Comments on the Final Environmental Impact Report for the Redevelopment of the Government Center Garage, MEPA #15134

Comments on the Final Environmental Impact Report for the Redevelopment of the Government Center Garage, MEPA #15134

October 24, 2014

Secretary Maeve Vallely Bartlett
Executive Office of Energy and Environmental Affairs (EEA)
Attn: MEPA Office EEA #14069
100 Cambridge St., Suite 900
Boston MA 02114

RE: Comments on the Final Environmental Impact Report for the Redevelopment of the Government Center Garage, MEPA #15134

Dear Secretary Vallely Bartlett:

WalkBoston has reviewed this document to identify potential implications for pedestrians. We offer the following comments.

Sidewalk Widths
The FEIR contains detailed drawings of sidewalk widths at all locations, and WalkBoston believes that the widths are completely adequate, except as noted below at the outer bus bays facing the Greenway. On map B.2 – Conceptual Improvement Plan, Bus Bays #4, 5, and 6 are shown with sidewalks that are only 8.5 feet wide, compared with those of Bus Bays #1, 2, and 3, which have 15 foot sidewalks without encroachments. Bays 4, 5, and 6 also appear to have a line of windbreaks that encroach on the 8.5’ width. No benches are shown, but the text response to our DEIR comments states that, “Additional measures, such as windbreaks and seating areas will also be incorporated into the reconfigured Haymarket Bus Station area.” The relatively narrow sidewalk coupled with windbreaks and potentially benches as well, could make the sidewalk uncomfortably narrow and crowded at Bays 4,5, and 6. We urge the proponent to consider a modest re-distribution of space to provide wider sidewalks at these bus stops.

Truck loading bays
WalkBoston continues to be concerned about loading docks that require trucks to back from the major adjoining streets into the building. Two of these streets are major access ways into Central Artery (I-93) and will require very careful operation to be safe for both pedestrians and other vehicles. Clear and enforced management should stipulate that they will not be used, except in emergencies, during daytime working and peak travel times.

Cut-ins on sidewalks
Cut-ins proposed on three sides of the East Parcel and two sides of the West Parcel should also be managed to reduce conflicts with pedestrians as loading and unloading occurs from vehicles. Management of the site should ensure that use of the cut-ins for deliveries (not for guest or resident drop off) is minimized during busy portions of the day or evening.

Thank you for the opportunity to comment on this important project. Please feel free to contact us if there are any questions.

Sincerely,

Robert Sloane
Senior Planner

Comments on the DEIR for the Redevelopment of the Government Center Garage MEPA #15134

Comments on the DEIR for the Redevelopment of the Government Center Garage MEPA #15134

July 11, 2014

Secretary Maeve Vallely Bartlett
Executive Office of Energy and Environmental Affairs (EEA)
Attn: Holly Johnson
100 Cambridge Street, Suite 900
Boston MA 02114

RE: Comments on the DEIR for the Redevelopment of the Government Center Garage MEPA #15134

Dear Secretary Vallely Bartlett:

WalkBoston reviews significant proposed development projects to provide comments about their impacts on pedestrians, and to suggest measures that may mitigate negative impacts or generally improve the projects for walkers.

We have reviewed the DEIR for the Redevelopment of the Government Center Garage and find exciting aspects of the project that will benefit walkers. These include:

Enhancement of a major pedestrian-transit hub
The East Parcel contains a high-volume transit hub with extensive pedestrian access. Access to the Orange and Green Line Haymarket Station access points will be maintained, as will access to the many MBTA bus services. Some of the difficult pedestrian crossings to the site will be improved by narrowing the width of the New Sudbury Street and thus the length of the crosswalks at its intersection with Congress Street.

The sidewalk through the East Parcel
The new pedestrian connection proposed for this project between Congress Street and Canal Street respects a traditional walking route between Downtown and North Station. This route will see more intensive use over the coming years as the significant developments at North Station and at this site occur, and the proposed design reflects the many circulation activities that are required of this parcel.

A new signalized intersection for Bowker Street
The proposed signalized intersection at New Chardon Street and Bowker Street is a welcome addition for pedestrians. The nearby intersection of New Chardon and Congress Street is skewed in such a way that the crossing is very long and is inconvenient for walkers going to the courthouse across the street. The new crosswalk makes the move much more convenient.

