Government Center Garage Redevelopment Environmental Notification Form EOEA #15134

Government Center Garage Redevelopment Environmental Notification Form EOEA #15134

February 7, 2014

Secretary Richard K. Sullivan, Jr.
Executive Office of Energy and Environmental Affairs (EEA)
100 Cambridge Street, Suite 900
Boston MA 02114

RE: Comments on the Government Center Garage Redevelopment Environmental Notification Form (ENF)

EOEA #15134

Dear Secretary Sullivan,

WalkBoston appreciates the opportunity to provide comments on the Environmental Notification Form (ENF) for the Government Center Garage Redevelopment.

The proposal calls for partial demolition of the underutilized Government Center Garage as an early action, with subsequent demolition and redevelopment to take place over a number of years. Initial demolition will result in opening Congress Street to daylight and allowing redevelopment of the East Parcel, including a new public plaza and pedestrian connection between the Bullfinch Triangle and Greenway. The east parcel is a critical pedestrian link between Downtown Boston and North Station/Bulfinch Triangle, as well as a link to the Rose Kennedy Greenway. The total development will include 812 new housing units, 196 new hotel rooms, over one million gross square feet of office, and 82,500 gross square feet of retail. The garage will continue to provide sufficient parking for the new onsite uses, commercial parking for transient users as well as overnight resident parking.

We offer the following comments:

1. We believe the proposed development will improve the area for pedestrians compared to existing conditions. The existing garage is a large, foreboding structure from the pedestrian viewpoint. While the potential removal of the garage and the reopening of Congress Street to the sky is appealing in its own right, the proposed development offers additional benefits. As the project is refined during subsequent reviews, MEPA and the BRA must ensure that these benefits are not lost during revisions or project changes. We trust that any project approval will condition the following proposed improvements to ensure they are included in the final design:

  • The removal of overhead parking decks and associated office space, returning sunlight to Congress Street.
  • The proposed pedestrian-only extension of Canal Street through the newly-configured east parcel that greatly benefits heavy rush-hour foot traffic to/ from North Station.
  • The narrowing and redesign of Sudbury Street, including elimination and replacement of angled Police Department parking from the right-of-way.
  • The extension of Bowker Street to make it a through street, eliminating the stairs between Sudbury Street and the existing dead end of Bowker Street.
  • The project could potentially provide very substantial benefits that would have a lasting effect on the built environment of the immediate neighborhood and the entire downtown core of Boston. Careful attention must be paid to the pedestrian experience in and around the site to take advantage of its tremendous pedestrian and transit access. The project is positioned to capitalize on these features and it is incumbent upon MEPA, the BRA and the City of Boston to ensure that the final design fully accounts for these opportunities.

2. Curb cuts for the garage – All curb cuts provided for the new garage should be kept to a minimum width, should enter the street at a right angle, and should be at sidewalk grade (no curb cut for pedestrians). Appropriate vehicle exiting warning signs must be provided for pedestrian safety. The existing garage access drives are too wide and pedestrians on the sidewalk are often threatened by automobiles traveling at high speeds into and out of the garage’s overly wide parking access ramps.

3. MBTA on-site improvements – The project should not interfere with normal MBTA bus operations, and allowance must be made for continued bus and subway service connections on-site. The proponent and the MBTA should commit to additional design work to improve the walking environment in this area to accommodate the large number of pedestrians using transit, along with the additional pedestrian volumes that will be generated by this very large project.

4. Hawkins and Bowker Streets – Bowker Street should become a through street with a changed gradient that allows an ADA compliant sidewalk. If Hawkins Street cannot also be made a through street, the stairs that connect its dead-end at Sudbury Street should be re-graded into an ADA compliant sidewalk.

5. North End Access – While the project claims to reconnect long divided Boston neighborhoods, it fails to offer the North End the same pedestrian benefits it does for the West End, Government Center and Bullfinch Triangle. In fact the project design seems to turn its back on the North End. A North End pedestrian connection should be explored in greater detail. The connection should work to interconnect the north-south walkway through the east parcel, North End residents, the two Green and Orange Line MBTA subway stations, and the Greenway.

6. Walk Signals – The existing pedestrian walk signals at the intersection of New Chardon Street and Canal Street will need to be adjusted. The pedestrian service from Canal Street through the newly configured east parcel will siphon existing North Station foot traffic away from adjacent streets. As a result, this pedestrian walk signal and the narrow mid-crossing island may be overwhelmed by the additional foot traffic on Canal Street. All walk signals on New Chardon, Friend, Sudbury and Merrimac Streets should be adjusted to handle the additional pedestrian traffic that the project will create.

7. Narrowing Sudbury and New Chardon Streets – A detailed study of the potential for narrowing both Sudbury and New Chardon Streets is essential. Such a study should include provisions for wider sidewalks, coordinate with improvements being planned for neighboring streets as part of the Crossroads Initiative and potential bike lanes. Further pedestrian crossing improvements should be explored including the elimination (or infill) of the truck turning lanes at the corner of Merrimac Street and New Chardon Street, and at the corner of New Chardon Street and Congress Street.

8. Other pedestrian ways – The document does not address whether the proponent will maintain or improve pedestrian connections that skirt the northwestern edge of the site, from New Chardon Street, up the Brattle Way pedestrian mall and ultimately out towards Cambridge Street. This pedestrian mall/walkway and associated small park area is well used during the day and it should be considered with the project’s design. The short length of Brattle Way could be an excellent candidate for expanded pedestrian use.

