Dorchester Bay City Comment Letter

Dorchester Bay City Comment Letter

December 10, 2020
Director Brian Golden
Boston Planning and Development Agency
Attn via email: Aisling Kerr

Secretary Kathleen A. Theoharides
Executive Office of Energy and Environmental Affairs
Attn via email: Erin Flaherty

Re: Dorchester Bay City (EEA# 16277)

Dear Secretary Theoharides and Director Golden:

Dorchester Bay City has the potential to transform a significant site from a largely vacant expanse of asphalt into a vibrant place that draws people from across Boston and the region. Because the ground lease for the property will provide funding for UMass Boston, the site also carries with it an opportunity to strengthen the City’s most important public university.

WalkBoston has reviewed the ENF and PNF with the knowledge that there is a great deal more planning and design to come. We hope that our comments and questions will help to ensure that the scope for the EIR and PIR will help to make the project truly walkable for all.

We also hope that our comments will help to ensure that the proponents, other nearby development teams, and City and State public agencies come together to design and execute the on and off-site infrastructure needed to bring the site’s promise to fruition. The fact that the City’s CAC has been charged with thinking about the benefits, impacts and public infrastructure needs of a collection of projects is a hopeful sign that this bigger picture planning and investment will occur.

Our comments are focused on four key questions:

  1. How will Dorchester Bay City (DBC) achieve the walking connections to the Red Line needed to achieve the mode split envisioned – with relatively low levels of vehicle use and high levels of walking and transit use?
  2. How can DBC be more robustly connected to its immediate and more distant Dorchester neighbors?
  3. What role and responsibility should DBC take in resolving the significant transportation needs that the project’s success is contingent on?
  4. How can some of the site’s more detailed designs ensure that people walking are comfortable, safe and well served by the project itself.

JFK/UMass Station Walking Connections 

The documents describe the poor and unsafe walking connection between the site and the Red Line Station, but level of intervention described to improve the connection is not commensurate with mode share projection and the need of DBC’s occupants. The walking time estimates (shown with concentric circles) do not reflect the actual routes or the psychological barriers posed by the very busy roads and intersections that must be navigated.  Notwithstanding the improvements proposed for Mt. Vernon Street, WalkBoston remains concerned that the quality of the walking environment between the site and the MBTA station will not be attractive enough to generate the substantial transit and pedestrian mode splits that are projected (and which are needed to meet the City’s and State’s GHG targets as well as to prevent ever worsening congestion).

  • We urge the proponent (along with DCR and other public agencies) to think very creatively about this issue and to develop design interventions for the Mt. Vernon Street/Morrissey Boulevard at-grade and underpass intersections that are transformative.
  • We urge DBC to also look at possible walking connections via K Circle and Columbia Road which may be a shorter and more direct walk for some DBC users. The plans being developed for Day Boulevard Extension and for access to the Boston Teacher’s Union Building (5th Street on Figure 1-32 in the PNF) might serve as a starting point for that investigation.
  • As the project plans move ahead, the proponent should also provide a detailed marketing and program plan that will help to achieve the mode splits that have been shown in the ENF and PNF, including a reduction in the number of parking spaces proposed.

Neighborhood Connections

DBC should be connected to its neighbors and to Dorchester. WalkBoston is concerned that DBC will create an island of shiny buildings not connected to their neighbors or the rest of the City.

  • Harbor Point Walking Connection – The grading plans that are proposed to achieve the needed resiliency to ocean level rise will create a grade separation between Harbor Point and DBC. We request that the proponent provide more design details to describe how the physical and neighborly connection will be made between the sites.
  • UMass Walking Connection – UMass is only a five -minute walk from many parts of the DBC site. We ask that the project design team explore ways in which this connection can be made attractive and explicitly help to build a connection between the two.
  • Dorchester, Moakley Park, Carson Beach Connections –We understand that resolution of the design for Morrissey Boulevard and K Circle lies in the hands of state agencies and will be enormously important to these connection issues. But we urge the proponent to delve deeply into design ideas that could help make the walking connections robust. For example:
    • What wonderful walking path and Day Boulevard crossing could connect DBC to Moakley Park?
    • Are there improvements to walking connections via K Circle and Columbia Road that would also continue under the Southeast Expressway to make the walk to Dorchester Ave and beyond significantly more pleasant and fully accessible?

Role and responsibility of DBC in resolving the significant transportation projects

There are very big off site issues that need to be addressed to make this project really work. The proponent acknowledges that the infrastructure needs to match climate resiliency and the scale of the development that is coming on this site and nearby. The projects include JFK/UMass station and service; Morrissey Boulevard, K Circle and Day Boulevard that are re-built as a climate-resilient gateways that serve all modes.