Improvements to on-site parking
As parking ceases to be the principal use of this site, the plan is much less auto-oriented. A reduction of number of available parking spaces reduces vehicles circulating around the site for access. This is accompanied by a reduction in the number of places where vehicles must cross sidewalks, enhancing pedestrian safety. The removal of garage access from New Chardon Street and its potentially busy sidewalks is a major pedestrian benefit of the proposal.

In addition to these project benefits, we also note several issues that need more attention.

Weather protection for walkers
The current garage has the unusual benefit of covering the bus waiting area and access to the transit station below, thus protecting walkers from rain and snow. Removing the garage and opening up the area for new development is beneficial to the project, and we believe that Figure 1.8 shows that the new structure will also provide cover for the bus station area. However, no cover for the subway entrance area is shown. The diagrams are less than clear on this point and we ask the developer to clarify how the bus waiting area and subway entrance areas will be designed and whether they will be covered.

Widths of sidewalks
Pedestrian improvements included in the project will improve safety at crosswalks and along the major streets. A note suggests that the current sidewalks widths are varied throughout the project, and are “rarely less than eight feet wide.” We trust that the standards for future sidewalk widths in this pedestrian-friendly project will be considerably wider and in keeping with the City’s complete street guidelines.

Services provided at the bus station
Six bus stops are proposed in the redesign of the bus station. Three of the stops will be in the area where they are now located, and three stops will be provided by a nominal widening at the side of the Central Artery Surface Road. The design and operation of the bus stops is critical for pedestrian safety and convenience. We ask that the proponent provide detailed diagrams and sketches of how this area will operate and ensure that bus patrons are well served by the new design.

Truck loading bays facing New Chardon Street
New Chardon Street is the major Downtown/North End access to and from the Central Artery (I-93). Four truck loading docks are proposed for the section of New Chardon between Congress Street and the on- and off-ramps leading to the I-93. The site plan suggests that trucks will back into these docks from the street travel lanes across the sidewalk on this side of the East Parcel. Unless use of the docks are restricted to the middle of the night it is difficult to comprehend how trucks backing into place across the sidewalk on a ramp to I-93 can be safely accommodated. We request that the proponent describe this element of the project in detail, including how pedestrian safety will be maintained.

Cut-ins on sidewalks
Cut-ins are proposed on three sides of the East Parcel and two sides of the West Parcel:
1. New Seabury Street near the Surface Artery
2. New Chardon Street near Canal Street
3. New Chardon Street near Bowker Street
4. Congress Street Near New Sudbury Street toward Leverett Circle
5. Congress Street near New Sudbury Street toward State Street

Although not well defined in the DEIR, a cut-in appears to be a pull out lane that reduces the width of the sidewalk to accommodate vehicles. The drawings in the DEIR show these indentations only vaguely but imply that a cut-in is a lane for vehicles separate from the adjacent thoroughfare but parallel to it.

The next stage of development of the project should include details of:

  •  Why the cut-ins are needed in each of the five locations?
  • How they are proposed to be used (back-in, parallel movement, etc.)?
  • How they relate to, or potentially conflict with, all major adjacent pedestrian flows?
  • Design guidelines that include minimum widths for adjacent sidewalks or crosswalks, as well as bollards or other protections for walkers. We are concerned that the sidewalks seem quite narrow adjacent to some of the proposed cut-ins.

We appreciate your consideration of our comments and look forward to your responses to them. Please feel free to contact WalkBoston with questions you may have.

Sincerely,

Wendy Landman                                 Robert Sloane
Executive Director                              Senior Project Manager

Comments on the Design for Commonwealth Avenue Phase 2A

Comments on the Design for Commonwealth Avenue Phase 2A

2 July 2014

Commissioner Jim Gillooly
Boston Department of Transportation
1 City Hall Square, Room 721
Boston, MA 02201-2026

Vice President Robert Donahue
Boston University Government & Community Affairs
121 Bay State Road
Boston, Massachusetts 02215

Re: Design for Commonwealth Avenue Phase 2A

Dear Commissioner Gillooly and Vice President Donahue:

We appreciate you taking the time to meet on Wednesday, June 25 to review the plans and process for Commonwealth Avenue Phase 2A. The redesign is an exciting opportunity to build a model street that will help achieve our collective goals for safety, enhanced user experience, and multi-modal transportation. These goals are in line with mode-shift, climate change, and public health goals set forward in Boston’s Complete Streets Guidelines, Bike Network Plan, and Climate Plan, MassDOT’s goals to triple biking, walking and transit mode share, and the goals set out in the Boston University Master Plan. The project provides a key opportunity to re-build Commonwealth Avenue to protect the needs of the area’s growing population of people who bike and walk, and address the decline of car traffic on the street and in the city.1