Thank you for the opportunity to comment on the ENF for the Government Center Garage Redevelopment. We believe this site provides an opportunity to develop a transit-oriented, mixed-use project that could showcase pedestrian friendly sidewalks and streets. We hope our comments on the ENF/PNF are incorporated into your requirements for the next phase of design and permitting documents.

Please contact us for any clarification or additional comments that would be useful.

Sincerely,

Wendy Landman                                    Robert Sloane
Executive Director                                  Senior Planner

Comments on the MGM Springfield DEIR

Comments on the MGM Springfield DEIR

January 31, 2014

Secretary Richard K. Sullivan, Jr.
Executive Office of Energy and Environmental Affairs (EEA)
100 Cambridge Street, Suite 900
Boston MA 02114

RE: Comments on the MGM Springfield Draft Environmental Impact Report
EEA #15033

Dear Secretary Sullivan:

WalkBoston has reviewed the Draft Environmental Impact Report for the MGM Springfield proposal and offers the comments below.

Within the DEIR, there are some changes in the dimensions of the plan. The proposal now includes a somewhat smaller, 501,108 square feet casino resort that includes retail/restaurant uses and banquet facilities in addition to gaming space. Adjacent to the casino will be a somewhat smaller 250­‐room hotel, 54 residential units, and an expanded, 159,397 SF retail and entertainment center to be known as Armory Square. A somewhat smaller, 3,740 space on-­site multi-­level parking garage will be provided. In most cases, these alterations to the plan do not appear to affect volumes or paths for walkers.

The ENF Certificate provided by Secretary Sullivan called out additional analysis to be included in the DEIR, and specified that the proponent was to meet with WalkBoston about our comments on the ENF. The Secretary’s Certificate included this language:

“I strongly encourage the proponent to consult with WalkBoston during the preparation of the DEIR to identify opportunities to enhance the development of pedestrian access to and within the site as well as incorporation of safe pedestrian access for off-­site roadway improvements.”

The proponent did meet with us to discuss the project, and were very forthcoming about the pedestrian components of the project. In our discussion we covered many of the ideas that now appear in the DEIR and have solidified the commitment to serving walkers in the project plans and designs.

Secretary Sullivan’s Certificate on the ENF mentioned some specific aspects to be explored further in the DEIR. These are important and form the basis of our comments on the DEIR:
1. Existing and proposed traffic signals.
2. Consistency with a Complete Streets design approach.
3. Existing and proposed connections for pedestrians.
4. A commitment to making improvements to increase the use of walking routes.

1. Existing and proposed traffic signals.
We are pleased to note that the DEIR calls for updating pedestrian signal equipment at the study area intersections around the site.

We note that two mid-­‐block crossings with refuge islands and flasher assemblies are proposed – one on State Street and the other on Union Street ‐ both roughly half way between Main Street and East Columbus Avenue and located at the exterior of the proponent’s site.

Another mid-­block crossing is noted in the DEIR that allows for a mid-­block crossing to reach a bus stop. This crossing is located on Main Street at Howard Street, and represents a response to one of WalkBoston’s recurring concerns ‐ that transit riders should not be required to walk to corner locations to reach a bus stop if the stop is mid-­block. Instead, crosswalks should be added to provide safe and convenient walking routes for transit users.

We encourage the efforts of the proponent to provide a diagonal pedestrian crossing at the intersection of Main and State Streets, where a direct connection to the Mass Mutual Convention Center may be of significant use. We hope that the City of Springfield will work with the proponent to establish this crossing.

The proponent vows to upgrade pedestrian push buttons to MUTCD standards at all locations where new signals will be installed as part of this project or the mitigation efforts that result from the construction of the project. Upgrades of pedestrian push buttons are very welcome as are any other forms of enhancements for pedestrians crossing streets on the perimeter of the project.

2. Consistency with a Complete Streets design approach.
The proponent has been mindful of the design of streets on the perimeter of the project. In particular, the width of sidewalks has been discussed and the design now provides positive benefits to walkers.

For example, sidewalks on Main Street, according to several of the maps, vary in width from 10.5’ to 18.’ On the widest sidewalks, there is the promise of added pedestrian amenities, such as benches, pedestrian level lighting landscaping and other streetscape improvements. The designs of the narrowest sidewalks should be carefully considered to provide a clear walk zone of at least 5 feet, with no obstructions, such as trees or benches, intruding on that width.

We note that the pedestrian network evaluation preceding design has led to proposed improvements to sidewalk pavement conditions, sidewalk widths, crosswalks, and compliance with current accessibility standards.

One of the requirements of a complete streets approach to street design is adequate provision for buses, bus stops and transit riders. In central Springfield, including Main Street along the east boundary of the site, heavy bus traffic (including four major PVTA bus routes) serves downtown employers and merchants and ordinarily occupies a lane that can be shared with bicycles, but should otherwise be retained for exclusive use by buses.

In addition to the PVTA bus routes, a proposed downtown trolley line will connect the casino site to rail and bus service in the vicinity of Union Station, about ½ mile north of this site. The trolley line makes the connection efficiently, and will encourage transit use by casino employees and patrons.

3. Existing and proposed connections for pedestrians.
The proposal includes several connections for pedestrians into the large complex, particularly along Main Street. The proponent has made progress is the design of the proposed Armory Plaza at the south edge of the casino building by providing a car-­free area that combines the open space surrounding the old, restored Armory building with the relatively small but useful open space of DaVinci Park. The use of the Plaza may be combined with the uses in the adjacent Armory Marketplace building and may host civic events and a farmers’ market.

