Route 181 Reconstruction Comment Letter

Route 181 Reconstruction Comment Letter

November 18, 2008

Frank A. Tramontozzi, P.E.
Chief Engineer Massachusetts Highway Department
10 Park Plaza
Boston, MA 02116

RE: Route 181 Reconstruction and Minor Widening project in Belchertown, MA
Project File No. 604433

Dear Mr. Tramontozzi:

WalkBoston is the Commonwealth’s leading advocate for pedestrians and safe walking. We work throughout the state – encouraging walking, supporting pedestrian improvements and sponsoring walks. We have extensive experience in helping residents and local governments with pedestrian issues, safe routes to schools and safer street crossings and sidewalks.

We appreciate the opportunity to comment on the proposed reconstruction and minor widening of Route 181 in Belchertown and are pleased to have been notified by MHD about the project. We are commenting because we think there may be ways to further enhance pedestrian safety.

As we have seen in the plans, the project focuses on Route 181 between its intersection with Maple Street (the town center) and the Belchertown-Palmer town line. The reconstructed road will have two 11-foot wide travel lanes and 4-foot wide shoulders. The project will include safety improvement measures such as bicycle accommodation; sidewalk reconstruction; enhanced roadway drainage; improved sight distance in some areas; and installation of guardrail, pavement markings and signage.

We are concerned about pedestrian access in the Route 181 corridor for these reasons:

1. Safe Routes to Schools. WalkBoston is involved with a number of communities across the state in providing walking programs and encouragement, along with planning for physical improvements that could better accommodate children walking to school. In Belchertown, sidewalks connect to both the Center School on Rte 181 north of Maple Street and the Cold Spring School on Rte 181 at Old Springfield Road. Pedestrians going to schools are accommodated along Rte 181 by sidewalks between Maple Street and by a sidewalk between Old Springfield Road to a point about 2000 feet south on Rte 181. These sidewalks should be maintained and, if rebuilt, should be maintained at 4’ or 5’ clear walking width. Poles, signs or other impediments should not be located within the clear walking width.

2. Continuous sidewalk on at least one side of the street. Sidewalks are available on both sides of the street between Maple Street and Old Springfield Road and along only one side of Rte 181 to a point about 2000 feet south of Old Springfield Road. Sidewalks should extend outward for at least 1 mile from schools, assuming there are residences where students might live within that radius. Along Rte 181 south of Old Springfield Road and within 1 mile from the Cold Spring School, there appear to be residences that might warrant extending the sidewalk beyond the 2000’ length.

3. Crosswalks. Along Rte 181, crosswalks are provided at the intersection of Rte 181 and Maple Street and Rte 181 and Old Springfield Road. There is a single intersection with Rte 181 at Fuller Street that does not presently have a crosswalk. Consideration should be given to installation of crosswalks at the Fuller Street intersection, in addition to repainting the crosswalks at the two existing intersections.

4. Detailed design. Sidewalks already in place along Rte 181 should be reconstructed if possible – largely to bring them to a standard width. Care should be taken to assure that any widening of Rte 181 does not narrow sidewalk widths. Where possible, sidewalks should be separated from the roadway by a minimum of 4’ to provide greater safety and comfort for walkers along this relatively high speed road.

Thank you for the opportunity to comment on this project. We look forward to working with you and welcome any questions you may have.

Sincerely,

Wendy Landman
Executive Director

Bob Sloane
Senior Project Manager

Cc: MABPAB
MHD Commissioner Luisa Paiewonsky

Commonwealth Avenue Phase 3 Landscape Improvements Comment Letter

Commonwealth Avenue Phase 3 Landscape Improvements Comment Letter

July 15, 2008

Secretary Ian Bowles
Executive Office of Energy and Environmental Affairs
100 Cambridge Street, Suite 900
Boston, MA 02114

RE: Environmental Notification Form (ENF)
Commonwealth Avenue Phase 3 Landscape Improvements
Newton, MA
MEPA # 14269

Dear Mr. Bowles:

We have reviewed the ENF for the Commonwealth Avenue Phase 3 Landscape Improvements in Newton. We are pleased that walking and pedestrian facilities are major organizing features of the development. We are commenting because details of this worthy project may need further analysis to serve the needs of pedestrians safely and comfortably.

WalkBoston is the Commonwealth’s leading advocate for pedestrians and safe walking. We work throughout the state encouraging walking, advocating for pedestrian improvements and working for design improvements. We have extensive experience helping residents and local government with pedestrian issues, safe routes to school, and safer street crossings.

In the case of the Commonwealth Avenue project, we commend the emphasis on rationalized pedestrian crossings of both the boulevard and the carriageway.

