Posts

Green Elementary School Walk Assessment

Green Elementary School Walk Assessment

On May 10, 2017, WalkBoston conducted a walk assessment in the vicinity of the William S. Greene Elementary School in Fall River, in partnership with the Fall River Mass in Motion program and the Massachusetts Department of Transportation’s (MassDOT) Safe Routes to School (SRTS) program. The goals of the walk assessment were to examine pedestrian …

Read More Read More

Comments on Jamaica Pond: Parkman and Perkins Access Enhancement

Comments on Jamaica Pond: Parkman and Perkins Access Enhancement

May 8, 2017 Commissioner Leo Roy Department of Conservation and Recreation Office of Public Outreach 251 Causeway Street, Suite 600 Boston, MA 02114 Re: Jamaica Pond: Parkman and Perkins Access Enhancements Dear Commissioner Roy: WalkBoston is very pleased that Department of Conservation and Recreation (DCR) is designing safe pedestrian access to Jamaica Pond from adjacent …

Read More Read More

Huntington Village Center Walk Audit

Huntington Village Center Walk Audit

Volunteers and staff members in the Town of Huntington responded to a Healthy Hampshire Request for Proposal for walkability project funding. The focus of Huntington’s proposal was the planning and construction of a “River Walk” along the Westfield River to better connect residents and visitors with the natural assets in the region. The proposal also …

Read More Read More

Signal Timing Recommendations

Signal Timing Recommendations

5/2017 11 ways to make Boston’s traffic signals work better for people walking Add concurrent signals at most locations. Concurrent signalization means that people walking receive a WALK signal in the same direction people driving have a green light (i.e., everyone can continue along Mass Ave). This should always be paired with the next item …

Read More Read More

Melrose Street Infrastructure Recommendations

Melrose Street Infrastructure Recommendations

Based on observations made during fieldwork and student arrival at the Melrose Middle School and High School campus, WalkBoston and WatsonActive recommend the following improvements be considered on Melrose Street between the Lynn Fells Parkway intersection and the Tremont Street intersection. Mass in Motion Melrose High School/Middle School Campus Bicycle and Pedestrian Accessibility Project