A new pedestrian attraction is the provision of a landscaped plaza atop the casino building. This plaza is completely removed from vehicular traffic and provides a quiet space where people may walk or sit.

A pedestrian connection already exists between the site and the Connecticut River pedestrian and bicycle trail. An existing at-grade crossing at the foot of State Street allows pedestrians to move between the proponent’s site and the trail. It is anticipated that this connection will be used as a way to get from the site to the nearest open space. Lighting under I-­91 at State Street will help open the area to pedestrians by making it more legible and safe.

A similar pedestrian connection exists at Union Street, where the walkway link that passes under I-­91 allow pedestrians to reach the Naismith Basketball Hall of Fame. The distance is relatively short and is eminently walkable. The connection will be improved by the proposed lighting to be placed under I-­91.

4. A commitment to making improvements to increase the use of walking routes.
The proponent’s site is central to the Springfield urban area and will become an integral part of downtown as it is developed. Within the site, there are many places to walk that may require little effort to get patrons to explore. Each entrance/exit to the site should have wayfinding signs to assist walkers and encourage them to walk to destinations within and outside the entertainment complex. The signs should indicate where to find locations such as the center of the casino, the hotel, the outdoor plaza, shops and theatres on the south side of the site, Former Armory, Armory Square Marketplace, the rooftop landscaped plaza, and the main entrances to the parking garage.

Outside the casino complex, there are many attractions in downtown Springfield, and wayfinding signs that guide walkers should include: the Mass Mutual Convention Center, Union Station/Main Bus Depot, Dr. Seuss Sculpture Garden, Springfield Museums, the Civic Center, Springfield Armory, and nearby parks.

Signs should also indicate how to find the riverside attractions including views of the river and the Connecticut River Pedestrian and Bicycle Trail and the Naismith Basketball Hall of Fame.

Wayfinding signs should include walking times to reach destinations. Pedestrians do not think in terms of miles, and minutes required to take a walk are much more effective in conveying the effort that might be involved. Walkers may think little of having to walk ten minutes, but recoil at the prospect of walking ½ mile, even though the distances are the same.

Specific wayfinding signs that should include walking information as well as vehicle and bicycle information are:
• Signs along West Columbus Avenue on the river-­facing side of the site,
• Signs on Union Street at the edge of the project, and
• Signs along the East Columbus Avenue side of the site.

Wayfinding can be enhanced with local walking maps that help people find their way around the site and its environs.

We appreciate your consideration of our comments and look forward to your responses to them. Please feel free to contact WalkBoston with questions you may have.

Sincerely,

Robert Sloane
Senior Project Manager

Comments on the ENF for The Boston Garden project

Comments on the ENF for The Boston Garden project

June 11, 2013

Secretary Richard K. Sullivan, Jr.
Executive Office of Energy and Environmental Affairs (EEA)
Attn: Deirdre Buckley
100 Cambridge Street, Suite 900
Boston MA 02114

RE: Comments on the ENF for The Boston Garden project, MEPA #15052

Dear Mr. Sullivan:

WalkBoston has reviewed the ENF for The Boston Garden project. We understand that the building project will be constructed on 2.8 acres of land fronting on Causeway Street and include:

WalkBoston is supportive of this development and considers it a critical location that requires close examination of pedestrian circulation, as it encompasses major pedestrian movements between regionally important city and suburban transit facilities and a major sports facility. In addition to pedestrians already using the site, the proposal will need to accommodate the movements of the new workers, guests and residents brought into the new buildings on the site as the project components are completed.

Our comments focus on pedestrian volumes to the site, circulation inside the grouping of new buildings and along the perimeter of the site, and the potential for improvements to the Charles River walkway behind North Station.

Pedestrian volumes to and from the site
Many residents of the region already pass through this site daily and for special events. The site is the location of commuter rail connections to the northern half of the metropolitan area, two major subway stations and the TD Boston Garden, home of the Bruins and Celtics professional sports teams. These pedestrian volumes need detailing and evaluation. Our review of the data led us to the following numbers:

In the morning, the combined total for arrivals by commuter rail coupled with patrons exiting the Green and Orange line subway station is thus a number that is around 43,000 2 pedestrians using the stations for transportation access or interconnections in and around the site. A similar number may exist for the afternoon use of the site.

These numbers have not been updated and are of course prior to the construction of office, hotel or residence buildings that will bring additional people to the site. In addition, the existence of the 19,600-seat TD Garden arena above the commuter rail station can create circulation difficulties when people attending events overlap with people leaving the city after work. With over 200 events each year at the TD Garden and limited on-site parking for event attendees, there are many opportunities for overlapping movements of large numbers of people moving into and through the site. It may be possible to have over 60,000 people on the site in the afternoon hours prior to a major event.

As preparatory steps for addressing environmental concerns surrounding this project, it will be important to closely examine the volumes of pedestrian traffic that move to and from the site each working day, and on days with special events in the TD Garden. Flows of pedestrian traffic that are deserving of special attention include movements between:

  •  the Green and Orange Line subway stations and the Commuter Rail Station
  • the Commuter Rail Station and TD Boston Garden
  • the Green and Orange Line subway stations and TD Boston Garden
  • Canal St. (used by downtown workers on foot) and the Commuter Rail Station
  • Canal St. and TD Boston Garden • Canal St. and the Green and Orange Line subway stations

These pedestrian movements deserve to be counted and evaluated for trends that indicate potential future use of transportation facilities at this site. Pedestrians going to or from the new on-site buildings will also be moving between:

  • the commuter rail station and the new buildings on site
  • the subway stations and the new buildings on site
  • Canal St. and the new buildings on site

These potential movements should be projected and evaluated in conjunction with the pedestrian traffic already using the site.