Unfortunately, the current designs for the project do not achieve these admirable project goals. Widening street lanes and adding fences encourages cars to move faster, making the street less safe and less comfortable for people. The plan to narrow the already overcrowded sidewalks does not serve the thousands of people who walk on Commonwealth Avenue every day. The current bike lane, which has been the site of many injuries and at least one fatality, is not significantly improved in the design, though there is a clear opportunity here to prevent more tragedies from occurring.

The safety of our community and the student population of Boston University and many other institutions in the area demands that the plans for Commonwealth Avenue Phase 2A be redesigned to protect people and meet the project objectives.

  • Increase the comfort and safety of pedestrians
    o  Minimize sidewalk narrowing to maintain adequate width for pedestrian volumes and allow businesses to maintain outdoor café seating
    o  Make crosswalks and curb ramps as wide as sidewalk walking zones
    o  Minimize tripping hazards from curb ramps, for example at the corner of Pleasant and Commonwealth Ave.
    o  Add curb extensions at all intersections
    o  Time the walk signals to allow for a single-stage crossing of Commonwealth Ave
    o  Make all walk signals automatic
    o  Add a mid-block crosswalk at Alcorn St/Naples Rd
  • Protect people biking and encourage more people to bike
    o  Explore all options to add cycle tracks (protected bike lanes) without narrowing sidewalks
    —   Parking-protected one-way cycle tracks
    —  Center-lane one-way cycle tracks (similar to those used on Commonwealth Ave in the Back Bay)
    o  Add bike boxes at intersections (traditional and two-stage turn queue boxes for those waiting to turn left)
    o Incorporate bike signals and leading bicycle phasing at intersections
  • Keep transit moving
    o  Add transit signal priority for Green Line trains and buses
    o  Add curb extensions at bus stops
  • Design for safe and steady traffic speeds
    o  Green Wave: coordinate traffic signals to bike speed (15 MPH)
    o  Make all travel lanes no wider than 10.5’ (MassDOT regularly approves this)

We understand that project funding depends on final designs by FY15. However, funding a design that does not meet the objectives of the City, the University, or Boston citizens is not a win for anyone and public controversy slows the process more than would design changes.

These designs have not had a true public process; LivableStreets Alliance, MassBike, and many other advocates and citizens submitted comments at the 25% design meetings, but heard no response and received no follow up information on the project. To redesign such an important and heavily-used street without an inclusive process is contrary to the City’s guidelines and goals.

We urge the City to engage in an inclusive public process to move plans from 25% to 100% design in order to build a street that we can all support. Past projects (including Connect Historic Boston) illustrate that the City can develop 0 to 100% design plans in less than a year.

We ask you to please respond to this letter by Wednesday, July 9, 2014 to let us know how you intend to address these concerns.

Sincerely,

Jamie Maier
Campaign Coordinator, LivableStreets Alliance

Pete Stidman
Executive Director, Boston Cyclists Union

David Watson
Executive Director, MassBike

Wendy Landman
Executive Director, WalkBoston

 

CC:
Nicole Freedman, Boston Bikes
Mike Wasielewski, BETA
Merrick Turner, BETA
Bill Conroy, Boston Transportation Department
Michelle Consalvo, Boston University
Ken Ryan, Boston University
Bill Egan, Boston Public Works Department

Attachments:

  • Comment Letter on Design for Commonwealth Avenue Phase2A
  • Marked up plans for Commonwealth Avenue Phase2A
  • Photo example of curb ramp/crosswalk as wide as sidewalk to meet high volumes
  • Photo example of cycle track
  • Bike Network Plan

Other Materials


Footnotes

 

Bike use has increased as much as 135% since 2007, pedestrian volumes have increased 80% since 2001, and car volumes have decreased as much as 31% since 1987 in the project area, according to the Boston University Master Plan (sections 8.5.1-8.5.6)

Comments on Plans for the Connect Historic Boston project

Comments on Plans for the Connect Historic Boston project

March 12, 2014

William R. Egan, PE
Chief Civil Engineer
Boston Department of Public Works
Boston City Hall, Room 714
Boston MA 02201

RE: Comments on the current plans for the Connect Historic Boston project

Dear Mr. Egan:

WalkBoston has reviewed the most recent plans for the four projects within the Connect Historic Boston program – Commercial Street, Union Street (and the Blackstone Block), Joy Street and Causeway Street). We offer the comments below.

