Category: Comment Letter

Support for Inclusion of Active Streets in Transportation Bond Bill

Support for Inclusion of Active Streets in Transportation Bond Bill

February 5, 2014

Chairman Brian Joyce
Senate Committee on Bonding, Capital Expenditures, and State Assets
State House, Room 109D
Boston, MA 02133

Re: Support for Inclusion of Active Streets in Transportation Bond Bill

Dear Chairman Joyce:

WalkBoston writes to urge you to support the “Active Streets Certification Program” that is included in the Transportation Bond Bill that was recently passed by the House (H3882). Senator Harriette Chandler and Representative Jason Lewis (S68/H3091) filed a version of this language as standalone legislation.

As Massachusetts’ leading pedestrian advocacy organization, WalkBoston works with communities across the state to help them create a safer and more convenient walking environment for their residents. We see very strong interest in walking in urban, suburban and rural municipalities, and we also see communities that are having a difficult time designing and investing in sidewalks and walkways.

The program created under this proposal would encourage communities to build streets and roads that accommodate walking, bicycling and transit use – a.k.a. “Complete Streets” – by creating a small grant program for which they would become eligible after passing a Complete Streets bylaw or ordinance in addition to taking several other actions.

The presence of improved walkways and bicycle facilities encourages an active, healthy lifestyle and reduces auto dependency. In addition to health benefits, Complete Streets can boost the local economy supporting local business districts and increasing property values. While some cities and towns in Massachusetts have already taken steps to implement Complete Streets, this program would provide the necessary incentives and support to encourage even more cities and towns do so.

Thank you very much for your consideration of our request. Please feel free to contact me if you have any questions or concerns, 617-368-9255 or wlandman@walkboston.org

Best regards,

Wendy Landman
Executive Director

 

——————————————————————————————————————-
Join our Mailing List to keep up to date on advocacy issues.

Like our work? Support WalkBoston – Donate Now!
Connect with us on Twitter and Facebook

MGM Springfield Draft Environmental Impact Report EEA #15033

MGM Springfield Draft Environmental Impact Report EEA #15033

January 31, 2014

Secretary Richard K. Sullivan, Jr.
Executive Office of Energy and Environmental Affairs (EEA)
100 Cambridge Street, Suite 900
Boston MA 02114

Dear Secretary Sullivan:

WalkBoston has reviewed the Draft Environmental Impact Report for the MGM Springfield proposal and offers the comments below.

Within the DEIR, there are some changes in the dimensions of the plan. The proposal now includes a somewhat smaller, 501,108 square feet casino resort that includes retail/restaurant uses and banquet facilities in addition to gaming space. Adjacent to the casino will be a somewhat smaller 250-­‐room hotel, 54 residential units, and an expanded, 159,397 SF retail and entertainment center to be known as Armory Square. A somewhat smaller, 3,740 space on-­‐site multi-­‐level parking garage will be provided. In most cases, these alterations to the plan do not appear to affect volumes or paths for walkers. 

The ENF Certificate provided by Secretary Sullivan called out additional analysis to be included in the DEIR, and specified that the proponent was to meet with WalkBoston about our comments on the ENF. The Secretary’s Certificate included this language:

“I strongly encourage the proponent to consult with WalkBoston during the preparation of the DEIR to identify opportunities to enhance the development of pedestrian access to and within the site as well as incorporation of safe pedestrian access for off-­‐site roadway improvements.”

The proponent did meet with us to discuss the project, and were very forthcoming about the pedestrian components of the project. In our discussion we covered many of the ideas that now appear in the DEIR and have solidified the commitment to serving walkers in the project plans and designs.

Secretary Sullivan’s Certificate on the ENF mentioned some specific aspects to be explored further in the DEIR. These are important and form the basis of our comments on the DEIR:

1. Existing and proposed traffic signals.
2. Consistency with a Complete Streets design approach.
3. Existing and proposed connections for pedestrians.
4. A commitment to making improvements to increase the use of walking routes.

1. Existing and proposed traffic signals.
We are pleased to note that the DEIR calls for updating pedestrian signal equipment at the study area intersections around the site.

