April 11, 2018

Boston Metropolitan Planning Organization (MPO)
c/o Alexandra Kleyman AICP
TIP Manager
Transportation Building
10 Park Plaza, Suite 2150
Boston, MA 02116

Re: Sullivan Square/Rutherford Avenue Design Project (SS/RA Design Project)

Dear MPO Council and Staff,

WalkBoston has been engaged in and following the planning and design of Sullivan Square/ Rutherford Ave. for many years. The redesign of the streets and roadways for this part of Boston should reflect what the people of Charlestown, Somerville and Everett deserve as a hub for walking and transit, and should create opportunities for the redevelopment of what has long been a neglected, dysfunctional and unsafe auto-­centric wasteland.

We believe that the decisions about designs for both Sullivan Square and Rutherford Avenue should be made based on a thorough review of all of the options available for the roadways. Special attention should be given to providing a primarily at-grade street system with opportunities for at-­grade redevelopment of parcels (that do not require air rights or decks) as this will provide the greatest opportunity to create a sense of place, answer the long-­term transportation needs of this dense urban location, provide for safe mobility for all street users and allow for climate resilient designs.

We write to the MPO to request that funding for the project be deferred in the TIP so that there can be sufficient time for review of the alternatives that have been developed by Northeastern Professor Peter Furth at the request of Charlestown residents. The designs that he has developed provide opportunities to improve pedestrian and bicycle safety, add landscape improvements and enhance development opportunities.

Thank you for your attention to this significant project.

Sincerely,

Wendy Landman
Executive Director

Riverpaths of Everett, Somerville and Medford Walking Map

Riverpaths of Everett, Somerville and Medford Walking Map

The walk begins at the Orange Line Wellington Station. The route is roughly 4 miles and ends at the Orange Line Sullivan Square Station.

The Mystic River gets its name from the Indian word Misi-Tuk for Great Tidal River. In colonial times the settlers saw that the Mystic was deeper than the Charles and water-dependent industry sprang up on its banks. With Boston’s 9 foot tidal range, the tide would run all the way up to the Mystic Lakes. For over 200 years, residents relied on the tide to wash wastes out to sea. The river’s industries left a legacy of a stew of chemicals that settled to the bottom. The original riverbeds were diverted over the centuries for industry, homes and highways. What you see today, both the good and the bad, are the starting points for reclaiming our rivers.

Click for “Riverpaths of Everett, Somerville, Medford Walking Map” PDF



Click for “Riverpaths of Everett, Somerville, and Medford” Walking Map on Google Maps

Lead a Jane’s Walk this May in your neighborhood

Lead a Jane’s Walk this May in your neighborhood

image

Jane’s Walk is happening the first weekend of May (5th-6th-7th).
Last year, 1,000+ walks happened all over the globe!

Think of this as an opportunity to:

  • start a conversation with your neighbors,
  • continue highlighting safety issues that have been identified through initiatives like Boston’s Neighborhood Slow Streets application process
  • get outside and enjoy a weekend in May!

Create your walk idea on Janeswalk.org, or get in touch with us at WalkBoston (contact Brendan!). We’re happy to help you or your neighbors with suggestions, promote your walk, and answer any questions you may have.
We look forward to helping you get out walking!

Edit: We’ll add neighborhoods/cities/towns below that will be hosting walks on this post (and include links to the separate walks within the communities as we find out about them.) 

Boston – West End – “Jane’s Walk West End Tour”
Meet at the West End Museum
Saturday, May 6, 2pm
http://janeswalk.org/united-states/boston/janes-walk-west-end-tour/

Boston – West Roxbury – “West Roxbury Walk Audit”
Meet at the Hastings Street Lot
Saturday, May 6, 2pm
http://janeswalk.org/united-states/boston/west-roxbury-walk-audit/

Boston – Jamaica Plain – “Growing the City: Washington St from Forest Hills to Green St”
Meet at Brassica Kitchen & Cafe
Sunday, May 7, 11am
http://janeswalk.org/united-states/boston/growing-city-washington-st-forest-hills-green-st/

Boston – Roslindale – “Roslindale Gateway Path & proposed Blackwell Path Extension”
Meet at SE corner of the Arboretum (look for Walk UP Roslindale Banner)
Sunday, May 7, 1pm
http://www.walkuproslindale.org/weblog/2017/04/21/janes-walk-planned-sunday-may-7-at-1-pm-start-at-the-southeast-corner-of-the-arboretum/

