Check out our new report – Pedestrian Infrastructure: Strategies for improving pedestrian safety through low-cost traffic calming.” (Click for instructions to download PDF). 

Low cost fixes to calm traffic and enhance safety on municipal streets and state roads can be a great place to start, as they are likely to be adopted and completed sooner than more expensive projects, and can serve as catalysts for long-term change.

This report was prepared by WalkBoston for Mass in Motion, an initiative of the MA Department of Public Health.

————————————————————————————————

Join our Mailing List to keep up to date on advocacy issues.

Like our work? Support WalkBoston – Donate Now!
Connect with us on Twitter and Facebook

Salem State University Walk Audit

Salem State University Walk Audit

On May 6, 2015, WalkBoston participated in a walk audit on the Salem State University (SSU) campus around the O’Keefe Center and the edges of North Campus. John Pelletier, Mass in Motion Coordinator for the City of Salem, led the audit and the participants included SSU staff, neighborhood advocates, city staff and city council members. The goal of the audit was to discuss the safety and quality of the pedestrian environment along the walk route and recommend improvements that would enhance the pedestrian experience.

Read the full report here:
WalkBoston-SalemStateUniversityWalkAudit-Salem

Comments on Landmark Center Expanded Environmental Notification Form – MEPA #15183

Comments on Landmark Center Expanded Environmental Notification Form – MEPA #15183

May 9, 2014

Secretary Richard Sullivan, Jr.
Executive Office of Energy and Environmental Affairs
Attn: Deidre Buckley, Director, MEPA Office
100 Cambridge Street, Suite 900
Boston, MA 02114

Re: Landmark Center, Boston MA
Expanded Environmental Notification Form – MEPA 15183

Dear Secretary Sullivan:

The Landmark Center, formerly the Sears Warehouse and Distribution Center, occupies an 8.8 acre site in the Fenway. It is a major city landmark and retail center that is at the heart of a burgeoning residential district. This proposed development will intensify the use of the site, making it more of a transit-oriented development, and includes 600 housing units, additional retail and new office spaces. The residential units will be housed in a high-rise building of some 12-13 stories immediately adjacent to the Fenway MBTA station. There will be 110,000 sf of new retail space, including a new Wegman’s Supermarket. Office space, already the single largest use in the building, at 635,000 SF, will be only slightly increased.

Many of the design features of this proposal will benefit pedestrians. Surface parking is replaced by about 1.3 acres of open space, setting off the historic Sears Building and including generous pedestrian walking and sitting accommodations. A new public green at the corner of Park Drive and Brookline Avenue is located where the heaviest pedestrian traffic crosses the street. The existing surface parking and the existing parking garage will be removed. A new underground garage will replace the existing 1500 parking spaces.

The proposed design is organized around pedestrian access. The existing internal circulation in the old Sears Building will be augmented by new pedestrian facilities connecting the Wegman’s market facing Fullerton Street on the east side of the property with retail facilities that face Park Drive on the west. A new pedestrian connection will be made via a walking route that passes through the building connecting the MBTA station on the north side of the site and Brookline Avenue on the south.

To build on these excellent elements of the proposal, we suggest that the proponent also consider the following possibilities:

1. Rationalize the odd combination of parallel streets on the east side of the site. 

Both Fullerton and Minor Streets, directly parallel and adjacent to each other, abut the site on the east side. At present, pedestrians may be only slightly affected by this oddity, largely because both streets are narrow and carry little traffic. However, under the proposed design Fullerton Street is being laid out as the major access route for all trucks and service vehicles and a major entrance into the underground parking garage. Fullerton Street is also called out as a pedestrian connection to the Fenway Multi-Use Path on the north side of the site, and carries large volumes of pedestrians before and after Red Sox games when the garage is in heavy use. Pedestrian safety on Fullerton Street may become an issue, depending on traffic volumes using the street for site access.

2. More clearly define and design the proposed use of the pedestrian areas.
The spacious new open space on the Park Drive side of the site is only vaguely outlined in the EENF. It replaces a large parking area, and will provide a substantial improvement in safety and amenity for pedestrians walking between the MBTA station and both the project and Brookline Avenue. To make this a successful outdoor space that functions as more than a passage around the buildings consideration should be given to sitting, eating, strolling and potential assembly areas. Design of each of the spaces might take into account the need for some protection from the elements (sunlight included). Major features of interest such as a fountain, a sidewalk café, or a sculpture or other visual displays might be added.

3. Work with the City to complete the portion of the Fenway Multi-Use Path that is adjacent to the property
This project and the air rights project (Parcel 7) at Kenmore both include segments of the proposed path that connects the Riverway and Kenmore Square. The proponent has made construction of the path contingent on the City obtaining necessary approvals, and we urge
the proponent to work closely with the City to accomplish that goal, and to work with the City to clarify a list of needed approvals and explain how they will obtained. We also suggest that the proponent explore the possible use of the space for Red Sox related displays, photos, sculptures, artifacts since it is a potentially essential walking route for fans moving between the Fenway MBTA station and Fenway Park. The proponent should also work with the City to provide wayfinding signs along the path.

4. Clarify responsibility for building the Fenway Multi-Use Path connection to the Emerald Necklace.
In addition to the portion of the path that is adjacent to the property (described above), there is an additional relatively short section of the Path between the Riverway and the project site that is extremely important. Under existing conditions, some Fenway Station patrons must cross Park Drive at grade, in a location directly above the station that does not even have a crosswalk. Driver’s sight lines of pedestrians are compromised due to the ‘hump’ of the bridge as it crosses over the Green Line. The completion of the Fenway Multi-Use Path under the Park Drive viaduct, directly adjacent to the Green Line tracks, would allow station patrons and other pedestrians to make this connection more safely and conveniently. This connection is important to the success of the site as a transit oriented development and the proponent should take a positive and active role in its construction. We urge the proponent to work with the MBTA and commit to constructing this important pedestrian facility. It would also be helpful if the pedestrian access that will be adjacent to the station could provide access to St. Mary’s Street to improve safety for riders coming to the station from northwest of the point where Park Drive crosses Fenway Station.