We noted that proposed crossings of the carriageway call for granite pavers of various sizes. Granite pavers have a relatively long history of use in Massachusetts, but do not provide a crosswalk surface that is a benefit for all types of pedestrians. These pavers raise specific questions:

1. Granite pavers cause difficulties for wheeled vehicles of any kind, such as wheelchairs and baby carriages because of the rough surface and cracks between pavers. For others, the surface and the cracks between pavers pose difficulties for, among others, disabled persons or those wearing high-heeled shoes.

2. Over time, granite pavers settle or break under vehicular traffic, frequently in an irregular, causing an unintended roughness in surface and specific hazards where pavers go missing or are destroyed.

3. Maintenance of the pavers is an issue that occurs regularly, Despite offers of continued care, budgetary difficulties and agency staffing problems can confound the best intentions over time. Without proper maintenance, granite pavers can rapidly become hazards for walkers.

4. A somewhat separate issue is pedestrian safety in the face of oncoming traffic. Granite pavers are not always visible to motorists in the same way the painted crosswalks are. The reduced visibility of the pavers may require supplementary signing and pavement painting. With many if not all of the curbs to be reset along this portion of Commonwealth Avenue, pedestrian needs should be included. For example, many of the existing curb radii at intersections are being increased to provide for more smooth passage of vehicles. If traffic moves faster as a result, pedestrians may be in danger at these intersections. In some instances this also results in numerous islands for pedestrians to negotiate along circuitous paths across a single street.

Signage for the project seems to avoid mention of the presence of pedestrians and the need for motorists to respect the rights of people on foot. The few “Pedestrian” signs are to be removed and destroyed, as are the few “Children” signs and the “Speed Limit 30” signs – all of which are designed to provide for pedestrian safety. It is difficult to believe that there are no plans to replace the pedestrian warning signs on this 21st century project.

Thank you for this opportunity to comment on the Commonwealth Avenue project. Please feel free to contact us if further questions arise.

Sincerely,

Wendy Landman
Executive Director

Taunton High School, Parker Middle School, New Pole Elementary Additions and Renovations Comment Letter

Taunton High School, Parker Middle School, New Pole Elementary Additions and Renovations Comment Letter

September 28, 2007

Secretary Ian A. Bowles
Executive Office of Environmental Affairs
Attn: MEPA Office
100 Cambridge Street, Suite 900
Boston, MA 02114

RE: Comments on Taunton High School and Parker Middle School Additions and Renovations/New Pole Elementary School Environmental Notification Form

EOEA # 14099

Dear Mr. Bowles:

We have reviewed the ENF for the proposed project at the site of the existing Taunton High School. The 105-acre site includes the existing High School and Parker Middle School Building. The proposal calls for renovation and additions to the existing buildings and the addition of the new Pole Elementary School. When completed, the High School/Middle School building will have 3200 students and 660 staff and the Pole Elementary School will have 770 students and 87 staff. We are pleased that the city is making investments in this relatively centrally located facility that can be accessed on foot by many students.

We received detailed site plans from the proponent, showing facilities for walking – sidewalks, paths and plazas at the entrance to major facilities. We were impressed that new pedestrian access to the renovated High School/Middle School is a major portion of the renovation plan. In particular there are plazas at the main entrances and sidewalks extending out to the frontage on Williams Street and on Hon. Gordon M. Owen Riverway. Sidewalks surround the new “green” and line the loop road in front of the building. Access from parking lots into the main entrances connect to these walkways.

We do not know from the ENF if pedestrian access off-site is included and hope that the city will make an effort to address off-site issues. The site is about a mile from the center of the city. Its central location suggests that it is accessible by walking for many students. Sidewalks along Williams Street and Owen Riverway already exist and some are being rebuilt as part of this project. Encouraging walkers may require special attention to crosswalks and pedestrian countdown crossing signals, for example, at the intersection of Williams Street and Owen Riverway.

On the site, we suggest that the plans be reviewed to assure that crosswalks are available in all principal pedestrian activity areas. The plans are a bit unclear about pedestrian access to tennis courts, playing fields and the stadium. While we hope that students will be discouraged from driving if they are within walking distance of the school, we also hope that the site improvements will ensure the safety of people who do drive. We note that the major parking area near the school entrance has sidewalks along each edge, and suggest that marked walkways across the parking areas be considered as an added safety feature for students. The principal parking area near the main entrance to the High School has only indirect pedestrian facilities. As a result, many walkers will cross diagonally on the lawn, a situation that could be remedied by installation of a diagonal walkway. We also suggest that sidewalks be provided between the High School/Middle School and other buildings on the site, such as the skating rink.

Thank you for the opportunity to comment on this ENF.

Sincerely,

Robert Sloane
Senior Planner