We note that two mid-­‐block crossings with refuge islands and flasher assemblies are proposed – one on State Street and the other on Union Street -­‐ both roughly half way between Main Street and East Columbus Avenue and located at the exterior of the proponent’s site.

Another mid-­‐block crossing is noted in the DEIR that allows for a mid-­‐block crossing to reach a bus stop. This crossing is located on Main Street at Howard Street, and represents a response to one of WalkBoston’s recurring concerns -­‐ that transit riders should not be required to walk to corner locations to reach a bus stop if the stop is mid-­‐block. Instead, crosswalks should be added to provide safe and convenient walking routes for transit users.

We encourage the efforts of the proponent to provide a diagonal pedestrian crossing at the intersection of Main and State Streets, where a direct connection to the Mass Mutual Convention Center may be of significant use. We hope that the City of Springfield will work with the proponent to establish this crossing.

The proponent vows to upgrade pedestrian push buttons to MUTCD standards at all locations where new signals will be installed as part of this project or the mitigation efforts that result from the construction of the project. Upgrades of pedestrian push buttons are very welcome as are any other forms of enhancements for pedestrians crossing streets on the perimeter of the project. 

2. Consistency with a Complete Streets design approach.
The proponent has been mindful of the design of streets on the perimeter of the project. In particular, the width of sidewalks has been discussed and the design now provides positive benefits to walkers.

For example, sidewalks on Main Street, according to several of the maps, vary in width from 10.5’ to 18.’ On the widest sidewalks, there is the promise of added pedestrian amenities, such as benches, pedestrian level lighting landscaping and other streetscape improvements. The designs of the narrowest sidewalks should be carefully considered to provide a clear walk zone of at least 5 feet, with no obstructions, such as trees or benches, intruding on that width.

We note that the pedestrian network evaluation preceding design has led to proposed improvements to sidewalk pavement conditions, sidewalk widths, crosswalks, and compliance with current accessibility standards.

One of the requirements of a complete streets approach to street design is adequate provision for buses, bus stops and transit riders. In central Springfield, including Main Street along the east boundary of the site, heavy bus traffic (including four major PVTA bus routes) serves downtown employers and merchants and ordinarily occupies a lane that can be shared with bicycles, but should otherwise be retained for exclusive use by buses.

In addition to the PVTA bus routes, a proposed downtown trolley line will connect the casino site to rail and bus service in the vicinity of Union Station, about ½ mile north of this site. The trolley line makes the connection efficiently, and will encourage transit use by casino employees and patrons.

3. Existing and proposed connections for pedestrians.
The proposal includes several connections for pedestrians into the large complex, particularly along Main Street. The proponent has made progress is the design of the proposed Armory Plaza at the south edge of the casino building by providing a car-­‐free area that combines the open space surrounding the old, restored Armory building with the relatively small but useful open space of DaVinci Park. The use of the Plaza may be combined with the uses in the adjacent Armory Marketplace building and may host civic events and a farmers’ market.

A new pedestrian attraction is the provision of a landscaped plaza atop the casino building. This plaza is completely removed from vehicular traffic and provides a quiet space where people may walk or sit.

A pedestrian connection already exists between the site and the Connecticut River pedestrian and bicycle trail. An existing at-­‐grade crossing at the foot of State Street allows pedestrians to move between the proponent’s site and the trail. It is anticipated that this connection will be used as a way to get from the site to the nearest open space. Lighting under I-­‐91 at State Street will help open the area to pedestrians by making it more legible and safe.

A similar pedestrian connection exists at Union Street, where the walkway link that passes under I-­‐91 allow pedestrians to reach the Naismith Basketball Hall of Fame. The distance is relatively short and is eminently walkable. The connection will be improved by the proposed lighting to be placed under I-­‐91.

4. A commitment to making improvements to increase the use of walking routes.
The proponent’s site is central to the Springfield urban area and will become an integral part of downtown as it is developed. Within the site, there are many places to walk that may require little effort to get patrons to explore. Each entrance/exit to the site should have wayfinding signs to assist walkers and encourage them to walk to destinations within and outside the entertainment complex. The signs should indicate where to find locations such as the center of the casino, the hotel, the outdoor plaza, shops and theatres on the south side of the site, Former Armory, Armory Square Marketplace, the rooftop landscaped plaza, and the main entrances to the parking garage.