Thank you for the opportunity to provide comments on this significant project.

Sincerely,

Robert Sloane
Senior Planner

Comments on Notice of Project Change for the Mohegan Sun Massachusetts in Revere EEA #15006

Comments on Notice of Project Change for the Mohegan Sun Massachusetts in Revere EEA #15006

March 7, 2014

Secretary Richard K. Sullivan, Jr.
Executive Office of Energy and Environmental Affairs (EEA)
100 Cambridge Street, Suite 900
Boston MA 02114

RE:  Comments on Notice of Project Change for the Mohegan Sun Massachusetts in Revere EEA #15006

Dear Secretary Sullivan:

WalkBoston has reviewed the Notice of Project Change (NPC) for the Mohegan Sun Massachusetts project in Revere and offers the comments below.

The NPC was prompted by the shift of the project location to Suffolk Downs property that is located solely in Revere. This change will have significant impacts on pedestrian movement into and through the project. The elements of the project – two hotels, large gaming space, numerous restaurants and spa– have not changed. But, in the new location, the buildings have a substantially reduced footprint and are much closer to existing business and residential areas.

Walking Access to Transit – Beachmont MBTA Station

The principal impact of the project change for people arriving on foot is the much greater proximity of the development to transit access, now shifted to the Beachmont MBTA Station (formerly focused on the Suffolk Downs Station). The revised location for the proposed resort places the main entrance only 300 feet from Beachmont Station, and will likely shift some trips from autos to transit because of this proximity.

In order to encourage transit and walking trips, we suggest exploring several pedestrian amenities including the following:

  • A significantly wider sidewalk along Winthrop Avenue between Beachmont Station and the site of the resort.
  • An weather-protected sidewalk along Winthrop Avenue between the primary entrance and exit locations at Beachmont Station to Washburn Avenue. The canopy or arcade should connect directly to the existing MBTA station entrance which already has weather protection.
  • A weather-protected walkway from the edge of the resort property on Washburn Avenue to the main resort entrance.
  • Significant upgrades in wayfinding inside Beachmont Station and along the route to the resort to encourage transit ridership and reinforce the convenient transit access.
  • Upgrades of escalators and elevators inside Beachmont Station to adequately and safely handle greater numbers of riders using transit.
  • Signalization or signage protection for pedestrians crossing Washburn Street on the south side of Winthrop Avenue.

Traffic Mitigation

We are fearful that the project will add a great deal of traffic to an area that cannot handle it easily. Winthrop Avenue and the Revere Beach Parkway are heavily used already. Improvements to the interchange with Route 1 will only add to the use of these streets, which cannot easily accommodate them.

Better access might be provided via Tomesello Way, from Route 1A the Suffolk Downs Racetrack parking areas, which will have greater capacity for storage of vehicles and a more orderly approach to the casino. We think the proponent would be well advised to encourage use of Tomesello Way and the MBTA Blue Line for principal access points into the casino property.

In addition, the parking garage is enormous, suggesting a commitment only to vehicular access. Perhaps the proponent could save some of the construction cost of this garage through the use of thoughtful techniques of encouraging patrons not to drive – perhaps a benefit of some sort that patrons could use on the floor of the casino.

We appreciate your consideration of our comments and look forward to your responses to them.

Please feel free to contact WalkBoston with questions you may have.

Sincerely,

Robert Sloane
Senior Project Manager

Cc Massachusetts Gaming Commission
Mayor Dan Rizzo

Comments on Conte School Renovation

Comments on Conte School Renovation

To: Amanda Chilson, MiM Coordinator, North Berkshire Coalition

From: Stacey Beuttell, WalkBoston

June 28, 2013

Re: Pedestrian issues to be considered in Conte School renovation

Dear Amanda:

Below are some initial thoughts on the site plan for the Conte School renovation. While there are some improvements that we would suggest to make the pedestrian environment safer, the proposed plan does improve the current conditions by replacing the surface parking in front of the school with a new playground. There is also improved separation between the vehicular drop-off zone and the thru-traffic along E. Main Street.

When reading this analysis, please remember that I have not visited the site, nor am I aware of whether or not I am evaluating the most recent site plans (see attached).

Some suggestions to consider:

• Students crossing E. Main Street at the major crossing point must cross two to three additional lanes of traffic in the drop-off zone before reaching the sidewalk nearest the playground area. The design drawings do not show cross walks, speed table, or bulb-outs in the bus and car drop-off areas. Buses and cars must not stop in designated crosswalk.

• Students walking from the north along the east side of E. Main Street must cross the car and bus dropoff zones before entering the school. We would suggest providing sidewalk along the northern edge of the parking lot and an alternative crossing point marked with a crosswalk from northern sidewalk to sidewalk adjacent to the bus drop-off. This crossing point would minimize the number of times these children will cross travel lanes.

• Traffic must be one-way into the school drop-off zone from the northern entrance along E. Main Street.

• Traffic leaving the parking lot should be directed through the drop off zones (at least during peak hours) to minimize potential gridlock and collisions.

• Crossing guards should be considered at all crosswalks adjacent to the school (both vehicular entrances and across the drop-off zones).

Please feel free to contact me with any questions about these suggestions. I look forward to talking with you again soon.

Stacey Beuttell, WalkBoston
Program Director