Pedestrian circulation through the buildings on the site
Pedestrians currently move into and out of the TD Garden building by using the east and west entrances on Legends Way and on the O’Neill Building pedestrian way. Plans show the intention of moving much of the pedestrian access between the subway stations and the TD Garden/North Station building below ground level. This will provide protection from weather conditions for walkers and is conceptually a major improvement for all.

The brief current outline of the plan calls for a passageway built under the large office tower to handle all pedestrian movements and connections on the site, located on the first basement level and connecting (in an undefined manner) between the subway stations and the proposed major pedestrian passage, to be called Champions Row. Escalators and elevators will be needed to make the connection fully ADA accessible and to speed the large volumes of pedestrians to their destinations.

It is entirely possible that this connection can be designed to handle the 43,000 users of transportation facilities on-site very well. However, it is equally possible that the volume of pedestrian traffic will be such as to thwart the good intentions of the proponent of this project. There are several possibilities for additional capacity to handle pedestrians in this important location under the office tower:

1. Addition of an escalator- and elevator-served access point leading into the present east entrance to the TD Garden/commuter rail station building (very much like the existing head house, but with a direct, covered connection into the building.)
2. A passageway between the subway station and the TD Garden/commuter rail station building that connects in several potential ways (all underground):
•     As a diagonal passageway between the MBTA undercrossing of Causeway Street and the proposed main stem of the project – Champion’s Row. This passageway should be sufficiently wide to handle the considerable traffic using it twice a day.
•     A passageway under the office tower could support small commercial/retail establishments that can quickly serve people passing through to make their commutes or to attend a large event.
•     A passageway could envisioned as a large food court or produce market serving all pedestrians passing through as well as those who will be working in or nearby after the new structures are built.
•     All proposed principal passageways, including Champions Row, should be unobstructed by escalators or elevators that may impede pedestrian movements.

There may be a desire to connect other buildings or uses planned for the site into this major pedestrian facility under the tower of the office building. If so, a major connection across Champions Row leading into the underground pedestrian facility would be needed to provide access for all of these pedestrian connections and services while also providing access for the four levels of retail attractions that are anticipated for the site

. Based solely on its need to serve so many access points for pedestrians on the site, Champions Row could conceivably become a much more significant and grander element of the site. Champions Row has been located to be on a direct axis between Canal Street and the entrance to the commuter rail station/TD Garden building. Like the major axis of an enclosed shopping center, it also provides direct access to the surrounding transportation facilities and the TD Garden. Alternatively, it could become a part of an imposing railroad station with retail facilities surrounding it and even below it (like South Station, perhaps, grand but laid out as a small Grand Central Station). In either event, the space could become a local landmark and meeting place for residents, commuters and event attendees.

Pedestrian access on the perimeter of the site
Because the new facilities back up to the TD Garden, three sides remain to be served by sidewalks – along Causeway Street, Legends Way and the O’Neill Building pedestrian way.

1.   Causeway Street
Wide sidewalks are planned in keeping with the city’s Crossroads Project plans for Causeway Street. Street furniture and trees will be added in keeping with this plan. On the site, the façades of the new buildings will be lined up with the O’Neill Building to present a uniform appearance along the streets. A number of small and large retail facilities will have access to and from the sidewalks, and access to the three large buildings planned for the site will also be focused on the Causeway Street sidewalk. The sidewalk will not be interrupted by access ramps into the on-site garage, as these ramps are being located at the edge of the site adjacent to the Central Artery, and will supplement the existing ramps that are located at the rear of the TD Garden Building.

However, the diagrams show a loading platform near the proposed hotel building that will interfere with pedestrian traffic on the sidewalk significantly. This loading platform is a potential hazard for pedestrians on the Causeway Street sidewalk, particularly if service trucks back into the site from the street.

To be fully supportive and attractive to pedestrians, the new buildings could be designed to attract and provide interest for passers-by, using strategies such as:
•    Maximize the number of retail outlets facing the sidewalk by using narrow frontages for business facilities
•    Introduce sidewalk cafes, restaurants or bars
•    Provide canopies along the building frontage to protect walkers
•    Avoid intimidating pedestrians by the overwhelming scale of proposed buildings. The proposed façade for the Causeway side of the site is about three blocks long, and has been broadly designed to be a uniform building of four stories topped by towers. The four-story building could be intimidating for pedestrians – it is a very large and long building. Its façade could be articulated to show connections with the streets of the area, as is currently diagrammed for the three large towers planned for the site that line up precisely with Canal Street and Friend Street. The four floors of the building complex that are designed for retail could also reflect these breaks while retaining the alignment with the O’Neill Building, either physically or by using varied building materials.

2. The pedestrian passageway at the O’Neill Bldg.
This walkway should be treated qualitatively as handsomely as the Causeway Street frontage. It has become a major entrance for pedestrians and will continue to provide major access to the commuter rail station and the TD Garden. It could also become more interesting for walkers, if cafes or other retail establishments were added. It has the advantage of the statue of Bobby Orr which is a dramatic addition of great interest to pedestrians using the site. A canopy for the length of the walkway would be of great service to the pedestrians using the walkway for access to the TD Garden/commuter rail building.