Cambridge – “The Dense Layers of History in Old Cambridge”
Meet at Out of Town News Kiosk, Harvard Square
Saturday, May 6, 10:30am
http://www.janejacobswalk.org/upcoming-2017-walks/the-dense-layers-of-history-in-old-cambridge

Worcester – Jane Week (May 1 – 7, 2017) gives Worcester residents and visitors a chance to connect to each other, explore Worcester by foot and participate in interesting discussions on how we can enhance the design and function of our city. – 20+ events and walks throughout Worcester.
http://janeswalk.org/united-states/worcester-ma/

Lowell – “Labor Movement in Lowell”
Meet at Lowell National Park Visitor Center, 246 Market St
Saturday, May 6, 10:30am
http://richardhowe.com/event/labor-movement-in-lowell-walk/

Dedham – “Walking Tour of Proposed Dedham Heritage Rail Trail”
Meet at the parking lot by the football field/track on Whiting Ave
Sunday, May 7, 4:00pm
Saturday, May 13, 10:00am
http://mailchi.mp/f20ef35375c4/rail-trail-happenings-this-spring

Somerville – “A Metamorphosis of Industrial Buildings Along the Rails”
Kickoff to Somerville’s Preservation Month, ending at Aeronaut Brewery
Saturday, May 13, 9:30am
http://janeswalk.org/united-states/somerville-ma/meta/

Boston – Jamaica Plain – “Walking Tour of Monument Square”
July 1 & August 19, 12:45pm
http://janeswalk.org/united-states/boston/walking-tour-o/

Comments on Sullivan Square/Rutherford Avenue Design Project 3/31/17

Comments on Sullivan Square/Rutherford Avenue Design Project 3/31/17

March 31, 2017

Deputy Commissioner James Gillooly
Boston Transportation Department, 7th floor
1 City Hall Square
Boston, MA 02201

Re: Sullivan Square/Rutherford Avenue Design Project (SS/RA Design Project)

Dear Deputy Commissioner Gillooly,

WalkBoston has been engaged in and following the planning and design of Sullivan Square/Rutherford Ave. for many years. We have consistently and persistently noted that the redesign of the streets and roadways for this part of Boston should reflect what the people of Charlestown, Somerville and Everett deserve as a hub for walking and transit, and should create opportunities for the redevelopment of what has long been a neglected, dysfunctional and unsafe auto-­centric wasteland.

We strongly believe that an at-­grade street system with opportunities for at-­grade redevelopment of parcels (that do not require air rights or decks) presents the greatest opportunity to create a sense of place, answer the long-­term transportation needs of this dense urban location, provide for safe mobility for all street users and allow for climate resilient designs.

Over the last decade transportation planners and engineers across the United States have come to understand that adding roadway capacity in multi-­‐modal, dense urban environments simply means that more people will drive their cars and fill up the roads. We’ve learned from years of mistakes that building large roads that look and feel like highways through communities encourages high speed traffic, attracts more vehicular traffic and traffic congestion, cuts off parts of neighborhoods.

The roadway, transit and sidewalk network at the heart of the Boston metro area should meet the multi-­‐modal needs appropriate to the land uses and neighborhoods that surround the roadway network. With I-­‐93 directly adjacent to Sullivan Square and Rutherford Avenue, this part of the region already houses a regional road system that serves longer distance travelers.

Slowing traffic down on Rutherford Ave and keeping regional traffic off of local roads will better protect Main St, Bunker Hill St and Medford St. the local streets are 1-­lane in each direction, with parking on both sides, and a number of traffic lights. It is counter-­‐intuitive to think that anyone might navigate off of Rutherford Ave and onto these streets in order to go faster. Waze and other similar tech services will always show drivers the fastest routes – if Rutherford Ave is faster than I-­93, Waze will route even more drivers through Charlestown.

The City’s new plan, Imagine Boston 2030 states the case that WalkBoston is making here: Sullivan Square has the potential to be “a walkable job and housing center with access to quality transit,” and goes on to note that this would require that “strategic infrastructure investment, potentially including open space, would be needed to address congestion and flooding vulnerability in Sullivan Square and nearby areas.”

The many comments that the City will receive about the project will provide both detailed technical and moving personal information about the project and its impacts on the Charlestown community. To put the project in a larger context, WalkBoston has reviewed the City’s plans for transportation (GoBoston 2030), resilience (Climate Ready Boston), and long range planning (Imagine Boston 2030). The table below puts the SS/RA in the context of the goals that these plans set for the City. We believe that the goals clearly point to the surface option as the right choice for the project.

