Channelside DEIR/DPIR comments

Channelside DEIR/DPIR comments

August 20, 2021

Secretary Kathleen A. Theoharides
Executive Office of Energy and Environmental Affairs
Attn via email: Alex Strysky (alexander.strysky@state.ma.us )

Director Brian Golden
Boston Planning and Development Agency
Attn via email: Aisling Kerr (Aisling.Kerr@boston.gov)

Re:  Channelside DEIR/DPIR comments

Dear Secretary Theoharides and Director Golden:

WalkBoston, LivableStreets Alliance, Boston Cyclists Union, FPNA and MassBike are submitting our joint comments on the Channelside Project regarding transportation within and to the development site. 

We have focused our comments on the broad and underlying transportation conditions that will impact the existing and future neighborhood as well as the residents and workers who will occupy the proposed 1.4 million SF development that is undergoing review. While we have detailed comments on several aspects of the proponent’s site design and proposed mitigation, these are issues that later project phases could address.

We are pleased that the proponent has fully embraced the idea of Transit Oriented Development (TOD) and Complete Streets designs, and has provided travel projections for the project that predict a net total of 4,633 trips generated by the site of which 4,089 are walking, biking and transit trips – an impressive 88% of all trips! We also applaud the plan to redevelop what currently is non-permeable parking lot pavement into a park and pathway system which will help control the impacts of tidal flooding along the channel.

However, we are disappointed and concerned that the DEIR/DPIR devotes so little analysis of future conditions and, more specifically, how these thousands of trips will be served. Section 4.4 Transportation Build (2028) Condition of the document devotes (excluding maps and tables) ½ page to bike accommodation, 2 pages to transit, and 0 pages to walking (this notwithstanding that both walking and transit mode shares will depend on pedestrian facilities – including especially walking access from South Station and Broadway Station). And we are disappointed the project team is seeking to “not overburden” a transit system which currently does not serve this area sufficiently, instead of actively increasing capacity and service in advance of the rapid growth expected at Channelside. This development cannot be “Transit Oriented” without providing for increased transit usage.

Unfortunately, the DEIR/DPIR is following the precedent of several prior development projects in the Seaport, South Boston and Fort Point Channel neighborhoods, by focusing on this project in isolation of the rapid transformation that is occurring around it. Given the growth of these neighborhoods over the course of the last two decades, continuing to review all development projects in the area as single projects and not more holistically as a large agglomeration of projects that together require significantly better transit, walking and biking conditions to work well for its residents, workers, visitors and businesses, risks the future success of this, and many other projects in the area. 

Continuing down this piecemeal development planning path is unsustainable for the neighborhood and the City, and places undue burden on individual developments to solve problems that may include their project yet go beyond their boundaries. This parcel at 244-284 A Street is a crucial connection to a network of safe bicycling and walking routes that flow throughout the city, and needs to be incorporated into a vision of a connected, sustainable, and safe waterfront trail and harborwalk that includes all of the City’s waterfront neighborhoods.  

We ask that MEPA require the City of Boston (along with MassDOT, the MBTA and Massport) to complete, fund and begin the implementation of the South Boston Transit Study prior to advancing the permitting of new projects. We believe that without such action the proponent’s project (along with existing and other new development projects) will choke the neighborhood with traffic, provide insufficient transit service, not include an accessible sidewalk system (both within the development zone and connecting to South and Broadway Stations), and lack safe bicycle facilities connected to a larger network for those most vulnerable on our roads.

We have included below excerpts from the MEPA and BPDA Scopes for the project that we believe call for an analysis of how all trips (auto and non-auto) trips will be managed and provided for. We do not think that the DEIR/DPIR answers these scope items.

MEPA Scope

Trip Generation

The DEIR should fully describe and document existing and proposed pedestrian and bicycle facilities, transit operations and roadway and intersection conditions within the study Area. (page 9)

The TIA should describe the project’s anticipated transportation impacts and identify appropriate mitigation measures. The Proponent should indicate a clear commitment to implement proposed mitigation measures and describe the timing of their implementation, including whether measures are implemented based on phases of the project or occupancy levels. (Page 10)

Multimodal Facilities

It should describe all existing and proposed pedestrian facilities, including sidewalks, crosswalks, bicycle paths and bicycle parking spaces, located within the study area. The DEIR should review the regional pedestrian and bicycle network, evaluate the safety and capacity of the network and describe potential measures to enhance connections between the site and other locations and routes. (page 9)

