Tag: comment letter

Mtg Tonight – Re-read WalkBoston Comments on the GLX and the Community Path – March 15, 2016

Mtg Tonight – Re-read WalkBoston Comments on the GLX and the Community Path – March 15, 2016

walkboston:

March 15, 2016
Massachusetts Department of Transportation
10 Park Plaza, Room 4150
Boston, MA 02116

Attention: MassDOT Board of Directors
MBTA  Fiscal Management and Control Board
GLX Interim Project Manager Jack Wright
Assistant Secretary for Policy Coordination Katherine Fichter

RE: GLX and the Community Path

WalkBoston has worked for over 25 years to promote improvements to pedestrian facilities throughout the state and region. We strongly believe that the proposed Community Path adjacent to the Green Line Extension in Somerville and Medford is an essential element to the successful operation of the extension.  The path through this corridor is an integral part of the project that will help it to prosper and serve its riders well, especially when the need is reinforced by the lack of parking at the stations.

The Community Path is essential for the GLX to fully meet its potential in serving the residents of this corridor. It will function as the principal access route to and from the stations for walkers and cyclists, as it will be a safe and protected means of access between residences and the doors of the light rail vehicles. The same levels of access cannot be provided solely by relying on existing streets, which are frequently less direct for users. The safety of walkers is also improved by using routes that are not shared with vehicles.

We urge consideration all possible ways to fund the path and include it an integral part of the construction of this extension. Joint construction is the most cost-effective approach to construction, as the transit project and the Community Path share a common right-of-way and many elements of infrastructure, Cutbacks in the GLX project should not include reducing the number or safety of available routes of access for transit patrons going to or from the stations.

Thank you again for this opportunity to comment on this project.

Sincerely.

Wendy Landman
Executive Director

————————————————————————————————
Join WalkBoston’s Mailing List to keep up to date on advocacy issues.

Like our work? Support WalkBoston – Donate Now!
Connect with us on Twitter and Facebook 

Tonight, #Somerville High School is the place to be. re-read our recent letter on #GLX / Community Path in advance!

Community Path Application Letter of Support Somerville

Community Path Application Letter of Support Somerville

December 3, 2015

City of Somerville,
Community Preservation Committee

Re: Support for Friends of the Community Path application for CPA funding

WalkBoston works across Massachusetts advocating for improved and safe pedestrian facilities. We are very enthusiastic about local efforts that enhance the pedestrian environment, and where possible help residents and municipalities implement new and improved walking facilities.

The Community Path is an important and well-loved component of Somerville’s walking network, and we believe that maintaining and enhancing the Path will provide ongoing benefits to the residents of Somerville.

WalkBoston is pleased to support the application by the Friends of Community Path for CPA funds to improve portions of the heavily used path including the following elements:

  • Repaving of the two sections of the Community Path from the Cambridge City line to Buena Vista Rd. and in the Davis Square area
  • Drainage improvements
  • Side path modifications to improve safety and to enhance use of the Path by runners
  • Possible small expansion of community garden area
  • Installation of historic artifacts specifically related to the Path and the former railroad use
  • Two community meeting to review and discuss the proposed improvements

 

We look forward to seeing these enhancements to the Community Path. Sincerely,

Wendy Landman
Executive Director

Letter of Support for Belchertown’s Reconstruction of Maple and State Street: Project Need

Letter of Support for Belchertown’s Reconstruction of Maple and State Street: Project Need

Mr. Richard J. Masse, P.E.
Acting District Highway Director
811 North King St. Northampton, MA 01016

October 15, 2015

Dear Mr. Masse,

I am writing to express my support for Belchertown’s Project Need Form for the reconstruction of Maple Street and State Street. I am the Program Director at WalkBoston, a state-wide non-profit working to create more pedestrian-friendly communities across Massachusetts. We provide technical assistance to municipalities in partnership with MassDOT’s Bicycle and Pedestrian Safety Awareness and Enforcement program, as well as the Department of Public Health’s Mass in Motion program to promote physical activity and healthy living. We are proud to work closely with our partner and Mass in Motion grantee Healthy Hampshire to support efforts to make Belchertown more walkable.