If the City carries both options to further levels of refinement, we ask that several technical assessments be included:

1. Estimated number and severity of total traffic crashes for the entire roadway system from the Mystic River to Austin Street for each mode: pedestrians, bicycles, transit users and vehicles. We believe that the crash statistics cited on page 29 of the 2/28/17 slide show do not represent an accurate picture of the impacts of the project designs on all crashes. (see note below)

2. Measure the total land area devoted to roadway surface and “unbuildable” air rights parcels in each alternative.

3. Measure the longest distances that are not traversable by pedestrians between intersections: (1) from the bank of the Mystic River at Alford Street to the first pedestrian crossing, (2) from northern D Street south toward Baldwin Street), (3) north from Austin Street.

4. Estimate the walking travel time from the corner of Main and Bunker Hill Street to Sullivan Square Station.

5. Provide construction and fifty-­‐year operation/maintenance cost estimates for each proposal.

6. Describe in detail how vehicles using a Rutherford Ave tunnel will be slowed to 25-­‐30 mph when they emerge onto the surface portions of Rutherford Ave.

Let’s not put the design of Sullivan Square/Rutherford Ave on the wrong side of history. We don’t want to build new streets with underpasses that are “relics” before they are built.

Thank you for your consideration.

Best Regards,

Wendy Landman
Executive Director

Cc Chris Osgood, Chief of Streets, Transportation and Sanitation
Commissioner Gina Fiandaca, Boston Transportation Department
William Conroy, Project Manager Boston Transportation Department
Tad Read, Boston Planning and Development Agency
Peter Furth, Northeastern University
Amy Branger, Liz Levin, Emma Rothfeld Yashar, WalkBoston Board members and advocates from Charlestown

Note: Peter Furth provided WalkBoston with the following information about the cited crash statistics. “They are using Highway Safety Manual’s general 42% reduction in crash rate when an at-­‐grade intersection is converted to a grade-­‐separated interchange. It’s obvious, but worth emphasizing: a grade separated interchange is NOT what’s proposed for Sullivan Sq; what’s proposed is a flyunder, akin to a flyover. The HSM has no data on flyover / flyunder conversions. They are making a logical leap by using a reduction that comes from complete grade separation. On the slide they write “*Applies to Underpass Movements Only,” meaning they intend to apply that reduction only to cars who will use the underpass. However, that suggests that a flyunder will leave all the other traffic unaffected. That is not proven (there is no data), and moreover, there are good reasons to expect that crash rate will go *up* for the other traffic. One reason is that the only traffic removed by the flyunder is thru traffic; all the turning traffic, which carries higher crash risk, remains, and furthermore will be concentrated. More importantly, the space required for the flyunder structure forces the at-­‐grade intersection to have an unfavorable geometry, with the left turn lanes that flank the underpass separated from each other in a way that results in interlocking left turns, which are less efficient and (probably) less safe. Nobody would ever lay out an intersection that way if they weren’t constrained by the structure of the flyover / flyunder. That change could have an unfavorable safety effect that erases the gains enjoyed by thru cars that get to bypass the intersection.”

Comment on EENF for The Office and Research Center and the Residences at Assembly

Comment on EENF for The Office and Research Center and the Residences at Assembly

November 23, 2016

Matthew Beaton, Secretary
Executive Office of Energy and Environmental Affairs
Attn: MEPA Office
Analyst: Holly Johnson
100 Cambridge Street, Suite 900
Boston, MA 02114

RE: EENF for The Office and Research Center and the Residences at Assembly – MEPA #15595

Dear Mr. Beaton,

WalkBoston is a 501©(3) non-profit, pedestrian advocacy organization that makes walking safer and easier in Massachusetts. We have reviewed the EENF and offer the comments below.

The Office and Research Center and the Residences at Assembly is located on a 9-acre site at 5 Middlesex Avenue, Somerville, in close walking proximity to Assembly Station and to existing residential areas of East Somerville. It is planned to become an integral feature of the massive developments already taking shape in Assembly Square. Phase 1 of the proposed Project includes a 188-room hotel, and a 147-unit residential building with 6,000 sf of retail space on the ground floor. Later phases will include offices and residential units. The total space to be constructed within the site may reach 2,000,000 sq ft.

We are concerned that the proponent has not offered significant changes to the walking environment, except on its own site. The nearby Kensington Underpass, one of two connections between residential Somerville and the many worksites and attractions, should become its focus for improvements. The proponent has suggested a U-turn that would complicate pedestrian crossings at the underpass. The proponent should be required to develop improvements for pedestrians and vehicles at the underpass in an integrated way.