We ask that DBC describe the level of commitment that they will provide to get these projects to successful implementation that goes beyond promises to collaborate and includes firmer commitments in terms of timing, leadership in bringing all parties to the table and funding.

Design Details

We understand that the PNF and ENF show very early stages of design, and ask that the following walking and walkability questions be addressed in greater detail in the DEIR and DPIR.

  • Provide separated walking and biking routes.
  • De-emphasize vehicles throughout the project site – slow them down, make them feel like intruders who have been granted access on good behavior.
  • Provide active places for playing, basketball etc. not just landscaping as a forecourt to buildings. DBC should achieve the lived-in, well-used feel of a neighborhood that feels like a place for everyone.
  • Re-examine the proximity of Building A to Carson Beach, which is public open space and should not feel privatized in any way.
  • Look in a very fine grained way at garage entries and exits, service and loading areas etc. to ensure that they are safe and gracious for people walking.

Thank you for the opportunity to comment on this significant and important development which will occupy on of Boston’s most wonderful sites.

We look forward to working with the DBC Team, the community and City and State agencies to help ensure that a wonderful project is built.

Sincerely,

Stacey Beuttell                                                                                  Wendy Landman
Executive Director                                                                           Senior Policy Advisor

Boston Herald: “Horror in Charlestown: Pedestrian killed after getting struck, dragged for a mile by vehicle”

Boston Herald: “Horror in Charlestown: Pedestrian killed after getting struck, dragged for a mile by vehicle”

Boston Herald: “Horror in Charlestown: Pedestrian killed after getting struck, dragged for a mile by vehicle

During the first five days of the new year, there have already been multiple fatal pedestrian crashes in Massachusetts, including a hit-and-run in Springfield over the weekend, said Brendan Kearney of the WalkBoston advocacy group.

“The number of large vehicles involved with fatal crashes, especially involving people walking or biking, is a huge concern,” he said. “And that’s not just in Boston, but across the state and across the country.

“There are bad sight lines on these vehicles,” Kearney added. “And it’s putting everyone in a bad situation when we have large vehicles and streets where people can drive fast.”

During the coronavirus pandemic, there have been fewer cars on the roads but drivers are speeding at a higher clip, he said.

“That’s something we’ve seen across the state,” Kearney said.

Posted January 5, 2021

Turning Trauma Center Injury Prevention Efforts toward Vision Zero

Turning Trauma Center Injury Prevention Efforts toward Vision Zero

WalkBoston will soon begin working with greater Boston’s Level 1 Trauma Centers to engage them in pedestrian injury prevention efforts.  From 2001-2014, more than 25,000 pedestrians were struck by vehicles in Massachusetts, resulting in unacceptably high numbers of preventable pedestrian injuries. As announced by the Gillian Reny Stepping Strong Center for Trauma Innovation at Brigham & Women’s Hospital, the Center is awarding a grant to WalkBoston to implement a training program to greater Boston’s Level 1 Trauma Centers, giving staff the necessary tools to pursue pedestrian safety improvements as a component of their injury prevention efforts, and laying the groundwork for national efforts.  

 

WalkBoston Comments on DCR Arborway Parkways Improvement Project

WalkBoston Comments on DCR Arborway Parkways Improvement Project

November 6, 2020

Jeffrey R. Parenti, Program Manager
DCR
Division of Planning and Engineering
251 Causeway St.
Boston, MA 02114

Re: WalkBoston Comments on the DCR Arborway Parkways Improvement Project

Dear Jeff:

WalkBoston is enthusiastic about the direction that DCR is taking for the Arborway Improvement Project, both the range of choices that you have shown and the approach of providing opportunities for extensive public comments and input well before any decisions have been made about the project design. We look forward to working with you and the design team to arrive at a truly transformative design for this beautiful but dangerous piece of the Emerald Necklace.

Our comments are framed from the standpoint of design options and operations and are therefore not focused on the specific concepts that have been illustrated to date. As you and the designers have noted, the drawings are indicative of design approaches rather than design specifics.