Commercial Street
Of the four projects, we feel that this project does not seriously affect walkers. The Commercial Street project has been carefully designed to incorporate cycle tracks into the existing street layout without affecting pedestrian access or sidewalk availability. We note that the current design provides visual and physical separation between bicycles and pedestrians along the new cycle track/sidewalk proposed on the harbor side of Commercial Street.

Union Street/Blackstone Block
The proposed improvements on Union Street appear excessively vehicle oriented. The proposed sidewalk along the Blackstone Block side of Union Street is intended to encourage pedestrianism and sidewalk cafes, but does not appear to have enough space to accomplish both goals. Thus pedestrians will be walking in the raised street with vehicles. This suggests the need for a very low speed limit on this block (5-10 mph).

The space being devoted to parking could be incorporated into the raised and combined street/sidewalk and used only by pedestrians. Movement by vehicles would not be impeded by enlarging the area intended for pedestrians. One lane should be sufficient for the vehicles that would use this street in the future, and would serve emergency vehicles, and not general traffic. Loading for adjacent businesses might be accommodated in a time-based method, such as that used in the Downtown Crossing shared streets – Washington, Winter and Summer.

The sharing of Union Street between vehicles and pedestrians should be reflected in signage. The shared street area should be signed as a ‘Shared Street” at the entrance to the street with a speed limit of 5-10 mph. Drivers are not being deprived of movement through the area, because they have an alternative parallel street – Congress Street – which is very close. The speed limit should also reflect that this area, bounded by historic buildings and a park, is a prime tourist district, where walkers may not be aware that vehicles are likely to be alongside as they walk from the park to Union Street businesses.

Joy Street
Joy Street is also to become a shared street, with the street raised to sidewalk level. Streetsharing by vehicles and pedestrians requires appropriate signage at the entrance to this street, such as a ‘Shared Street” sign with an accompanying speed limit of 5-10 mph. This is especially important in this densely settled residential area, where Joy Street is often used as a vehicular cut-through street from Beacon Street to Cambridge Street.

Causeway Street
Raised street crossings for pedestrians at the intersections of Canal and Haverhill Streets had long been a part of the planning. We think that their removal is a serious mistake for pedestrian safety. Thus, we offer other suggestions that might be incorporated into the plan to improve safety for walkers. These include:

  •  A right turn lane at Canal and Causeway Streets
    The potential for drivers leaving Canal Street northbound and turning left onto Canal Street appears difficult to resolve. To avoid this issue, 3” bumps in the center of the Intersection of Canal and Causeway have been proposed. We feel these bumps are potential tripping hazards for the walkers who will surge across this intersection during morning and evening commuter rail commuting times and before and after major events at the TD Garden. In large groups of people, many will simply not see the bumps and may fall on encountering them.

Another way to prevent left turns is to change the street geometry. A very tight, single lane right turn lane could be provided to direct northbound traffic onto Causeway Street. A bulbout on the west side of the Canal Street intersection where it meets the sidewalk could divert all vehicles to the right, and could include a rollover curb to permit fire engines to make the left turn in emergencies.

 

  •  Level crossing on sidewalks on each of the side streets
    All of the side street pedestrian crossings along Causeway should be raised to sidewalk level at the entrance to intersections. This would help to reduce speeds and assist in warning drivers to make only safe and permitted movements. A level crossing could be combined with the right turn lane suggested for the Canal Street crossing.

 

  • Canal Street intersection striped from corner to corner
    The volume of pedestrians crossing the Canal Street intersection is one of the largest in the city. Surge traffic from commuters and the attendees of TD Garden events suggests that the intersection needs significant protection for pedestrians. We urge the painting of the entire intersection (curb-to-curb in both directions) to indicate that pedestrians may cross safely anywhere within the intersection. Within this ultra-wide zebra crossing, a modification could be made by painting with a different color the route of the cycle track within the intersection.

