width, which appears along a planned ADA ramp into the first-floor retail area, is not adequate for this location. Perhaps this width could be expanded by moving the ADA ramp into the retail area of the building or by selectively eliminating portions of the drop-off/taxi lane which extends from the station entrance to Stuart Street. Alternatively, perhaps a thoughtful reduction of the number of trees and their placement might be appropriate to widen the clear width of the walkway.

3. Garage exit on Dartmouth Street
One of the unfortunate consequences of the design for re-use of the Garage East and West portions of this project is the potential use of Dartmouth Street as one of the exits from the on-site garage. This appears to result from redesign of the existing garage which currently has two entrance and exit ramps.

The proposed new parking facility removes two the existing garage access ways – those leading in and out of the garage in drums connecting with Trinity Place. It retains the existing entrance and exit ramps on Clarendon Street. The design calls for no new entrance ramps. However, it calls for a new exit ramp that requires removal of the Turnpike on-ramp. If the Turnpike ramp is retained, the proponent maintains that there is a need for a replacement exit onto Dartmouth Street.

The proposed exit ramp onto Dartmouth Street is deeply consequential for pedestrian traffic. It is difficult to imagine a more inappropriate design than the insertion of a major vehicular exit from the garage onto the Dartmouth Street sidewalk, the primary pedestrian access route to and from Back Bay Station. Certainly there must be a better place to provide a garage exit than this, possibly by retaining one of the drums could be retained for exiting traffic directly onto Trinity Place.

4. The station area concourse
Back Bay Station was designed as a large arched hall, flanked on both sides by hallways leading to ticket and waiting areas. Each platform has its own stairways, escalators and /or elevators connecting the platform to the station concourse. Train platforms are split, with the Worcester/Amtrak Chicago line platforms near the north edge of the station concourse, and the New York/Amtrak Washington platforms near the south edge. Access to the Orange Line platform is directly in the center of the station, under the arched portion of the station structure. On either side, outside the arched hall, two wide concourses connect through the block between Dartmouth and Clarendon Streets.

Within the large arched hall, pedestrian movement is presently blocked for concourse movement by a fence that surrounds the major access stairways and escalators to and from the Orange Line. The proposal calls for a removal of some of this blockage and relocation of the two principal concourse pathways between Dartmouth and Clarendon Streets into the arched hall. The present concourses, outside the arched hall, are then repurposed for retail and other facilities.

The relocation or shrinking of the passenger concourses and repurposing the space occupied by the old ones raises a concern as to whether the new routes are sufficiently wide to handle projected growth in passenger volumes. Although it is uncertain what projections of passenger volumes might show, according to the project proponent, the station already handles 30,000 passengers per day. The MBTA currently maintains there are 36,000 Orange Line passengers here, plus 17,000 commuter rail passengers. Amtrak may constitute an additional 2000 passengers. New projections of traffic should be undertaken to determine likely future volumes of people using the station.

With the knowledge of the likely future traffic of patrons of the Orange Line, the commuter rail lines and Amtrak, the plan must provide good access to and egress from the following locations:

– The Dartmouth Street entrance
– The Orange Line station (two stairways, escalators, one elevator)
– The underpass beneath Dartmouth Street to the Copley Place mall (one stairway)
– The commuter and Amtrak rail lines west toward Worcester and ultimately Chicago (two stairways, one elevator) serving 15 stations and communities
– The commuter and Amtrak rail lines that generally go south and follow the east coast to Providence, New York and Washington D.C. (two stairways, two escalators, one elevator) serving 47 stations and communities
– The proposed new passageway to Stuart Street and into the Garage West office structure
– Ticket machines for passes and Charlie cards for the subway lines.
– Amtrak ticket offices
– Commuter rail ticket offices
– Restrooms for the entire station concourse area
– Food and retail outlets proposed for the concourse level
– Food and retail proposed for the second level
– Food and retail outlets proposed for the third level
– Waiting areas including seating for passengers traveling by rail
– The existing and new parking garages in the Garage West/East areas
– The new residential building in the Station East area at the Clarendon Street end of the project

All but the last two of these movements take place primarily in a compressed space that extends about 100’ from the main entrance on Dartmouth Street into the station. The proposal significantly diminishes this portion of the existing concourse, serving the movements listed above and lowering the space of the waiting area from 9,225 square feet (41 bays each roughly 15 feet square) to 6,075 square feet (27 bays, each roughly 15 feet square. It calls for eliminating the principal existing waiting area and replacing it with a large food service facility. All waiting passengers will be moved to backless benches located in busy pedestrian passageways, including the major entrance to the building. The proposal also calls for diminishing the size of the concourse by narrowing the existing passageways between Dartmouth and Clarendon Street and replacing them with retail space. It calls for new entrances to the proposed second and third levels in the midst of the existing waiting area. The proposal moves the ticketing area away from the waiting area and into new space along the proposed new passageway, where queuing to purchase tickets (now possible in the waiting area) will compete with pedestrian movement. It is hard to imagine that all these activities can be accommodated in the space planned.

A new design should be undertaken to accommodate the growing number of pedestrians and waiting passengers as well as patrons of food and retail outlets who may choose to sit in this busy space. The existing waiting area should not be removed but instead enlarged to accommodate anticipated future use. Ticketing space should be provided close to passenger access areas. Access to and from the second and third levels should be moved away from the waiting area and into the space that is gained by closing the existing concourse passageways. Retail areas adjacent to the passenger waiting area should be scaled back to remove potential blockage of clear and very visible access to and from the stairways leading to transportation facilities below the concourse. Benches for rail passengers should not be relegated to busy portions of the concourse, especially where they might interfere with pedestrian traffic through the concourse.