  • We applaud the Common Features proposed in all three alternatives as outlined on the project website, including: the focus on safety for all modes, vehicle speed reduction throughout, increase in the amount  of parkland and reduction in the amount of pavement, and special care given to the landscape design and trees along the corridor.
  • We understand that the project is still in its early phases of planning and design, but echo the comments at the public meeting that the travel data for all modes is needed to better understand the pros and cons of each option. We caution that pedestrian and bike volumes will likely be understated if existing conditions are the baseline because so many walkers and cyclists avoid this portion of the Arborway in its present configuration. We hope that DCR and the consultant team can provide some understanding of how future conditions might reflect the likely increase in pedestrian and cyclist use of the project area.
  • We believe that separate walking and biking paths must be provided throughout the project area. The Arborway is an important bike commuting corridor, and mixing pedestrians and commuting (higher speed) bicyclists reduces the safety and comfort for both groups. Once the improvements to the Arborway are made, we believe that the corridor will see significant increases in both pedestrian and bike usage.
  • We like the introduction of a signalized pedestrian crossing between Kelley and Murray Circles in Alternatives B and C, and think it is an effective way of slowing traffic and making it clear to drivers that this is an area where there will be many pedestrians and cyclists.
  • We believe that eliminating the traffic circles at Murray and Kelley Circle will provide significant safety improvements for both pedestrians and bicyclists. As noted in MassDOT’s September 2020 Guidelines for the Planning and Design of Roundabouts, locations specifically called out as places where “roundabouts may not be advantageous” include those with “intersections with a heavy concentration of pedestrians and bicyclists,” and “intersections with acute angles between approaches.” Since the Arborway project is being specifically designed to address pedestrian and bicycle safety, and because its geometry may pose problems, we believe that the elimination of the traffic circles is an important element of project design.
  • While the different concepts show improved pedestrian crossings in many locations, we are concerned that there are still quite a few unsignalized slip lane crossings that remain in each of the alternatives. Significant design features, and possibly signals, will be needed to make these crossings safe for walkers and bicyclists.

In addition to our comments on the concepts and the broad conversation that DCR is undertaking, we also urge DCR to engage in more detailed conversations and outreach with the neighbors directly adjacent to the project whose travel patterns will be affected by the changes to the Arborway. We know that there is a long history of high concern by neighbors, and hope that intensive outreach can both answer questions and reduce anxiety about potential changes.

WalkBoston looks forward to continuing to work with you on this exciting project, and we also look forward to walking safely along a rejuvenated part of the Emerald Necklace from Jamaica Pond to Forest Hills in the (relatively) near future.

Sincerely,

Stacey Beuttell, Executive Director

Wendy Landman, Senior Policy Advisor

 

Cc: Nate Lash, nlash@hshassoc.com

WalkBoston, LivableStreets, Boston Cyclists Union Comments 244 – 284 A Street “Channelside” PNF

WalkBoston, LivableStreets, Boston Cyclists Union Comments 244 – 284 A Street “Channelside” PNF

October 9, 2020

Director Brian Golden
Boston Planning and Development Agency
Attn via email: Aisling Kerr

Secretary Kathleen A. Theoharides
Executive Office of Energy and Environmental Affairs
Attn via email: Alexander Strysky

Re: Comment on 244 – 284 A Street “Channelside” PNF

Dear Director Golden and Secretary Theoharides:

WalkBoston, LivableStreets Alliance and the Boston Cyclists Union are Boston’s leading advocates for active transportation and transit access. We frequently provide comments on major public and private development and infrastructure projects, with a focus on how those projects serve and affect people walking, biking and taking transit.

We realize that these comments are arriving at MEPA after the due date. However, the City’s transportation focused project meeting occurred on September 16, and it’s urban design and resiliency meeting was held on October 7 and we felt that the content of these meetings was important to our understanding of the project. 

The development of the 244 – 284 A Street site along the Fort Point Channel will transform a large and unattractive parking lot into a major site for living, working, and enjoying the Harbor Walk and the large new open spaces that are planned. In a broad sense we believe that the scale and mix of uses is reasonable for the growing mixed-use neighborhood around it, and that the plan for most of the project’s users to access the site on foot, by transit or by bike is appropriate and absolutely necessary for the City to decrease its dependence on private vehicles with their intensive congestion and environmental impacts.

We believe that it is incumbent on the Developer and the City to work together to make sure that the site design, the mitigation and transportation access agreement committed to by the Developer, and the planning and implementation of City transportation improvements (some requiring the City to work with the MBTA, MassDOT and MassPort) are in place to ensure that the site and its surroundings work well for people walking, biking and taking transit.

Our comments therefore are directed jointly to the Developer and the City. We understand that the responsibility of the Proponent to remedy (some of) the off-site issues will be in the form of mitigation dollars rather than execution, so we urge the City to immediately take the steps necessary to plan and design the needed improvements and then include an appropriate contribution from the Proponent in its negotiations.