Outside the casino complex, there are many attractions in downtown Springfield, and wayfinding signs that guide walkers should include: the Mass Mutual Convention Center, Union Station/Main Bus Depot, Dr. Seuss Sculpture Garden, Springfield Museums, the Civic Center, Springfield Armory, and nearby parks.

Signs should also indicate how to find the riverside attractions including views of the river and the Connecticut River Pedestrian and Bicycle Trail and the Naismith Basketball Hall of Fame.

Wayfinding signs should include walking times to reach destinations. Pedestrians do not think in terms of miles, and minutes required to take a walk are much more effective in conveying the effort that might be involved. Walkers may think little of having to walk ten minutes, but recoil at the prospect of walking ½ mile, even though the distances are the same.

Specific wayfinding signs that should include walking information as well as vehicle and bicycle information are:
• Signs along West Columbus Avenue on the river-­‐facing side of the site,
• Signs on Union Street at the edge of the project, and
• Signs along the East Columbus Avenue side of the site.

Wayfinding can be enhanced with local walking maps that help people find their way around the site and its environs.

We appreciate your consideration of our comments and look forward to your responses to them.

Please feel free to contact WalkBoston with questions you may have.

Sincerely,

Robert Sloane
Senior Project Manager 

——————————————————————————————————————-
Join our Mailing List to keep up to date on advocacy issues. 

Like our work? Support WalkBoston – Donate Now! 
Connect with us on Twitter and Facebook 

Mass Central Rail Trail – Wayside Branch, MEPA # 15133

Mass Central Rail Trail – Wayside Branch, MEPA # 15133

December 16, 2013
Richard K. Sullivan, Jr.
Executive Office of Energy and Environmental Affairs
Attn: Purvi Patel
100 Cambridge St., Suite 900
Boston MA 02114

RE: Comments on the Expanded Environmental Notification Form for the Mass Central Rail Trail – Wayside Branch, MEPA # 15133

Dear Secretary Sullivan:

WalkBoston has reviewed the Expanded Environmental Notification Form for the Mass Central Rail Trail – Wayside Branch. We are very pleased that this facility is being seriously examined for construction, as it is essentially the spine of a trail network that will eventually extend east-west across the full width of the state. As proposed, the new trail will extend 23 miles through eight communities, through a 19 feet wide corridor reserved for construction. The proposed trail will be 10’ wide. Its importance cannot be understated: it will serve as the main stem of a network of state-wide greenways.

Our analysis of this proposal suggests that design of the rail trail should ensure that it includes features attractive to a wide range of users, including more than pedestrians, cyclists, and in-line skaters. The trail should be designed to encourage extensive use by runners and joggers. We bring this suggestion into the current review process because it may lead to a consideration of additional width and different materials on a trail surface that provides the best possible conditions for runners and joggers.

Why is WalkBoston involved with runners and joggers? WalkBoston has become involved with runners and joggers because we work for all people on foot –whether they walk slow or run fast – all using the same facilities. For 6 years, WalkBoston has been the recipient of support from the running community through the Boston Marathon Charity program, first as a Boston Athletic Association team and subsequently with charity bibs provided by the John Hancock Insurance Corporation. Our runners have enjoyed partnerships with us and with our coaching team under a program we have called RunBoston. Our staff includes competitors who have run the Marathon and we now have a staff person who is a United States Track & Field (USATF) Certified Level 1 Coach and an Executive Board member of the Mass State Track & Field Coaches Association (MSTCA).

Why add space for runners and joggers? Running and jogging are growth industries. In 2012 over 29,000,000 people ran 50 or more days per year. Evidence of runners is often seen near pathways throughout the state, where they have made their own parallel trails, running in the grass until a semi-permanent dirt path becomes established. Recognizing that such running paths are beneficial to runners, the state Department of Conservation and Recreation has not only retained the informal paths, but is also thinking of new ways to add permanence to running paths that would fully incorporate runners and joggers in their path-making.