3. Legends Way
This street will be of limited use for pedestrians, except to provide access to the east entrance into the TD Garden/commuter rail station building. Access for users of MBTA’s The Ride will be retained. Opportunities for retail uses appear very limited, but should be considered. This is another location where a canopy could be of considerable use to passengers waiting for The Ride.

4. The Riverfront walkway along the Charles
At the rear of the commuter rail station, the tracks serving the terminal narrow down to enter two bascule bridges across the Charles River. At this location, Central Artery plans included a bridge on the North Bank crossing over the tracks, a bridge on the South Bank also over the tracks, and a bridge that would be cantilevered or attached to a bascule bridge. The North Bank Bridge is now completed and in operation. The bascule bridge walkway is in design. The South Bank Bridge remains to be designed and constructed.

As a positive improvement to the environment of this project and as mitigation for some of the anticipated impacts of its construction, the proponent and the MBTA have begun discussions of constructing the South Bank Bridge. This positive development is very exciting, as it would complete the major interconnection of Charles River walkways on both banks, along with connections into the downtown Boston Harborwalk and the Charlestown Navy Yard.

Construction of the South Bank Bridge will involve examination of the potential building methods within a narrowly defined space on both sides of the tracks. On the east side of the tracks a sidewalk follows the boundary of the MBTA trackage at the river’s edge to a dead end at the bascule bridge. This sidewalk may become an approach ramp for the South Bank Bridge. However, there are difficulties in constructing the bridge on the west side of the tracks that are likely to require significant work in examining possibilities. The rewards of designing and constructing this bridge will have regional impact because of its connection to metropolitan-scale pedestrian facilities.

We appreciate your consideration of our comments and look forward to your responses to them. Please feel free to contact WalkBoston with questions you may have.

Sincerely,

Robert Sloane
Senior Project Manager

Comments on ENF for Caesars Resort at Suffolk Downs

Comments on ENF for Caesars Resort at Suffolk Downs

March 26, 2013

Secretary Richard K. Sullivan, Jr.
Executive Office of Energy and Environmental Affairs (EEA)
100 Cambridge Street, Suite 900 Boston MA 02114

RE:     Comments on ENF for Caesars Resort at Suffolk Downs – EEA #15006

Dear Secretary Sullivan:

WalkBoston has reviewed the ENF for Caesars Resort at Suffolk Downs. We find agreement with the general design, as it seems directed toward providing safe facilities for pedestrians. A number of design details should be more closely investigated as part of the DEIR. Our comments about those details follow.

Underlying Assumptions
Many of the patrons and staff of the casino complex and racetrack will arrive on foot from transit stations or parking lots. Thus walking should be a significant element of the project design, coordinated with vehicular routes to minimize potential conflicts. Walking, transit and bike use should be maximize d in keeping with the Commonwealth’s goal of tripling the share of walking, biking and transit use. Access to and from the two MBTA stations and the Route 1A bus lines, and access between distant parking locations and the casinos and the racetrack are the primary routes to be addressed. Walking access between the site and adjacent residential areas should also be addressed.

Good information about the projected volumes of pedestrians (and bicycles) should inform the design and size of facilities.
For example, the ENF states that most employees will come to the site via public transportation. While not explicitly stated, we would anticipate that nearly all would walk from the MBTA stations into the site (unless shuttle service is provided). Because the Suffolk Downs Station is considerably closer to the proposed buildings than Beachmont Station, it will likely attract more users. The walkway from the station into the site should be designed to accommodate the anticipated volume of walkers (and bicyclists if they will use the same route) and the projected volumes should be included in the DEIR.

Overall Design Issues to be addressed
The design of walkways and walk routes should be attractive, include high quality landscaping, and feel inviting both day and night, winter and summer. Designs should include:
– A network of short distance walkways to encourage people to walk on site.
– Lighting for safety, using designs that do not spill into residential areas or obscure the night sky
– Safety and security especially given late night operations for employees and patrons, where there are fairly long walks such as the one to the Suffolk Downs MBTA station
– Benches
– Smooth surfaces on all walkways
– Year round maintenance including snow shoveling
– Shade while walking to the casinos and hotels
– In New England, inclement weather is inevitable, suggesting the possibility of providing shelters or coverings along walkways, or alternative means of reaching destinations, such as a shuttle bus service
– Wayfinding for pedestrians – Signage should be employed as fully as possible to help pedestrians find their routes within this very large site. Signs would also encourage the use of MBTA bus routes and subway facilities, and should be used to designate access points in the event an on-site bus shuttle service is provided. Other off-site locations of interest should be included, such as the Belle Isle Marsh Reservation, Revere Beach and potentially the Target/Super Stop and Shop complex , the racetrack’s horse barns and other sites that might improve the experience of nearby residents as well as patrons of the casinos, the racetrack, and the hotels.
– Parking lots should be designed attractively, with trees and with defined walking paths that are separated from moving vehicle areas within the lots

Multi-use path design.
The paths on the site that are walking/biking multi-use paths should provide appropriate widths to allow for safe shared use. MassDOT standards (Mass Highway Department Project Development and Design Guide, 2006), call for multi-use paths to be 10—14 feet wide to accommodate both pedestrians and bicycles, and for wider facilities if substantial volumes of foot and bike traffic are anticipated.

