Author: WalkMassachusetts

Comments on Allston – The I-90 Massachusetts Turnpike Interchange Project, Evaluation Criteria

Comments on Allston – The I-90 Massachusetts Turnpike Interchange Project, Evaluation Criteria

August 6, 2014

Mike O’Dowd
Project Manager, MassDOT
10 Park Plaza
Boston, MA 02116

Re: Allston – The I-90 Massachusetts Turnpike Interchange Project, Evaluation Criteria

Dear Mike:

Thank you and the project team for providing the opportunity to provide comments on the evaluation criteria for the I-90 Turnpike Interchange Project. Rather than focus on the detailed design and environmental criteria that will be used, WalkBoston feels that it is important to set out big-picture performance standards for the project. Thus far the broader community-building implications of what this project can achieve – beyond its roadway connections to the Turnpike – have not been fully laid out.

The following performance standards should help define the project more completely. We suggest that they be considered as part of the minimum requirements for a successful reconstruction of the interchange.

1. Soldiers Field Road/Storrow Drive – The project should result in the expansion of open space along the Charles River. Based on the alternatives we have been shown to date this is likely to be accomplished through the relocation of some or all of Soldiers Field Road/Storrow Drive under the Turnpike viaduct. Existing rail lines would likely need to be altered or relocated as part of the reconstruction. Thus, all final rail alignments and viaduct supporting members should be designed to make room for this riverside highway relocation.

2. Cambridge Street Bypass – Separate local and regional traffic operations should be evaluated. Multiple lanes of traffic (6 to 8 minimum) will likely be necessary for Cambridge Street to accommodate traffic movements. The number of lanes should be defined as soon as possible so that the neighborhood can comment on whether MassDOT should explore a two-street option that provides for a residential district on both sides of a narrowed Cambridge Street, plus a New Cambridge Street to provide connections to the Turnpike ramps, Stadium Way/East Drive and the River Street Bridge. (See attached diagrams of several conceptual possibilities.)

3. Connecting roads north of Cambridge Street All alternatives should include the construction of both Stadium Way and East Drive as integral links in the access pattern of the study area. Without the construction of these two roadways, Cambridge Street and North Allston will be swamped with traffic.

4. Turnpike ramps Alternatives for the Turnpike’s new alignment should be based on a minimum of retained fill (embankments) between the viaduct and ground level, as suggested in Alternatives 3-D and 3-G. This will allow for over-Turnpike connections to access ramps and to West Station.

5. West Station access All alternatives should include convenient and attractive access to both Cambridge Street and Commonwealth Avenue for pedestrians, bicycles, and buses (perhaps with separate bus access from the north and the south) to the West Station headhouse.

While we think that none of the alternatives presented to date meet these standards, we look forward to MassDOT’s development of alternatives that demonstrate how these standards can be realized.

Sincerely,

Wendy Landman              Robert Sloane
Executive Director            Senior Planner

WalkBoston statement on the Anderson Bridge Underpass

WalkBoston statement on the Anderson Bridge Underpass

WalkBoston enthusiastically supports the construction of the underpass for walkers, runners and cyclists beneath the Anderson Bridge, as well as the suggestion that evaluation of this underpass might lead to similar underpass routes beneath approaches to the River Street and Western Avenue Bridges.

Underpasses add significantly to the capacity of the riverside paths and also add to the network of off-road movement options along and across the Charles River. Capital improvements for the surface of all three bridges have been discussed in detail over the past few years and initial plans show positive agency responses to our advocacy for pedestrian movement across those bridges.

The Charles River paths are a key part of the broader transportation network. This proposal highlights the necessary interconnections and reinforces the need for DCR to receive increased funds for the maintenance of these and other riverside facilities.

Boston Globe: “Anderson bridge proposal backed” 8/5/2014

Learn more about the Charles River Conservancy’s Underpasses Advocacy Campaign.

Wollaston Walk Assessment

Wollaston Walk Assessment

WalkBoston led a walk assessment at the WollastonT station in Quincy, MA to evaluate pedestrian safety at the station and along the major road corridors and intersections leading to the T station. The assessment fulfilled several mutually beneficial goals by bringing together federal agencies, state agencies, municipal departments, and advocacy groups around the central issue of implementing built environment solutions to improve pedestrian safety.

Read the full report here:
WalkBoston-WollastonWalkAssessment-Quincy

River Paths

River Paths

River Paths

Healthy Aging Initatives Throughout the State

Healthy Aging Initatives Throughout the State

WalkBoston has Heathy Aging initiatives underway in Brookline, Fall River, Gloucester and Weymouth, training seniors in these communities to conduct audits of various walking routes. The groups are shown how to make constructive recommendations to the city about needed improvements around senior centers, schools, and near transit stops in order to improve accessibility for all residents. Thank you to Healthy City Fall River for the great pictures from last week’s training!

More Info: 

Walkability Assessments and Pedestrian Advocacy 101

—————————————————————————————————

Join our Mailing List to keep up to date on advocacy issues.

Like our work? Support WalkBoston – Donate Now!
Connect with us on Twitter and Facebook