 

  • Elimination of right turn on red at all Causeway Street intersections
    It is appropriate to have vehicular traffic in all directions stopped to permit walkers to cross safely and to prohibit any kinds of turning movements that might infringe on walking movements. For example, at Canal Street, forbidding right turns during pedestrian crossing cycles would help protect walkers.

 

  • Wider crosswalk between T station entrances on Haverhill Street
    The crosswalks on Causeway Street at Haverhill Street connect directly on both ends to subway access points. This crosswalk has the potential of attracting numerous pedestrians. The crosswalks should be enlarged beyond the standard widths to accommodate surge flows. • Cobble warnings Cobbles or other rough paving should be placed on the approaches to both the Canal Street intersection and the Haverhill Street intersection to warn drivers of pedestrian concentrations ahead. The cobble warnings should be supplemented with signs indicating that pedestrian crossings are ahead.

 

  • 20 mph speed zone
    The frontage along Causeway Street is about to become even more intensely used than at present. In addition to the rail commuters and event attendees, a very large development with millions of square feet and many new residents and workers is to be placed between the Garden and the front of the property. This intensely developed area will increase the pedestrian concentration at all intersections, but principally at the Canal Street crossing. Because of the many modes of transportation and the concentration of pedestrians at this location, the speed limit should be made a cautious 20 mph on Causeway Street for the safety of all.

We appreciate your consideration of our comments and look forward to your responses to them. Please feel free to contact WalkBoston with questions you may have.

Sincerely,

Robert Sloane
Senior Project Manager

Comments on the DEIR for The Boston Garden, MEPA #15052

Comments on the DEIR for The Boston Garden, MEPA #15052

November 8, 2013

Secretary Richard K. Sullivan, Jr.
Executive Office of Energy and Environmental Affairs (EEA)
Attn: Alex Strysky
100 Cambridge Street, Suite 900
Boston MA 02114

Commissioner Thomas Tinlin
Boston Transportation Department
One City Hall Plaza
Boston, MA 02201

RE: Comments on the DEIR for The Boston Garden, MEPA #15052

Dear Secretary Sullivan and Commissioner Tinlin:

WalkBoston has reviewed the DEIR for the Boston Garden project. The proposal will improve the second largest pedestrian, transit and commuter rail interchange locations in the city. From WalkBoston’s perspective, one of project’s key challenges is handling the many daily pedestrian trips generated by subway and commuter rail riders, on-site workers and residents, and the large crowds generated by the TD Garden Arena.

The design of the 2.8 acre site includes a large office building, a hotel and a substantial residential building, comprising 1,870,000 square feet of new structure. The basement and first two levels of the building are predominantly retail. A lower level garage expands the existing below-grade parking facility by 800 spaces, for a total of 2075 in the complex.

The magnitude and importance of pedestrian access has prompted a number of comments and questions about the ways in which the proposed plan meets the needs of walkers both to and within the site. It is very important to distinguish between the site design, which is under the control of the developer, and the design of Causeway Street, which is under the control of the City. We believe that these two components must be designed to work well together, and our comments address both areas because it is not possible to separate them from a pedestrian perspective. For that reason we have addressed our comment letter to both MEPA and the City of Boston Transportation Department.

CONFUSION ABOUT PEDESTRIAN CROSSINGS OF CAUSEWAY STREET

The DEIR includes a design for Causeway Street that has been superseded because of the City’s receipt of a federal TIGER grant that will pay for the reconstruction of the street. As described to WalkBoston by several City staff members, the designs shown in the document are currently being modified by the City to incorporate cycle tracks instead of bicycle lanes and to possibly alter original alignments of lanes on the street. New designs will change the approved 25% design drawings for all pedestrian crossings on Causeway Street, and for vehicular accommodations on the street as well. The details of the proposed changes have not yet been shared, and WalkBoston will actively participate in review of the new design once it is  presented. Rather than provide comments on the current design we have focused this letter on suggestions about elements we would like to see in the new design.

MAJOR PEDESTRIAN ISSUES

1. Projected pedestrian volumes into and out of the site exceed vehicular volumes.
The number of people who currently enter the rail and arena adjacent to the site is impressive. Per the MBTA Blue Book, there are 26,763 weekday commuter rail boardings at North Station, and 16,702 weekday entries into the Green and Orange Lines. In addition many more people use the transit lines, streets and sidewalks when an event is scheduled in the 19,000 seat TD Garden. North Station is the 2nd busiest transit station in the MBTA system (exceeded only by South Station). Causeway Street carried 14,800 vehicles per day in 2009, according to MassDOT.