Tomasello Way/Rte 1A intersection and Tomasello Way Design
Bus service
Bus service along Rte 1A is already substantial. Routes along the roadway connect Salem Center, Marblehead and Peabody Square to Haymarket and Downtown Crossing – 6 bus routes in total. Well-designed and highly-visible bus stops, along with weather-protecting shelters, should be included in the revamping of the intersection of the Tomasello Way/Rte 1A intersection.
Signals and crosswalks
In keeping with the intersection’s importance as the front door of the proposed development, the intersection will need to be fully signalized for safety for all users, including pedestrians who will be crossing Rte 1A to and from the new bus stops and shelters. In the re-signalization of the intersection, pedestrian count-down signals should be employed.
Access between the intersection and the on-site facilities
The proposal includes a major pedestrian way leading from the intersection of Tomasello Way and Rte 1A into the main entrance to the casinos, the racetrack and the hotels. It appears to be useful and attractive, but it must be made safe for walkers and is worthy of significant improvements to make it safe. According to the preliminary drawings, the walkway will be located in the median strip of the rebuilt south portion of Tomasello Way. This is a formal design that could be handsome, but it results in a strip of walkway in the median that could be difficult for walkers to access, because it requires them to cross roadways on both ends of the walkway – near Rte 1A and at the casino/racetrack entrances, as well as at intermediate locations in between – five crosswalks in all. A better solution might be to have the pedestrian way located on the south side of Tomasello Way, with more direct access across the street at a point where the walkway is closest to the casino. This would reduce potential pedestrian/vehicle conflicts along the full length of this stretch of Tomasello Way.
Amenities along Tomasello Way 
Pedestrians walking via Tomasello Way have a relatively long walk between Rte 1A and the site (roughly equivalent to 3-4 city blocks). The preliminary drawings show lines of trees that will be very appropriate to make a pleasant walk. Seating along the way would also make the route more attractive and allow people to rest as they make their way to the casinos or the racetrack.
A sidewalk connecting Tomasello Way and Waldemar Avenue in Orient Heights
A wholly new but short on-site sidewalk connecting Tomasello Way and Waldemar Avenue would allow Orients Heights residents to reach the bus stops at the intersection of Rte 1A and Tomasello Way, and to be able to walk to the casinos or the racetrack.
A roadway connecting Tomasello Way to Waldemar Avenue in Orient Heights
Consideration of a sidewalk connecting Tomasello Way and Waldemar Avenue should include examination of a future road connection as well. A new, relatively short street to link Tomasello Way to Waldemar Avenue could reduce problems at the intersection of Waldemar Avenue and Route 1A near the Tomasello Way entrance to the site because it would allow Orient Heights access to be diverted to the Tomasello Way entrance to the site. The connection could include options for improving the safety of nearby residents:
– Waldemar Avenue could become a dead-end street before reaching Rte 1A; or
– It could be made one-way inbound toward the residences; or
– It might be connected to Vallar Road if gradients are favorable.

The continuation of Tomasello Way to the Suffolk Downs MBTA station
A driveway currently exists along the proponent’s property line between the Rte 1A entrance to the site and the small turnaround space in front of Suffolk Downs T station. The west half of this route has been covered above. However, the future of the east half of the driveway is unclear, even though it could be used for vehicular and pedestrian traffic as part of the larger plan. An explanation should be provided as to:
– Whether this driveway will become an access roadway providing service both to the south entrance to the casino, and to the Suffolk Downs MBTA Station.
–  Whether this driveway will be extended to connect into the local roadways of Orient Heights, such as Waldemar Avenue, Walley Street and Bonito Square. This connection could relatively easily reach Bennington Street as well, and could become a major route for vehicles entering or leaving the site.
–  Whether an improvement is planned for the pedestrian component of the service plaza at the MBTA Station.
–  What the pedestrian connections along this roadway will become, as it provides a major walkway between the MBTA station and the casinos and hotels. This connection might also be used to enhance direct access from neighborhood walkways into the station.

Pedestrian access from off-site locations
Pedestrian access between Orient Heights and a potential Route 1A bus stop at Boardman Avenue.
A partial interchange is proposed for the intersection of Boardman Avenue (Route 145) and Route 1A. The proposal calls for a northbound overpass above Rte 1A to pass over the turning between Rte 1A and Boardman Avenue. The overpass design and focus of turning traffic at the intersection suggests some difficult crossings for pedestrians from Orient Heights. Bus stop access for pedestrians should be explored as part of the proposed partial interchange. It may be possible to link Boardman Street access to the bus stop at Tomasello Way.
Pedestrian access between Orient Heights and the Target/Super Stop and Shop complex
The ENF notes that walkers from Orient Heights need to cross the Suffolk Downs site to get to the shopping complex located near the intersection of Tomasello Way and Furlong Drive, which are important businesses for Orient Heights residents to use. Data support-ing this suggestion would be useful. The multi-use path along Tomasello Way will improve this walk. From a pedestrian point-of-view, the suggested location of the walkway on the east side of Tomasello Way results in pedestrians from Orient Heights crossing at least 6 streets on route to the shopping complex, unless they follow the alternative walking route that hugs the buildings. The proponent should examine whether the walkway could be moved to the west side of Tomasello Way to reduce the number of crossings. Pedestrians walking along Tomasello Way should also be protected from walking through either of the two roundabouts at the approach to the hotels and casinos. Roundabouts are not very safe for pedestrian because of the potential conflicts with turning vehicles.
Pedestrian access between Crescent Heights and the Target/Super Stop and Shop complex
Residents of the Crescent Heights neighborhood at the north edge of the site could also reach the shopping area via the Tomasello Way walkway.
Racetrack walkway to the Target/Super Stop and Shop complex
The plan includes a walkway between the racetrack and the Target/Super Stop and Shop via the edge of the northern parking lots. The intersection of this walkway and Tomasello Way should be moved slightly to align with the front entrance to the shopping complex. The volume of foot traffic at this intersection may be low, but further exploration may suggest the need for a traffic signal with WALK signals.