Why are runners different from other trail users? Runners prefer a ‘soft’ running surface, yet rail trails are most frequently constructed with a firm surface such as asphalt or concrete, chosen because these surfaces can serve the maximum number of potential users. But nearly all runners agree that a softer surface would be preferable. Concrete is uniformly cited by runners as the hardest surface – the most harmful surface for runners who want to avoid physical injuries. Paths constructed of grass, dirt, wood chips or stone dust are the four top preferred options for surfaces for running, because these surfaces are less likely to result in physical injuries such as a twisted ankle, shin-splints, sprains, Achilles tendonitis or other impact-related injuries. Soft surfaces, such as stone dust, lacking pebbles or rocks that might make running dangerous, also provide runners with greater traction and more control over pace and muscle use.

What design features could encourage running? Parallel running paths could be on both sides of the trail or on only one side, where a path would need to provide for two-way running traffic. The running path could be immediately adjacent to the paved trail or separated from it by a few feet. The path could be from 2-6 feet wide and should be as nearly free of camber in cross-section as possible. The former use of the corridor for rail service means that the gradient of the trail will be easily manageable for runners. Special signage is not necessary, as the alternative trail surface provide explanation for the existence of the addition to the trail.

A separate, parallel path would be useful for runners and possibly walkers as well. Such a path could not only provide the running surface runners prefer, it would also remove runners from the stream of bicycle and pedestrian traffic on the principal portion of the trail. Walkers could also use the path if they prefer a soft walking surface or would like to be somewhat removed from other trail traffic.

Where have running surfaces and separate facilities been provided? The 10 mile long Battle Road footpath is the best-known example in Massachusetts, as it provides a stone dust surface for its entire length between Lexington and Concord.

In Janesville, WI, off-street sections of the proposed bicycle path system are designed to meet AASHTO guidelines and WisDOT recommendations. A 10-foot two-directional paved path is the intended design for most sections. These off-street path segments are required through local regulations to include a two foot wide crushed gravel shoulder on at least one side to accommodate runners and walkers.

In Colorado Springs, CO, the Design Guidelines for US 24 Rural Section 25 include two types of trails paralleling the highway: primary trails, usually 12’ wide and paved with concrete; and secondary trails, adjacent soft surface trails, varying in width and designed to accommodate walkers, joggers and equestrian users.

In Denver, CO, several local trails provide both hard-surface and soft-surface parallel trails. The same approach has also been used in St.Louis, MO, Scottsdale, AZ., Minneapolis, MN, Newark, DE, at several locations in Florida, and along the Chesapeake and Ohio Canal in Maryland.

How can a soft surface be added to the Massachusetts Central Rail Trail project?
The proposal for this rail trail includes a specified right-of-way (negotiated with the MBTA) 
that is 19 feet wide. Within this right-of-way, a 10-foot wide path is proposed to be constructed. The 9-foot space that remains will provide a buffer to neighboring land uses, but a portion of it might be used for a running path, which could be constructed at the same time as the proposed rail trail. This space may vary in width as the rail trail passes over or under bridges, or near physically dangerous, precipitous banks. Locations where it is impossible to construct a parallel path might be avoided by requiring runners to rejoin the main path for a limited distance.

What costs might be incurred? Anticipated costs for construction of a running path vary considerably, but brief research suggests that the use of stone dust appears to cost less than asphalt. This would need to be corroborated.

Adding separate elements for runners fits with the state’s self-image as the most well- known and important marathon running state in the country. The running trail would clearly support the burgeoning running shoe industry that includes three shoe-building companies with headquarters in Massachusetts. Because of its considerable length, the rail trail could well serve as a training facility for runners who are vying for a running bib for the Boston Marathon. It could serve the Boston Athletic Association, which has just declared its intention to form a high-performance elite team to dig in and focus on creating a national-caliber and, hopefully, a world-class-caliber team that lives and trains in the Boston area. The trail just might also provide the setting for preparing a winner for the annual race in April!!

We appreciate your consideration of our comments and look forward to your responses to them. Please feel free to contact WalkBoston with questions you may have.