2. Pedestrian crossings of Causeway Street are one of the most important issues to be explored.

a. Canal Street is the major pedestrian approach to the site.
Reflecting the significant anticipated growth in transit and pedestrian trips, a new pedestrian entrance to both the rail station concourse and the TD Garden is planned for the location where pedestrians will cross Causeway Street from Canal Street. Historically Canal Street served as the pedestrian route to North Station from the Downtown financial and retail districts, and in the planned design it will regain that prominence (Fig. 1-14.)
Walking along Canal Street is fostered by wide sidewalks and by the street’s slow speed, narrow travel lanes, corner bulb-outs and traffic signal designs. Pedestrians are encouraged to follow a walking route along Congress Street from the financial district and up Canal Street to North Station.
Retail property uses along the frontage of Canal Street have also changed over time and it now includes many uses catering to people attending sports events including bars and restaurants with large outdoor seating areas.
The private and public expenditures on Canal Street have emphasized it as the primary walking route, thus leaving Friend, Portland and Haverhill Streets much less used by walkers.

b. The design of the Canal Street entrance emphasizes its importance
“Champions Way,” is the grand entrance into the project from Causeway Street – directly aligned with Canal Street. It is approximately 50’ x 200’ (10,000 square feet), sized to handle large numbers of people accessing the site and lined with retail facilities to attract walkers. (Nothing of this nature is proposed for either the Friend Street or Haverhill Street approaches.)
About half of Champions Way will be open to the sky, and at the far end, near the rail concourse, is a ‘mixing bowl,’ where the entrance is divided into three parts leading to the Commuter Rail Station, the second-floor TD Garden and the below grade North Station subway station.
Interestingly, the proposed Champions Way has roughly the same dimensions as the Channel Gardens/Promenade leading into New York’s Rockefeller Center. The New York example spreads out into wide sidewalks at either end of the Promenade; here, that would be somewhat comparable to the wide sidewalk along Causeway Street and the expanse of the rail station concourse at the opposite end of the entrance court.
Other local comparisons are also apt. The Canal Street entrance is about one-half the length and roughly the same width as Yawkey Way, used as a pedestrian street for access to the 40,000-seat Fenway Park. South Station’s main entrance has roughly 6,500 square feet divided into two walkways and a row of escalators and small shops. The South Station vestibule also connects with relatively large open areas on both ends, a triangle of sidewalk in front of the station is about 9,300 square feet and a plaza for pedestrians on the opposite side of the street is an additional 17,500 square feet.

c. The new entrance to the site is more than a replacement of existing site entrances.
Walkers currently enter the TD Garden and rail station concourse via east doors facing the sidewalk along Legends Way and west doors facing the O’Neill Building path. This layout is reflected in current pedestrian access patterns with existing peak hour pedestrian traffic heaviest where Friend Street crosses Causeway Street, as commuters walk toward the western doors. The same pattern does not exist at the intersection of Haverhill and Causeway Streets, perhaps because walkers heading to the east entrance use the MBTA’s underground passage beneath Haverhill Street. Once the proposed new development is in place, the importance of the east and west entrances will diminish significantly and the new entrance at Canal Street will be the focus.

3. Projections of pedestrian activity on parallel streets do not seem to reflect the current design. Causeway Street intersects with four streets in front of the project site – Portland, Friend, Canal and Haverhill, and the distance between the streets is quite narrow. The intersections of Portland, Friend and Canal are three-way, and Haverhill St. is a four-way intersection. All have at least one crosswalk, and there are signals at Haverhill and Portland Streets. A brief analysis of each street is useful to explore their role in the pedestrian network leading to North Station. As noted above, Canal Street is the primary pedestrian route and the other streets have narrower sidewalks, fewer retail outlets catering to Garden event patrons, and more parking lots that reduce the quality of the pedestrian experience.

  • Portland Street, slightly west of the project site, serves relatively few pedestrians. Most walkers on this street may be heading toward the O’Neill Federal Building at the corner of Causeway and Merrimac Streets, and some may be heading toward the west entrance to the TD Garden and the rail station concourse, although the walking route is not direct.
  • Friend Street provided a more direct route to the west entrance of the TD Garden/Rail Station, but it crosses Causeway Street at a location that does not align with the O’Neill Building pathway, and the existing diagonal path across the project site will disappear with the new development.
  • Haverhill Street provides access to the Orange Line/Green Line station, and both sides of this 2-block street have been recently developed with large apartment buildings. However, many loading zones for the new buildings and vehicular entrances make the street less pedestrian-friendly than Canal Street.