BPDA Scope

“Melcher Street will be another important pedestrian connection for the site and its high volume of transit users connecting to South Station. Pedestrian safety and accessibility improvements are needed and a priority for the City and community. The Proponent should commit to working with the city to design and construct improvements to Melcher Street from A Street to Summer Street.”  (Page 26)

Additional transit service and connectivity was identified as needed on A Street in the South Boston Seaport Strategic Transit Plan [and the South Boston Dorchester Avenue Transportation Plan]. “The Proponent should provide shuttle service on A Street that connects to Broadway Station and South Station. Ideally, this would be in partnership with other corridor stakeholders such as State Street Bank that currently provides shuttle service on A Street that connects to South Station. New and efficient shuttle stop locations will need to be determined through consultation with the City.” (Page 26) 

A private shuttle service should not be the primary solution for the lack of transit access in the area. In addition to completing the long awaited South Boston Transit Study, the City should study the potential implementation of BRT on Congress Street, connecting to North Station. Additionally the MBTA is currently in the process of a system-wide bus network project. Now is an opportune time to work with the MBTA to determine the current and future transit needs for the neighborhood and to build the necessary street infrastructure to accommodate that bus service (i.e. bus lanes, new bus stops, ADA accessible sidewalks). 

Sincerely,

Stacey Beuttell, WalkBoston Executive Director
Stacy Thompson, LivableStreets Alliance Executive Director
Becca Thompson, Boston Cyclists Union Executive Director
Tom Ready, FPNA
Galen Mook, MassBike Executive Director

Cc Senator Nick Collins
Representative David Biele
Boston City Councilor Ed Flynn
Boston City Councilor Michael Flaherty
Greg Rooney, Commissioner, Boston Transportation Department
Jamey Tesler, Secretary, MassDOT
Steve Poftak, General Manager, MBTA
Joel A. Barrera, Massport, Director of Strategic and Business Planning
Patrick Sullivan, Seaport TMA, Executive Director
David Gibbons, Executive Director, MCCA
Rick Dimino, President and CEO, ABC

WalkBoston, LivableStreets, Boston Cyclists Union Comments 244 – 284 A Street “Channelside” PNF

WalkBoston, LivableStreets, Boston Cyclists Union Comments 244 – 284 A Street “Channelside” PNF

October 9, 2020

Director Brian Golden
Boston Planning and Development Agency
Attn via email: Aisling Kerr

Secretary Kathleen A. Theoharides
Executive Office of Energy and Environmental Affairs
Attn via email: Alexander Strysky

Re: Comment on 244 – 284 A Street “Channelside” PNF

Dear Director Golden and Secretary Theoharides:

WalkBoston, LivableStreets Alliance and the Boston Cyclists Union are Boston’s leading advocates for active transportation and transit access. We frequently provide comments on major public and private development and infrastructure projects, with a focus on how those projects serve and affect people walking, biking and taking transit.

We realize that these comments are arriving at MEPA after the due date. However, the City’s transportation focused project meeting occurred on September 16, and it’s urban design and resiliency meeting was held on October 7 and we felt that the content of these meetings was important to our understanding of the project. 

The development of the 244 – 284 A Street site along the Fort Point Channel will transform a large and unattractive parking lot into a major site for living, working, and enjoying the Harbor Walk and the large new open spaces that are planned. In a broad sense we believe that the scale and mix of uses is reasonable for the growing mixed-use neighborhood around it, and that the plan for most of the project’s users to access the site on foot, by transit or by bike is appropriate and absolutely necessary for the City to decrease its dependence on private vehicles with their intensive congestion and environmental impacts.

We believe that it is incumbent on the Developer and the City to work together to make sure that the site design, the mitigation and transportation access agreement committed to by the Developer, and the planning and implementation of City transportation improvements (some requiring the City to work with the MBTA, MassDOT and MassPort) are in place to ensure that the site and its surroundings work well for people walking, biking and taking transit.

Our comments therefore are directed jointly to the Developer and the City. We understand that the responsibility of the Proponent to remedy (some of) the off-site issues will be in the form of mitigation dollars rather than execution, so we urge the City to immediately take the steps necessary to plan and design the needed improvements and then include an appropriate contribution from the Proponent in its negotiations.

