Tag: ENF

Renaissance Village Comment Letter

Renaissance Village Comment Letter

WalkBoston appreciates the opportunity to provide comments on the Environmental Notification Form (ENF) for the Renaissance Village project in Brockton. The project is a 40-R mixed use project of 6 stories, including 308 residential units, commercial and retail space, and a 460-space parking garage.

The project is located in an urban setting that occupies one full city block of downtown Brockton. It is readily accessible on foot to the Brockton commuter rail station, one of three serving the city. It will be a good addition to the city by helping to establish downtown as a place to live as well as work or shop.

Read the full letter here:
WalkBoston-CommentENF-RenaissanceVillage-Brockton

Environmental Notification Form (ENF) Alewife Brook Greenway MEPA #14431

Environmental Notification Form (ENF) Alewife Brook Greenway MEPA #14431

June 29, 2009

Secretary Ian Bowles
Executive Office of Energy and Environmental Affairs 100 Cambridge Street, Suite 900
Boston, MA 02114

RE: Environmental Notification Form (ENF) Alewife Brook Greenway
MEPA # 14431

Dear Secretary Bowles:

WalkBoston is pleased to review the Alewife Brook Greenway Environmental Notification Form (ENF). We have found the proposal extremely interesting, as it expands the off-road network of trails and walkways that are so important to metro arearesidents for transportation and recreation. The ENF details improvements that will be made for both pedestrians and bicyclists on a corridor between Alewife Brook MBTA Station and the Mystic Valley Parkway that leads through Cambridge, Somerville and Arlington, and has connections to the Minuteman Pathway, the Linear Park/Community Path route into Somerville, the Mystic River parklands and future paths into Belmont and Watertown.

This is an extremely important piece of the regional trail network. We are happy to endorse its construction and even happier to realize that it may be constructed relatively rapidly as part of the national stimulus construction agenda.

In our review, we noted a few concerns of importance to pedestrians:

1. The proposed network does not provide for fully separated bicycle and pedestrian paths.
In two segments of the proposed improvement (1. Between the Mystic Valley Parkway and Broadway; and 2. between Henderson Street and Massachusetts Avenue) there appears to be a partial separation of bicycle and pedestrian paths. By contrast, there is only a single path between Broadway and Henderson Street and between Massachusetts Avenue and the MBTA Alewife Station. This will result in an effective capacity of two 10’-wide paths in the areas of separated paths and only one 10’-wide path in the other parts of the corridor. We are concerned about the safety of pedestrians in portions of the corridor where the capacity is limited. In those areas, consideration should be given to a wider cross-section on the path to accommodate potential demand.

2. The proposal does not indicate whether there will be signage to can foster safe walking. Pedestrian safety in mixed walking and cycling traffic can be an issue of concern, depending on the volume of traffic that uses the paths. While we would prefer separate facilities that are clearly designated as such, it does not appear to be feasible throughout the entire corridor. We therefore suggest that signing and warnings be provided to make the route safe for all users. This might include, for example:

  • Lane separation lines for the north and south directions.
  • Signs warning pedestrians to stay to the right of the path.
  • Signs advising cyclists to ring a warning bell as they approach pedestrians from behind.
  • Route signs designating a cyclist trail along the paths that abut Alewife Brooke Parkway.

3. The Boardwalk parallel to Alewife Brook Parkway has the potential for becoming a bottleneck, as it accommodates all path traffic in a narrow corridor. The boardwalk overlooks and is cantilevered over the river in the section extending north of Henderson Street and is one of the most accessible portions of the pathways for nearby residents. It is also close to Dilboy Field, which has occasional special sports events. If the boardwalk accommodates both pedestrians and cyclists and is closely fenced on both sides, it has the potential for becoming heavily used and potentially unsafe for people on foot. Would it be possible to widen the boardwalk to at least 12 feet in this location?

4. Seating and observation areas should be maximized.The path promises to be a very pleasant route. Many people will want to sit occasionally along the route, and children, among others, will be interested in closely examining the stream.

5. For the security of people who are using the path lighting may be appropriate. Lighting of the paths would extend their usefulness to walkers and cyclists in evening hours and in fall and winter.

6. Crosswalks may be needed in several locations. Near the Dilboy Park baseball diamonds, a fence opening and curb ramp have been provided that appear designed to help people cross Alewife Brook Parkway. The addition of a crosswalk in this location would be appropriate. Other crosswalks should be examined to cross Alewife Brook Parkway at Massachusetts Avenue, at Matignon Road, at Powder House Boulevard (two curb ramps), and at Broadway. For continuity of the path network, a Mystic Valley Parkway crosswalk should be considered at the north end of this project.

Thank you for giving us the opportunity to provide comments on the ENF. Please let us know if you have any questions or need further detail.

Sincerely,

Wendy Landman
Executive Director

Robert Sloane
Senior Planner

Cc Dan Driscoll, DCR Bicycle and Pedestrian Planner

First Herring Brook Pedestrian Bridge Comment Letter

First Herring Brook Pedestrian Bridge Comment Letter

We appreciate the opportunity to comment on the ENF for the First Herring Brook Pedestrian Bridge in Scituate. The ENF documents the Town’s plan to construct a pedestrian bridge at the site of a former railroad crossing of a tidal stream. The bridge is part of a walking path called the Driftway Trail, a roadside route from Scituate Harbor along Jericho Road, Front Street, and Kent Street/New Kent Street to Driftway/New Driftway Road. The trail will extend to a point across the street from the new location of the Greenbush Station of the MBTA’s commuter rail line on New Driftway Road. At that location, the trail turns into the former railroad right-of-way through the tidal marshes to the North River, the border between Scituate and Marshfield.