On May 1, 2015, in partnership with Healthy Hampshire, WalkBoston conducted a walk audit of the Route 202 corridor along Maple Street and State Street to assess existing pedestrian conditions and identify potential infrastructure improvements. Eighteen Belchertown residents, as well as municipal staff from the Planning Department and Conservation Commission, attended the walk audit. The audit found a number of barriers to walking along the Route 202 corridor, including a lack of continuous sidewalks on both sides of the road, a lack of pedestrian safety facilities such as signage, pedestrian lights, raised crosswalks and detectable warning strips, and overly long crosswalks.

The pending redevelopment of the Belchertown state school on Route 202 presents a powerful opportunity to incorporate more pedestrian-friendly designs and infrastructure into this important corridor. Traffic calming techniques, continuous sidewalks and/or off-road paved paths, beautification of public spaces, and better connectivity to local trail networks will all improve the walking environment in Belchertown. Implementing these measures will enhance Belchertown residents’ access to their homes, businesses, schools and social services, as well as future economic opportunities from the state school redevelopment.

Thank you for your timely consideration of these issues. WalkBoston looks forward to working with you to advance active transportation and safe walking in Belchertown.

Sincerely,

Stacey Beuttell
Program Director, WalkBoston

Winthrop Harborwalk Comment Letter

Winthrop Harborwalk Comment Letter

May 27, 2014

Richard K. Sullivan, Jr.
Executive Office of Energy and Environmental Affairs
Attn: Nicholas Zavolas
100 Cambridge St., Suite 900
Boston MA 02114

RE: Comments on the Environmental Notification Form for the Winthrop Harborwalk, Winthrop, MA
MEPA# 15202

Dear Secretary Sullivan:

WalkBoston works across Massachusetts advocating for improved and safe pedestrian facilities. We are very enthusiastic about local efforts that enhance the pedestrian environment, and where possible help residents and municipalities implement new walking facilities.

With delight, WalkBoston reviewed the ENF for the Winthrop Harborwalk, which has been designed to connect many of the water-related land uses in the former main harbor area of the town. It proposes recreating some of the original waterfront by reconstructing of a portion of the railroad trestle that once curved through Winthrop Harbor.

It’s very exciting to see a relatively small town take on a major pedestrian improvement that is focused on the waterfront. The Harborwalk will link the many nearby small businesses and local sidewalks to a new facility designed to offer residents a new way of looking at their harbor and at their town. The basic elements of the project include a new walkway designed to encourage walking along the current harborfront in areas that are primarily devoted to car parking and it opens up close views of several boatyards and marinas that are very close to the walkway.

We offer these comments:

Design the trail for extension to other areas

The proposed facility includes a 25-foot wide path – wider than most 10’-12’ wide joint use trails in Massachusetts. The right-of-way for the trail does not take away from existing parking or sidewalks, but instead adds space for walking through a proposed reuse of a former rail trestle in the harbor. Within this generous space, plans recognize the varying needs of the potential users of the path – for example, sitting spaces, strolling routes, and shade for sunny days. Many trails and viewing platforms are not as extensive or inclusive as this one. It suggests that there will be many users of this attractive facility, which is unique for the town and easily accessible to most residents. Given this likely success, it may be useful to think about extension of the trail to other areas along the waterfront, either where there are existing sidewalks that could perhaps be widened to allow more space or other alternative locations for walking and sitting at the harbor’s edge.

Design the trail to include runners
Joint use rail trails are a success in Massachusetts. Concurrent with the growth in use, new paths need to be carefully designed to serve a wide variety of users. In plans for the future (whether within this right-of-way or in trail extensions), it would be well to consider the needs of runners, who are frequent users of the trails. Runners often prefer a softer surface than that favored by cyclists and walkers; stone dust has frequently been used because it is more resilient and provides a more comfortable running surface.

Thank you for the opportunity to comment on this important project.