Project Site Plan

  • Explore reducing the amount of space devoted to vehicles within the site plan by removing Wormwood Street extension.
  • Rationalize bike routes (see comments below)
  • Describe mix of open space uses and include active uses such as playgrounds, basketball etc. to help create a true neighborhood not a “front door” to commercial use

Accessibility

As the Fort Point Channel area and the City’s “100-acre” plan district are developing into a significant residential and commercial neighborhood dependent on good transit and walking access, the need to address accessibility has become ever more evident. 

Walking route from South Station to the site – With a projected 70% mode share of walk and transit trips (which are thus also walking trips) this issue deserves careful attention. Improving the walking route from South Station to the site via Summer Street, particularly for people with disabilities who will not be able to use the stairway that connects Summer Street to the Harborwalk and then to the main entrance of this project is critical. We understand that the City has begun to look at these issues and request that information about the planned improvements be included in the next project filings for Channelside.

  • There is no curb ramp provided from Dorchester Avenue onto the Summer Street Bridge (south side of the bridge). A fully accessible curb ramp should be provided.
  • Accessible access from Summer Street will need to be provided via Melcher Street.  The sidewalk along the south side of Melcher Street appears to have an excessive cross slope that is hazardous for persons with disabilities, and difficult for anyone pushing a stroller or pulling a suitcase. This cross slope will need to be fixed. The slope of the sidewalk exceeds a safe path of travel and may require the addition of several “landing areas” to the sidewalk.  

Walking route from Broadway to the site

  • Walking access to the site from South Boston and Broadway Station via A Street and West 2nd Street also requires accessibility upgrades including curb ramps, sidewalk repair, and possible widening of the sidewalk where the path of travel is narrowed by hydrants, street light poles etc.

Winter weather conditions and general maintenance

  • Management and operations planning should ensure good snow clearance between the site and South Station along the Harborwalk and the sidewalks of Necco and Melcher Streets, and between Broadway and the site. The proponent should work with adjacent property owners and business associations to assure good access to its site under winter weather conditions.

A Street Walking, Biking and Transit Improvements 

A Street is the “Main Street” of this part of Boston and needs to be safe and inviting for all street users. Balancing the needs of people walking, biking and taking transit with those of the cars and trucks using the street is a balancing act that has not yet been achieved. 

Calming A Street for everyone – This will be a first step to turning A Street into a main street and a number of approaches should be used including:

  • Improve the safety of street crossings with the addition of bumpouts, signals (where needed), parking and loading restrictions to ensure daylighting of crosswalks, etc.
  • Narrow travel lanes, add separated bike lanes, restrict parking to protect bus stops, provide bus shelters etc.
  • Add landscaping and benches

Improved Transit + Curbside Management: A Street serves as a critical transit connection between South Boston and South Station and will need to serve many more people as the neighborhood continues to evolve and grow. The City should explore implementing several of the below interventions to improve transit + curbside management: 

  • Work with the MBTA to determine the best bus priority interventions for current and future bus service. These may include a dedicated bus lane, cue jumps and/or transit signal priority. 
  • Improve the accessibility and comfort of existing bus stops on the corridor. 
  • Develop a curb management plan that includes designated loading zones for trucks, taxis + TNC services. The City should also explore time of day loading restrictions, in order to limit or eliminate loading activities along the corridor during peak travel hours. 

Provide Safe and Comfortable Bike Network Connections to and through the site. We appreciate the intention to provide a bike connection to the South Bay Harbor trail, Harbor trail and A Street through the site. However, these connections as they are currently described  are disjointed and potentially dangerous, especially at intersections and areas where cyclists and vehicles  mix. 

  • Weaving the bicycle connection to the South Bay Harbor Trail through the site creates multiple potential conflict points at Necco Street and on the Wormwood extension. A more direct connection on Binford Street may be preferable and should be explored in addition to ensuring there are safe bicycle accommodations on both Necco and Binford Street. 
  • Given the above mentioned transit and large truck uses on A Street, a more detailed plan for how cyclists will safely travel from the site to A Street is needed – specifically at the Binford Street and A Street intersection. 
  • Eliminating the Wormwood extension removes another potential point of conflict both along the street and at the A Street intersection.  

We look forward to working with Proponent and the City as the project planning and design continue.

Sincerely,

Stacey Beuttell
Executive Director, WalkBoston

Stacy Thompson
Executive Director, Livable Streets Alliance

Becca Wolfson
Executive Director, Boston Cyclists Union