Potential shuttle bus service
Shuttle buses should be considered to help people get around and to provide options during inclement weather. Options for shuttle bus stops include main entrances to the casino and race track, the Suffolk Downs and Beachmont MBTA stations, bus stops on Route 1A at Tomasello Way, the bus stop on Winthrop Avenue, and for access to the more remote parking areas. Facilities to support shuttle bus service may include the addition of a turnaround area in front of Suffolk Downs MBTA Station and a u-turn on Tomasello Way just short of Route 1A. Shuttles may also be useful to serve future night transit service on the Blue Line and elsewhere.

Local Community Benefits – pedestrian improvements at other locations
The ENF includes suggestions that certain improvements outlined by the Lower North Shore Traffic Study of 2000 could be included as part of the mitigation for the construction of this facility. Although no detail has been supplied on these locations, they appear to include intersections at Route 16 at Winthrop Avenue/Harris Street, the vicinity of the Beachmont MBTA Station in Revere, in the vicinity of Route 16/Route 1A/Bell Circle in Revere, and, in East Boston, at Bennington & Saratoga Streets at Orient Heights MBTA station and Boardman St. in East Boston. Many of these improvements have been requested by the affected communities and will need to be detailed in further submittals to show potential impacts on pedestrians.

We appreciate your consideration of our comments and your responses to them. Please feel free to contact WalkBoston with any questions you may have.

Sincerely,

Wendy Landman
Executive Director

Comments on Barry’s Corner Residential and Retail Commons Project

Comments on Barry’s Corner Residential and Retail Commons Project

January 8, 2013

Gerald Autler

Boston Redevelopment Authority
One City Hall Square
Boston, MA 02201-1007

RE: Barry’s Corner Residential and Retail Commons Project
Expanded Project Notification Form
Submitted Pursuant to Article 80 of the Boston Zoning Code

Dear Mr. Autler:

WalkBoston has reviewed the EENF for the Barry’s Corner Residential and Retail Commons Project in Allston. This project is a first step in a major redevelopment of the surroundings of the intersection of North Harvard Street and Western Avenue, and thus will set the stage for many additional improvements in the vicinity. Our comments reflect the aspects of the proposal that most affect pedestrians, as these components are likely to play an important role in the way in which the project functions and relates to its surroundings.

  •  The area is planned to become the principal focus of North Allston
    Preliminary plans for this site are generally following the consensus presented in the 2005 North Allston Strategic Framework for planning and in Harvard’s Institutional Master Plan from 2012. Both plans call for intensive retail and other development at the intersection. The site of this proposal is but one of several sites that will comprise the North Allston activities. Considering only the north side of Western Avenue, plans call for 200,000 square feet at the Charlesview site, 45,000 square feet on the site of this proposal, and, on the arena site, 60,000 square feet for the arena and 140,000 square feet for the office/retail structure that encloses the basketball court. This totals 445,000 square feet altogether – a number that suggests a need for intensive analysis of the vehicular and foot traffic that will be utilizing all of the sites, including the one that is currently being analyzed. Any proposal for a center that will include at least 400,000 square feet should provide for carefully-considered pedestrian interconnections between its parts.
  • The proposed basketball arena/office building
    The Institutional Master Plan of the Allston campus recently distributed by Harvard introduces a combination of a 3,000-seat basketball arena and 140,000 square feet of retail/office/residences on land immediately north of the project site. The arena will attract many people to games during the basketball season, and perhaps, depending on uses of the facility, in other months as well. What it means in terms of future pedestrian or vehicular traffic is not at all clear from this EENF. The scale of the arena project warrants consideration of its effects on this site. For example, retail activities on the proposed site might benefit from consideration of additional retail on the street level under the arena to make the retail functions of the intersection more prominent.
  • The sidewalk in front of the arena
    The arena site is nearly a mile from Harvard Square. People coming to the area will be largely on foot (they will be discouraged from driving because of the paucity of nearby parking spaces). Large numbers of people will be attracted to the basketball arena for games and perhaps for other uses that may be scheduled there, but the volume of visitors has not been described in the EPNF. Many people will walk from Harvard Square, the Yard and from residence halls north of the river, and most will arrive via the west side of North Harvard Street. These walkers should be provided with a very wide sidewalk along the full length of North Harvard Street (currently shown as a wide sidewalk in front of the existing building but not along the stadium or this development proposal). We would recommend that it be wider than the standard 10’ – 12’ width for multi-use paths, something on the order of 20’ would be appropriate.
  • Extending the sidewalk to the south
    A wide sidewalk along North Harvard Street should not end at the arena, but should provide access to the intersection of Western Avenue and the North Allston activity center. This wide sidewalk would pass directly along the North Harvard street side of this project, and connect to the 45,000 square feet of retail activities that occupy most of the ground floor of this proposal.
  • The Charlesview site
    This site on the northeast corner of the intersection of North Harvard and Western has been planned for retail activity and some residential or office development. The current plan estimates 200,000 square feet for the building complex. Access between sites will take place at the intersection, where crosswalks should be redesigned to more directly connect the two sites.
  • The parks at the North Allston Center
    Two potential sites for parks touch directly on the intersection. The existing grove of trees in front of the Charlesview development and the triangle occupied by the gas station are potential assets to the retail center and should be further developed as landmarks within this center. Either of the two sites could become intensively used by walkers as outdoor spaces to get fresh air, to sit, to read or have a picnic. Pedestrian access to either or both of the sites should be carefully considered as a part of developing the network of sidewalks and street crossings.
  • Crosswalk redesign
    The layout of the existing crosswalks at the intersection of North Harvard Street and Western Avenue maximizes the crossing distances for walkers because all the crosswalks have been laid out as diagonals. This layout makes pedestrian crossings unnecessarily long and require walkers to stay in the street longer than they would if the crosswalks were perpendicular to the streets they cross. One example on Western Avenue shows that the existing crosswalk is nearly 80 feet long, while a perpendicular crossing would be approximately half that length. As part of the intersection improvements associated with this project, crosswalks should be redesigned for the safety of pedestrians. Removal of the refuge island on the Charlesview corner should also be considered as part of the project’s efforts to improve the North Harvard Street/Western Avenue intersection.
  • A new pedestrian crosswalk on North Harvard Street
    Access to the proposed arena and to the site of this proposal will require pedestrian access across North Harvard Street. This is particularly important for people arriving by northbound transit, currently served by bus stops at the north and south ends of the Charlesview site. The existing pedestrian crosswalk at Western Avenue may need to be supplemented by an additional crosswalk at the intersection of North Harvard Street and Smith Field Drive Extension, which is more than 500 feet from Western Avenue, suggesting that a new crosswalk at that location would be convenient and well used. It is made particularly important because it does not make sense to have a crosswalk at Grove Street, because the distance between Western and Grove is very short.