Sincerely,

Robert Sloane
Senior Planner

Cc  James McKenna, Town Manager

Beacon Street Multimodal Improvements Comment Letter-Somerville, MA

Beacon Street Multimodal Improvements Comment Letter-Somerville, MA

May 13, 2014

Richard K. Sullivan, Jr.
Executive Office of Energy and Environmental Affairs
Attn: Alex Strysky
100 Cambridge St., Suite 900
Boston MA 02114

Mark Kolonoski
MassDOT Highway Division
Environmental Services Section
10 Park Plaza, Room 4260
Boston, MA 02116

RE: Comments on the Environmental Notification Form for the Beacon Street Multimodal Improvements and Streetscape Enhancement in Somerville, MA

Dear Secretary Sullivan and Mr. Kolonoski:

The Beacon Street project area extends from the bridge abutment at Oxford Street to Dickinson Street, a distance of approximately 1.1 miles. The project is intended to enhance pedestrian and bicycle movements with improved streetscape, wider sidewalks, a new cycle track/bicycle lanes, and new ADA compliant curb ramps. The project goal is to enhance the multimodal connectivity of the Beacon Street Corridor.

We have reviewed this project and offer the following comments:

1. Updated and continuous sidewalks on Beacon Street
The program for complete streets along Beacon Street will result in new cycle tracks and a significant reconstruction of both the street and the sidewalk. Sidewalks are to be updated and rebuilt to correct current deficiencies, including substandard slopes and lack of ramps at intersections. A sidewalk will be added to the south side of Beacon Street in a location where no sidewalk now exists. Adherence to this plan is essential for the safety and convenience of all users of the sidewalk.

The proposed sidewalks will replace the existing 10’-11’ wide sidewalks with new ones of substantially the same width. Retention of this dimension as a minimum is extremely important because some space within the sidewalk will accommodate other uses, such as trees. In only one portion of Beacon Street, where there are space constraints due to an existing stonewall, will the 10’-11’ width be precluded; we note
that no trees are planned for the sidewalk in this section.

2. Cycle tracks and bike lanes
Cycle tracks are proposed between Oxford Street and Museum Street, bike lanes between Museum Street and Park/Scott Streets, cycle tracks between Park/Scott Streets and Washington Street and bike lanes between Washington Street and the Cambridge City line. On the north side of the street, the alignments of the cycle tracks and bike lanes are end-to-end, resulting in a virtually straight path for the full length of
the project.

On the south side of the street the cycle tracks and bike lanes do not quite line up. The transitions between cycle tracks and bike lanes at the intersection of Beacon Street/Museum Street and Park Street/Washington Street are angled to accommodate the needed connections between cycle tracks and bike lanes. These intersections have crosswalks where pedestrians will cross near the bike routes. Since separate traffic signals for bicycles are not included in the project, WalkBoston is concerned that walkers may not be aware that bicycles are approaching at these intersections and need to be especially careful because these diversions might distract the cyclists or the
motorists. We request that special signage and/or pavement markings be provided to alert walkers, bicyclists and drivers of these shifts in alignment and the need to be aware of movements by others.

3. Separation of cycle tracks and sidewalks
In several locations, the proposed cycle tracks are immediately adjacent and at the same grade as the sidewalk. In effect the cycle track will be located on an extension of the sidewalk. A pronounced and clear separation between bicyclists and walkers is needed to deter cyclists from using the sidewalk to bypass slower moving bikes. The
starting and stopping of cycle tracks and bike lanes may be confusing and lead to cyclists using the sidewalks to avoid merging into traffic or worrying about people opening car doors directly in front of them.

Since all 208 of the street trees included this project are to be planted within the width of the sidewalk, we assume that they will help to separate the cycle track from walkers. Other street furniture such as the existing utility and lighting poles, or new benches, trash containers, bollards or signs might also help. The precise location of each element should be carefully considered, as they have the potential to interfere with pedestrian or bicycle movements.