4. Pedestrian volume projections may need re-examination.
Existing and projected pedestrian volumes for the four street crossings are provided in the document. Existing pedestrian volumes are highest in the weekday AM peak hour at Portland Street which would seem to stem from Commuter Rail passengers walking from North Station, exiting via the west door and walking toward downtown.
In future projections for the 2017 Phase I development, all pedestrian movements grow, but the largest growth is projected for Friend and Haverhill Sts. which lead only to the east and west entrances to the building. Canal Street traffic grows somewhat, but Haverhill Street projections for the AM peak hour grow to be 10 times larger than the existing pedestrian  movement at that intersection. It is unclear if these volumes reflect a route using Haverhill Street’s underpass beneath Causeway St. and the sidewalk along Legends’ Way leading to the east doors of the rail station and the TD Garden. It seems unlikely that such high volumes could cross Causeway St. safely at grade.
For the 2028 full-build, pedestrian volumes grow again, but the pattern is difficult to understand: pedestrian numbers increase substantially at both Friend and Haverhill Sts., but change very little for Canal Street, despite the design’s clear emphasis on the new entrance focused on the traditional walking path from Downtown to North Station.
By contrast, vehicular traffic through the four intersections changes very little from existing levels, declines slightly for the 2017 Phase I, and rises again for the 2028 full-build.
We are puzzled by the projections and request that the proponent describe the volumes and their projected locations in detail.

5. The traffic signal program for Causeway Street needs re-examination.
If this development is to focus its principal entrance on Canal Street, and pedestrian traffic at that location is to increase, the intersection of Causeway and Canal Streets must be signalized for pedestrian safety. The DEIR deliberately fosters jaywalking at both Canal and Friend Streets: a logic of unsignalized intersections is stated in the report: “The unsignalized crossings of Causeway Street at both Friend Street and Canal Street operate at a pedestrian LOS F during the peak hours independent of the full build-out of the Project. Again, under actual operating conditions, pedestrians cross these locations in a platoon when a gap in traffic is afforded in at least one direction on Causeway Street thereby resulting in less pedestrian delay than predicted by the analysis model.”(DEIR page ES-7; pages 3-2 & 3-4; table ES-4)

PROPOSED SOLUTIONS
WalkBoston is excited about the pedestrian service this project will provide. To make the project more appealing and safe for walkers, we suggest the following steps that would more clearly recognize the important role of pedestrians in accessing this site:

THE CAUSEWAY STREET FRONTAGE OF THE SITE

1. Propose a hierarchy of pedestrian crossings on Causeway Street. Canal Street will be the most important pedestrian crossing of Causeway Street (on ground level) based on this design. Haverhill Street is the most important pedestrian crossing of Causeway Street (that passes underground) based on this design. Friend and Portland Sts. will be relatively lowvolume pedestrian crossings.
2. Think of Canal and Haverhill Sts. (and possibly Friend St. as one intersection to aid in finding pedestrian solutions. The block front distance between Haverhill Street and Canal Street is manageably short (about 120 feet). Friend St. is a bit further away from Canal St.
3. Signalize Canal/Haverhill Street at Causeway Street as a single coordinated traffic intersection. Portland St. could also readily be signalized. Friend St. does not necessarily need a traffic signal, if alternative pedestrian crossing locations can be encouraged and if sidewalk and street crossing designs discourage pedestrians from crossing at this location.
4. Build a level pedestrian crossing table for this intersection to slow traffic from both directions. The table should extend a total of at least 200’ from the MBTA headhouse area at Haverhill and Causeway Sts. to the west side of the intersection of Canal and Causeway Sts.
5. Try to attach Friend Street to this raised crossing, recognizing there will be some difficulties. Canal, Friend and Haverhill Sts. constitute the majority of pedestrian crossings 5 on Causeway St. and thus may be considered as a single unified crossing location. Friend Street might be included in the raised table, but issues arise. First, extending the platform to Friend Street doubles its length, potentially leading to the use of the street for storage of vehicles at signals that may interfere with large-volume pedestrian crossings. Second, an additional signal at Friend St. so close to the Canal/Haverhill signals complicates the vehicular signal patterns for the whole street. Third, much of the proposed truck service traffic into the site is located at a door between Friend and Canal Streets, perhaps causing conflicts with surface gradients of the proposed raised platform and adding turning movements into a pedestrian facility. Entrances and exits into this truck service area should take place only from westbound Causeway Street – thus, no left turns for eastbound access.
6. Permit no left turns to or from Causeway Street. Both Causeway Street westbound and Haverhill Street northbound can become vehicular entrances into the site’s parking garage, but exiting traffic from this ramp should only be permitted to turn left to find its way to the Central Artery or Keaney Square. Traffic exiting here and wanting to turn right should be encouraged to use the existing exit ramps at the rear of the building, where Nashua Street provides direct access to Storrow Drive, Route 28, and the entrances to the Central Artery bridge and tunnels.
7. Design the cycle track proposed for Causeway St. to minimize impacts on pedestrians. The alignment of cycle tracks should not interfere with pedestrian movement. Cycle tracks could be located in space where landscaping is proposed. Cycle tracks should be located together so that pedestrians know where to expect bicycles. Pedestrians should be informed of the existence of the cycle tracks through a combination of eye-level signs and painted warnings on the pavement. Bicycle signals and signs in both directions should be installed to warn of pedestrian crossings. Bicycles waiting for signals and thus stored on the raised pedestrian platform should be minimized. Curbing along the cycle track should disappear at the raised pedestrian platform at Canal/Haverhill Sts. to avoid mishaps and to comply with ADA regulations.
8. Design lanes for movement on Causeway St. carefully. Preliminary designs indicate four 10.5’ vehicular lanes, a 5’ cycle track in each direction (possibly combined), a median strip of 6’ located between the two cycle tracks, and restrictions on existing turning movements at both Canal and Friend Streets.

WITHIN THE SITE

1. Reflect by design the number of pedestrian movements anticipated in Champions Way.
Where Champions Way meets the entrances to the TD Garden and the rail station concourse, pedestrians will be passing through between:
•    The Green and Orange Line subway stations and the Commuter Rail Station
•    The Commuter Rail Station and TD Boston Garden
•    The Green and Orange Line subway stations and TD Boston Garden
•    Canal St. and the Commuter Rail Station
•    Canal St. and TD Boston Garden
We are concerned about the dimensions of this complex entrance and especially the ‘mixing bowl’ near the entrance to the TD Garden and suggest a detailed analysis to explain its ability to fully, conveniently and safely handle the many pedestrian demands to be placed on it.
2. Reconsider the dimensions of the MBTA underground passageway between the ‘mixing bowl’ and the subway station to maximize pedestrian convenience, safety and service. It  has a 90-degree turn at one location, along with an inconsistent width progressing through the site. Additional width may be essential at the 90-degree turn. The queue of pedestrians at the bottom of the escalators should have adequate space for waiting.
3. Add a stairway inside the ‘mixing bowl’ to avoid overcrowding of the escalator and elevators. A stairway would also offer an opportunity for people to exercise during their on-site walk from the subway to the Garden or the commuter rail concourse.
4. Provide generous space for pedestrian circulation in and around the first floor at Champions Way.
The DEIR design has two escalators, two stairways (leading upward only) and two elevators (leading downward only.) Space is provided on both sides for people walking through between Canal Street and the rail station concourse. It is important that these facilities and spaces are matched closely to anticipated pedestrian traffic. It may also be important to look forward to future pedestrian traffic to be certain that the spaces and facilities are able to handle projected demand. For example, escalator redundancy may be a consideration to assure that pedestrian traffic moves without impediments.

BEHIND THE SITE

1. Commit to financial aid for the construction of the Charles River Southbank
pedestrian/bicycle bridge over the MBTA tracks.
This proposal has been on the agenda for a considerable time. It has been proposed to complete the various pedestrian/bicycle projects along the Charles River in the vicinity of North Station. It will benefit all of the users on the South Bank of the river, and will aid non-motorized traffic to reach the site of this project.

WAYFINDING
1. Signs and other indications of routings for pedestrians should be provided to aid walkers and to direct pedestrian traffic to certain entry points.

We appreciate your consideration of our comments and look forward to your responses to them. Please feel free to contact WalkBoston with questions you may have.

Sincerely,

Robert Sloane                                          Wendy Landman
Senior Project Manager                         Executive Director