Read the full letter:
WalkBoston-CommentENF-FirstHerringBrookPedestrianBridge-Somerville

Lynn Harbor Line Relocation Comment Letter

Lynn Harbor Line Relocation Comment Letter

July 29, 2008

Secretary Ian Bowles
Executive Office of Energy and Environmental Affairs
100 Cambridge Street, Suite 900
Boston, MA 02114

RE: Environmental Notification Form (ENF) Lynn Harbor Line Relocation
MEPA # 14278

Dear Mr. Bowles:

WalkBoston has reviewed the ENF for the Lynn Harbor Line Relocation, which proposes the relocation of an electrical transmission line from its current route along the edge of the harbor, to a route at some distance inland. As the Commonwealth’s leading advocate for pedestrians and safe walking, with a responsibility to note projects that may affect large groups of pedestrians, we think this project may have significant and exciting potential for the City of Lynn and the state.

When this project removes the existing electric power transmission line directly abutting Lynn Harbor, the relocation will release the existing right-of-way at the edge of the harbor for potential reuse as a path or trail. The relocated power line, approximately a mile long, will be on a new right of way significantly distant from the present alignment.

In the short term, the existing right-of-way can be useful as a walkway/bikepath along the harbor. Over the long term, links could be made between this path and the existing Lynn Shore Drive waterfront paths (extending north) and the Rice Avenue/Revere Beach Parkway beach frontage in the Point of Pines section of Revere (to the south). In addition, the Bike to the Sea project, which is part of the long-distance East Coast Greenway, might also be connected to the seafront paths, as its alignment along a former rail line extends nearly into the harbor district.

Thank you for the opportunity to comment on this ENF. Please feel free to call if you have any questions.

Sincerely,

Wendy Landman
Executive Director

Cc: Jim Cowdell, Executive Director, Lynn EDIC

Commonwealth Avenue Phase 3 Landscape Improvements Comment Letter

Commonwealth Avenue Phase 3 Landscape Improvements Comment Letter

July 15, 2008

Secretary Ian Bowles
Executive Office of Energy and Environmental Affairs
100 Cambridge Street, Suite 900
Boston, MA 02114

RE: Environmental Notification Form (ENF)
Commonwealth Avenue Phase 3 Landscape Improvements
Newton, MA
MEPA # 14269

Dear Mr. Bowles:

We have reviewed the ENF for the Commonwealth Avenue Phase 3 Landscape Improvements in Newton. We are pleased that walking and pedestrian facilities are major organizing features of the development. We are commenting because details of this worthy project may need further analysis to serve the needs of pedestrians safely and comfortably.

WalkBoston is the Commonwealth’s leading advocate for pedestrians and safe walking. We work throughout the state encouraging walking, advocating for pedestrian improvements and working for design improvements. We have extensive experience helping residents and local government with pedestrian issues, safe routes to school, and safer street crossings.

In the case of the Commonwealth Avenue project, we commend the emphasis on rationalized pedestrian crossings of both the boulevard and the carriageway.

We noted that proposed crossings of the carriageway call for granite pavers of various sizes. Granite pavers have a relatively long history of use in Massachusetts, but do not provide a crosswalk surface that is a benefit for all types of pedestrians. These pavers raise specific questions:

1. Granite pavers cause difficulties for wheeled vehicles of any kind, such as wheelchairs and baby carriages because of the rough surface and cracks between pavers. For others, the surface and the cracks between pavers pose difficulties for, among others, disabled persons or those wearing high-heeled shoes.

2. Over time, granite pavers settle or break under vehicular traffic, frequently in an irregular, causing an unintended roughness in surface and specific hazards where pavers go missing or are destroyed.

3. Maintenance of the pavers is an issue that occurs regularly, Despite offers of continued care, budgetary difficulties and agency staffing problems can confound the best intentions over time. Without proper maintenance, granite pavers can rapidly become hazards for walkers.

4. A somewhat separate issue is pedestrian safety in the face of oncoming traffic. Granite pavers are not always visible to motorists in the same way the painted crosswalks are. The reduced visibility of the pavers may require supplementary signing and pavement painting. With many if not all of the curbs to be reset along this portion of Commonwealth Avenue, pedestrian needs should be included. For example, many of the existing curb radii at intersections are being increased to provide for more smooth passage of vehicles. If traffic moves faster as a result, pedestrians may be in danger at these intersections. In some instances this also results in numerous islands for pedestrians to negotiate along circuitous paths across a single street.

Signage for the project seems to avoid mention of the presence of pedestrians and the need for motorists to respect the rights of people on foot. The few “Pedestrian” signs are to be removed and destroyed, as are the few “Children” signs and the “Speed Limit 30” signs – all of which are designed to provide for pedestrian safety. It is difficult to believe that there are no plans to replace the pedestrian warning signs on this 21st century project.

Thank you for this opportunity to comment on the Commonwealth Avenue project. Please feel free to contact us if further questions arise.

Sincerely,

Wendy Landman
Executive Director