4. Placement of trees
Although the sidewalks are 10 feet wide in nearly all locations along Beacon Street, some of that width – perhaps up to 5 feet – will be lost due to the planting of 208 trees directly in the sidewalk. All of the proposed new trees should be placed in long narrow tree pits (we have seen tree pits that are 2’ wide by 6’-8’ long). More typical 4-foot square tree pits that intrude into the sidewalk should not be used. Irrespective of the shape of the tree pit, tree grates and or special permeable but sturdy filler (similar to that used in some South End locations) should be explored. This is important for the safety of walkers, as is the long-term maintenance of the tree pits so that they do not pose tripping hazards for walkers or for the visually-impaired.

5. Traffic signals at crosswalks and mid-block
New traffic signal equipment and signal timing at the intersections of Beacon Street with Park/Scott and Washington Streets are planned. In addition, two High-Intensity Activated crossWalK (HAWK) pedestrian signals on mast arms are planned for pedestrian crossings at the Sacramento Street intersection and at the Buckingham/Cooney intersection. The project thus appears to have signals of some sort at intervals of about ¼ mile; however, in the portion of Beacon Street between Sacramento Street and the rail overpass at Somerville Avenue, the intersections with Oxford and Prentiss Streets have no traffic signals. With no signals to slow traffic these mid-block crossings may be difficult for pedestrians. Signage or other warnings may be essential to inform drivers and cyclists of the crosswalks.

6. Crosswalk paving
The proposed use of concrete pavers at crosswalks has been cited by one of our members as a hazard for nearly all walkers, and we agree. For all crosswalks on Beacon Street, the customary white reflective thermoplastic strips should be used. Pavers have low visibility and are uneven, making it harder for wheelchairs, seniors, and people pushing strollers or grocery carts.

7. Pedestrian signal phasing
At existing signal locations the exclusive pedestrian phase will be replaced with concurrent pedestrian phasing. For all new signals, a leading pedestrian interval (LPI) is proposed to allow pedestrians to enter the crosswalk before vehicles approaching the intersection have a green signal indication. It will be important to coordinate the LPI at each signalized intersection with any preferential treatment given to bicycles at the same location, to avoid potential conflicts.

8. Signage
There is a need for sidewalk and cycle track signs that make it clear to walkers, bicyclists and drivers how the cycle tracks function. In particular, since all the street’s users will be unfamiliar with cycle tracks it will be important to let pedestrians know what to expect in bicycle movements adjacent to them. Signs should advise bicycles to stay within the cycle tracks and avoid using the sidewalks. Signs should advise walkers of approaching bicycle traffic,places to wait before crossing the street, and to not walk in the cycle tracks. Specific notice should be given to cyclists and pedestrians of potential conflicts at intersections, where turning bicycles, vehicles and pedestrians present many different movements.

9. Lighting
New street lighting has not been proposed, and cyclists may be ‘invisible’ to walkers and drivers. The City should explore the need for additional lighting, especially at intersections where so many different movements will be taking place. In addition, as part of the introduction of the cycle track, the City should explore the opportunity to market and enforce state laws requiring bicycles to carry white front lights on bicycles visible that are visible from 500 feet. WalkBoston has received comments from a number of our older members that they find it impossible to see bicyclists approaching at night if they do not use head lights, and with the addition of a sidewalk level cycle track they are very nervous about crossing the track at intersections.

10. Driveways
A great number of private driveways will be accommodated with this design, with each rebuilt to cross both sidewalk and bicycle facilities. The north side of the street has 43 driveways and the south side has 30. Most of the driveways are narrow, and will involve drivers who will back out to reach Beacon Street. Drivers backing vehicles into the street may have obstructions that limit abilities to see approaching walkers, runners or cyclists.

11. Speed control
Speeds on local streets that are primarily residential such as Beacon Street should be strictly regulated. The current 30-mph limit should not be raised. It should be made lower with advisory signs if possible. Reminder signs should be posted at intervals along the route to warn drivers not to go faster.

Thank you for the opportunity to comment on this project. Please feel free to contact us if you should have questions.

Sincerely,

Wendy Landman
Executive Director

Robert Sloane
Senior Planner