Uses of land within the site
The relatively small size of the site and the need for specific services results in relatively constrained pedestrian access.

  • Vehicle uses
    Almost one-quarter of the parcel will be devoted to vehicle access and surface parking because of the proposed new streets. Vehicular access to the site is one-way northbound from Western Ave. on Smith Field Drive, and two-way on Grove Street between Smith Field Drive and North Harvard Street. The description of vehicular access needs (particularly on-site loading and unloading requirements) implies that a further extension of Smith Field Drive will be constructed soon – perhaps in conjunction with this project, to allow full site access in- and out-bound from its intersection with North Harvard Street. Three streets are to be devoted to providing access to a 2.74 acre site. This may be excessive, unless they are necessary to serve the proposed arena, either temporarily or permanently
  • Parking on the site
    The proposal calls for 180 below-grade parking spaces and 41 surface private spaces, making a total of 221 spaces on-site. These spaces will serve the 325 residences proposed for the site, and potentially some of the retail uses as well. A question remains of whether the underground parking could be reached from Smith Field Drive rather than Grove Street, which seems destined to be degraded by many autooriented uses.
  • New on-site street – Grove Street
    Grove Street is primarily a service street designed to provide truck access to the buildings, access to the below grade garage, and 23 surface parking space. The EPNF does not discuss whether service for the arena (potentially including loading/unloading access for trucks and access to underground parking) will also be provided on the street. The combination of service uses could compromise the character of the street and the street-facing residential units as well. In terms of pedestrian use, Grove Street was designated as a “pedestrian trail” in the university’s Institutional Master Plan. This suggests continuity between Charlesview and Smith Field via Grove Street, which would need a crosswalk located midway between Western Avenue and the Smith Field Drive Extension. Such a crossing – likely to be unsignalized – could be dangerous for pedestrians and drivers alike.
  • A bulky arena as a neighbor
    Depending on its design, the proposed arena may loom dramatically over the site of the current proposal. The project design fort his site actually calls for residential units along Grove Street, along with an irregularly shaped sidewalk and major vehicular access for loading and parking. While the vehicular portions of the proposal for this side of the site are not affected by the neighboring arena, the residential units may well be. Although the dimensions of the proposed arena are unknown, its height may reach more than half of the proposed dwellings on the proposal’s site. The prospect of a looming building also affects the proposed sidewalk, where vehicular impacts are major, and where proposed street trees or wider sidewalks will do little to mitigate the impacts of a large building.
  • New on-site street – Smith Field Drive and Smith Field Drive Extension
    Smith Field Drive and its extension have been designed as a major service way for both this project and the proposed basketball arena. It may have operating difficulties when the arena is in use. A convergence of vehicles and pedestrians would be expected, and traffic control on either has not been discussed.
  • Open space
    Roughly 3,600 square feet of the site’s land has been designated as street-level open space. The two parcels are located at the two corners of the buildings – one facing N. Harvard Street and the other on Western Avenue – and both serve to enhance the entrances to the residences. Additional open space of about 8,000 square feet is provided on the second level above the retail uses, and will only be accessible to residents of the site.
  • Sidewalks
    Sidewalks surround the buildings on all sides and are of irregular widths to accommodate building entrances, potential sidewalk cafes, retail entrances and the vehicular entrances to the building. The proposal for a wide sidewalk on the west side of North Harvard Street suggests the possibility of an overhanging building or a street-level colonnade.

Thank you for the opportunity to provide comments on this important project. Please feel free to contact WalkBoston with questions you may have.

Sincerely,

Bob Sloane
Senior Project Manager