5. Construction on the rail station platforms
The proposal calls for use of the station platforms for supports for the new high-rise building being built in the Station East portion of the project. These new obstructions narrow the platforms for waiting or alighting passengers and add complexity in an environment where moving to or from access points is already complicated. This true of both the Orange line platform, serving both directions for subway passengers and the southernmost railway platform serving commuter rail passengers to and from the south and southwest, including Providence, New York, Washington and the entire eastern seaboard.

Using the existing rail platforms for construction of these supports will obstruct passenger traffic during construction as well as after completion. Designs should be carefully integrated with existing obstructions such as columns to minimize interference with passenger traffic flow.

We are very concerned about the changes proposed for the station, the bus layover and the sidewalks and interior passageways. We would appreciate your consideration of our comments and look forward to your responses to them. Please feel free to contact WalkBoston with questions you may have.

Sincerely,

Wendy Landman
Executive Director

Comments on Copley Place Expansion, Boston, MA

Comments on Copley Place Expansion, Boston, MA

March 5, 2015
Attn: Christopher Tracy, BRA

RE: Comments on Copley Place Expansion, Boston, MA

WalkBoston submits the following comments on the Copley Place Expansion project design, with a focus on the pedestrians and community design aspects. The expansion to Copley Place will have significant impacts on future pedestrian activity in the project area, which attracts many pedestrians because of numerous hotels, Back Bay Station, Copley Square, the Farmer’s Market, the Public Library, etc. Now is the time and opportunity to make it more pleasant and safer for them. The pedestrian aspects of the site will play an extremely important role in the way the project meshes with its surroundings and with all modes of traffic.

We submit our comments despite the lack of community opportunity to see the plans ahead of time or to have adequate opportunity for input. It might be very useful for community groups to have another opportunity to view the plans.

Intersection of Dartmouth and Stuart Streets
With appropriate signal timing, the changes proposed for this intersection will make it much easier, more direct and safer for pedestrians to cross. It is essential that the WALK – Don’t WALK signals at this intersection be timed for concurrent walk, as they are currently. With these changes, there will no longer be frustrating waits for pedestrians on medians, as the crossings are direct and narrower. As we understand this particular design, it was first proposed and tested in 1995 and found to work well for both traffic and pedestrians. We trust that its basic elements are included in the present plan.

The Southwest Corridor Park
Our understanding is that the plan presented for the street level pedestrian crossing of Dartmouth Street, at the end of the Southwest Corridor Park, is essentially unchanged from the original design. The present excellent signal timing appears to efficiently handle traffic from all modes. This signal timing should be retained and the crossing widened.

The proponent should respect the history of the Southwest Corridor Park in the improvements that are proposed. One approach would be the inclusion near the entrance to the walkways of an 8’x4’ enamel plaque such as the one at Roxbury Crossing, giving the history of the Southwest Corridor project and sites of interest in the vicinity of Copley Place.

Sidewalk along Dartmouth Street at Copley Place
In the vicinity of this project, no sidewalk should be less than 12 feet wide, unobstructed. The best example is the sidewalk that now exists along the façade of Neiman Marcus. Since it is adjacent to the sidewalk, the proposed “winter garden” should supplement pedestrian movements at the edge of the site and be genuinely public, open 24 hours, guaranteed by a legal commitment with consequences for violations.

There should continue to be outside seating, preferably using the same benches, positioned 2 for conversation. The current gradually ramped approach from Dartmouth into the building should be retained and not replaced by steps.

Mass Turnpike exit ramp
WalkBoston requests that the exit from this ramp provide warnings or restrictions so that Turnpike drivers are slowed as they come into this urban area with many pedestrians. These might include painting lanes so that only one lane of cars will exit, adding rumble strips across the roadway or blinking signs inside the tunnel warning Turnpike drivers of their upcoming exit into a busy pedestrian area. The 25 mph warning signs installed some 15 years ago are not emphatic enough to slow cars.

Loop turn for vehicles at the end of the Westin Hotel
WalkBoston supports the narrowing of the loop turn from Huntington to Stuart at the end of the Westin. This improvement results in the elimination of the left turn lane on Huntington and the expansion of the island. It should be designed to be a pleasant park-like area with signs minimized or relocated.

Exeter/Stuart/Huntington/Marriott garage area
As we have previously commented, much more work is needed on the Exeter/Stuart/Huntington/Marriott garage area— implementation of better signal timing, narrowing roadway widths and shortening pedestrian crossings. The blocks of Huntington/Stuart from Mass Ave to Clarendon were widened in the 1960s auto era, and are now too wide open for this dense urban area. Their width and layout encourage traffic to speed and endanger pedestrians. This project should make the cross-section of the street narrower as has been done outbound on Huntington Avenue at Mass. Ave. and on inbound Stuart Street at Clarendon Street.

Harcourt/Huntington/Ring Road intersection
The Harcourt/Huntington/Ring Road intersection should be reshaped and re-signaled, especially since increased volumes of traffic will be using Harcourt Street for access to the proponent’s garage.

Sidewalk and crosswalk materials
All materials used for sidewalks and crosswalks should adhere to standards that have been established under ADA. All sidewalks should be constructed of concrete, using bricks, if desired, only for decoration because of the walking difficulties and hazards they create. Crosswalks in particular should be marked by striping, not pavers, on the roadway pavement. Pavers are hazardous for the disability community, parents with strollers, women with high heels and the elderly.

We urge the City to address these concerns by insisting that the developer show good faith in solving the issues raised by residents of neighboring area. Please feel free to contact us with questions you may have.

Sincerely,

Robert Sloane               Ann Hershfang
Senior Planner              Board Member, South End Resident