Recognizing the advantages of being located in the large Assembly Square complex of developments, the proponent notes that walking and bicycling through Assembly Square and on the paths along the Mystic River will be encouraged. The proponent also emphasizes the access provided to the site by public transportation not only at the new Orange Line rapid transit station, but also on bus lines located nearby on Route 38 and on Broadway in East Somerville. Access to public transit gives significant advantages to the proponent’s proposed complex of both office and residential units that can take advantage of the transportation services concentrated in the environs.

The proponent’s plan includes on-site pedestrian facilities and a plaza in the center of the development. The proponent vows that improvements to pedestrian and bicycling facilities will ensure security and comfort for those walking and biking. Part of these improvements will be a significant wayfinding element that will direct site visitors and users toward significant destinations, show walking times, and including public transportation services. The proponent also hopes to link the fabric of this new district to neighboring East Somerville.

The Assembly Square complex has already established pedestrian facilities throughout the property and highlights the riverside park and paths that make up a substantial pedestrian network. The proponent’s site will be able to take advantage of those improvements and link into them at appropriate locations.

The basic link between this site and East Somerville is the neglected underpass of I-93 at Kensington Street, which has not been updated since the construction of the highway. The proponent should take a leading role in the upgrading of this underpass, to bring to life the proponent’s laudable goal of a more appropriate connection into the surrounding community. Improvements to the underpass would bring about:
1. Improved pedestrian connections from East Somerville into the Assembly Square shopping area to reach proliferating new shopping, entertainment and work locations.
2. Improved pedestrian connections from the East Somerville neighborhoods to the new Orange Line rapid transportation station at Assembly Square.
3. A wayfinding network for pedestrians finding their way into and through the complex set of developments at Assembly Square.
4. Improved pedestrian connections both from Assembly Square as well as the East Somerville neighborhoods to the public transportation routes along Route 38, where bus stops are closer than the Assembly Square Orange Line Station.
5. Clear routes for access from Assembly Square to the major grocery store as well as commercial and public sites such as the library along Broadway in East Somerville.
6. A walking route for residents of East Somerville and people in Assembly Square for recreation and healthy daily activities.
7. Implementation of major goals of the City of Somerville’s “Somervision” program which looks to increase active and alternative transportation options, reduce congestion and promote workplace- and business-based policies and incentives to encourage changes in more choice and to expand bike, pedestrian and public transit use.

Improving the Kensington Underpass by itself is insufficient to protect users. The underpass, which connects East Somerville to Assembly Square near the intersection of McGrath Highway, Fellsway, Route 38 and the I-93 southbound onramp, has two at-grade street crossings where pedestrians must cross heavily traveled routes. The two crossings have painted crosswalks and pedestrian-actuated yellow flashing warning lights. More detailed analysis should be undertaken to assess the current levels of safety for people crossing at this location. Projections of future pedestrian traffic should be undertaken to analyze whether what level of additional safety measures might be appropriate.

Of special concern is the proposal by the proponent of this project that there should be a U-turn that would allow traffic from Assembly Square and this project to use the westbound service road along I-93 (called Bailey Road) to reach a point where it could u-turn into the eastbound service road near Route 28 to provide better access from Assembly Square to I-93 southbound. This would, according to the proponent help by “allowing vehicles to bypass two signals, thereby alleviating congestion.”  The U-turn would provide, in essence, a fourth option for exiting the complex and reaching I-93 southbound.

However, with the addition of this U-turn, people trying to cross at the Kensington Underpass crosswalk will always be faced with oncoming traffic at both eastbound and westbound service roads leading into and out of the U-turn. The addition of traffic to the two service roads is a problem for the pedestrians using existing Kensington underpass should be analyzed in terms of any improvements that may be made to increase its use.

Several options might be explored to alleviate this difficulty. One would be to reduce both service roads on either side of I-93 to one lane, so that drivers would not be tempted to bypass a driver who is yielding to a pedestrian in the crosswalk. That option might be sufficient to retain the un-signalized crosswalk.

We appreciate your consideration of our comments.

Best regards,

Bob Sloane
Senior Planner

Brendan Kearney
Communications Manager

————————————————————————————————
Join WalkBoston’s Mailing List to keep up to date on advocacy issues.

Like our work? Support WalkBoston – Donate Now!
Connect with us on Twitter and Facebook