Project Site Plan

  • Explore reducing the amount of space devoted to vehicles within the site plan by removing Wormwood Street extension.
  • Rationalize bike routes (see comments below)
  • Describe mix of open space uses and include active uses such as playgrounds, basketball etc. to help create a true neighborhood not a “front door” to commercial use

Accessibility

As the Fort Point Channel area and the City’s “100-acre” plan district are developing into a significant residential and commercial neighborhood dependent on good transit and walking access, the need to address accessibility has become ever more evident. 

Walking route from South Station to the site – With a projected 70% mode share of walk and transit trips (which are thus also walking trips) this issue deserves careful attention. Improving the walking route from South Station to the site via Summer Street, particularly for people with disabilities who will not be able to use the stairway that connects Summer Street to the Harborwalk and then to the main entrance of this project is critical. We understand that the City has begun to look at these issues and request that information about the planned improvements be included in the next project filings for Channelside.

  • There is no curb ramp provided from Dorchester Avenue onto the Summer Street Bridge (south side of the bridge). A fully accessible curb ramp should be provided.
  • Accessible access from Summer Street will need to be provided via Melcher Street.  The sidewalk along the south side of Melcher Street appears to have an excessive cross slope that is hazardous for persons with disabilities, and difficult for anyone pushing a stroller or pulling a suitcase. This cross slope will need to be fixed. The slope of the sidewalk exceeds a safe path of travel and may require the addition of several “landing areas” to the sidewalk.  

Walking route from Broadway to the site

  • Walking access to the site from South Boston and Broadway Station via A Street and West 2nd Street also requires accessibility upgrades including curb ramps, sidewalk repair, and possible widening of the sidewalk where the path of travel is narrowed by hydrants, street light poles etc.

Winter weather conditions and general maintenance

  • Management and operations planning should ensure good snow clearance between the site and South Station along the Harborwalk and the sidewalks of Necco and Melcher Streets, and between Broadway and the site. The proponent should work with adjacent property owners and business associations to assure good access to its site under winter weather conditions.

A Street Walking, Biking and Transit Improvements 

A Street is the “Main Street” of this part of Boston and needs to be safe and inviting for all street users. Balancing the needs of people walking, biking and taking transit with those of the cars and trucks using the street is a balancing act that has not yet been achieved. 

Calming A Street for everyone – This will be a first step to turning A Street into a main street and a number of approaches should be used including:

  • Improve the safety of street crossings with the addition of bumpouts, signals (where needed), parking and loading restrictions to ensure daylighting of crosswalks, etc.
  • Narrow travel lanes, add separated bike lanes, restrict parking to protect bus stops, provide bus shelters etc.
  • Add landscaping and benches

Improved Transit + Curbside Management: A Street serves as a critical transit connection between South Boston and South Station and will need to serve many more people as the neighborhood continues to evolve and grow. The City should explore implementing several of the below interventions to improve transit + curbside management: 

  • Work with the MBTA to determine the best bus priority interventions for current and future bus service. These may include a dedicated bus lane, cue jumps and/or transit signal priority. 
  • Improve the accessibility and comfort of existing bus stops on the corridor. 
  • Develop a curb management plan that includes designated loading zones for trucks, taxis + TNC services. The City should also explore time of day loading restrictions, in order to limit or eliminate loading activities along the corridor during peak travel hours. 

Provide Safe and Comfortable Bike Network Connections to and through the site. We appreciate the intention to provide a bike connection to the South Bay Harbor trail, Harbor trail and A Street through the site. However, these connections as they are currently described  are disjointed and potentially dangerous, especially at intersections and areas where cyclists and vehicles  mix. 

  • Weaving the bicycle connection to the South Bay Harbor Trail through the site creates multiple potential conflict points at Necco Street and on the Wormwood extension. A more direct connection on Binford Street may be preferable and should be explored in addition to ensuring there are safe bicycle accommodations on both Necco and Binford Street. 
  • Given the above mentioned transit and large truck uses on A Street, a more detailed plan for how cyclists will safely travel from the site to A Street is needed – specifically at the Binford Street and A Street intersection. 
  • Eliminating the Wormwood extension removes another potential point of conflict both along the street and at the A Street intersection.  

We look forward to working with Proponent and the City as the project planning and design continue.

Sincerely,

Stacey Beuttell
Executive Director, WalkBoston

Stacy Thompson
Executive Director, Livable Streets Alliance

Becca Wolfson
Executive Director, Boston Cyclists Union