Sincerely,

Wendy Landman
Executive Director

Cc Joe Orfant, DCR
Dan Driscoll, DCR
Paul Jahnige, DCR
Craig Della Penna, Mass Central Rail Trail , Coordinator 

—————————————————————————–
Join our Mailing List to keep up to date on advocacy issues. 

Like our work? Support WalkBoston – Donate Now! 
Connect with us on Twitter and Facebook 

Government Center Garage Redevelopment Environmental Notification Form EOEA #15134

Government Center Garage Redevelopment Environmental Notification Form EOEA #15134

February 7, 2014

Secretary Richard K. Sullivan, Jr.
Executive Office of Energy and Environmental Affairs (EEA)
100 Cambridge Street, Suite 900
Boston MA 02114

RE: Comments on the Government Center Garage Redevelopment Environmental Notification Form (ENF)

EOEA #15134

Dear Secretary Sullivan,

WalkBoston appreciates the opportunity to provide comments on the Environmental Notification Form (ENF) for the Government Center Garage Redevelopment.

The proposal calls for partial demolition of the underutilized Government Center Garage as an early action, with subsequent demolition and redevelopment to take place over a number of years. Initial demolition will result in opening Congress Street to daylight and allowing redevelopment of the East Parcel, including a new public plaza and pedestrian connection between the Bullfinch Triangle and Greenway. The east parcel is a critical pedestrian link between Downtown Boston and North Station/Bulfinch Triangle, as well as a link to the Rose Kennedy Greenway. The total development will include 812 new housing units, 196 new hotel rooms, over one million gross square feet of office, and 82,500 gross square feet of retail. The garage will continue to provide sufficient parking for the new onsite uses, commercial parking for transient users as well as overnight resident parking.

We offer the following comments:

1. We believe the proposed development will improve the area for pedestrians compared to existing conditions. The existing garage is a large, foreboding structure from the pedestrian viewpoint. While the potential removal of the garage and the reopening of Congress Street to the sky is appealing in its own right, the proposed development offers additional benefits. As the project is refined during subsequent reviews, MEPA and the BRA must ensure that these benefits are not lost during revisions or project changes. We trust that any project approval will condition the following proposed improvements to ensure they are included in the final design:

  • The removal of overhead parking decks and associated office space, returning sunlight to Congress Street.
  • The proposed pedestrian-only extension of Canal Street through the newly-configured east parcel that greatly benefits heavy rush-hour foot traffic to/ from North Station.
  • The narrowing and redesign of Sudbury Street, including elimination and replacement of angled Police Department parking from the right-of-way.
  • The extension of Bowker Street to make it a through street, eliminating the stairs between Sudbury Street and the existing dead end of Bowker Street.
  • The project could potentially provide very substantial benefits that would have a lasting effect on the built environment of the immediate neighborhood and the entire downtown core of Boston. Careful attention must be paid to the pedestrian experience in and around the site to take advantage of its tremendous pedestrian and transit access. The project is positioned to capitalize on these features and it is incumbent upon MEPA, the BRA and the City of Boston to ensure that the final design fully accounts for these opportunities.

2. Curb cuts for the garage – All curb cuts provided for the new garage should be kept to a minimum width, should enter the street at a right angle, and should be at sidewalk grade (no curb cut for pedestrians). Appropriate vehicle exiting warning signs must be provided for pedestrian safety. The existing garage access drives are too wide and pedestrians on the sidewalk are often threatened by automobiles traveling at high speeds into and out of the garage’s overly wide parking access ramps.

3. MBTA on-site improvements – The project should not interfere with normal MBTA bus operations, and allowance must be made for continued bus and subway service connections on-site. The proponent and the MBTA should commit to additional design work to improve the walking environment in this area to accommodate the large number of pedestrians using transit, along with the additional pedestrian volumes that will be generated by this very large project.

4. Hawkins and Bowker Streets – Bowker Street should become a through street with a changed gradient that allows an ADA compliant sidewalk. If Hawkins Street cannot also be made a through street, the stairs that connect its dead-end at Sudbury Street should be re-graded into an ADA compliant sidewalk.

5. North End Access – While the project claims to reconnect long divided Boston neighborhoods, it fails to offer the North End the same pedestrian benefits it does for the West End, Government Center and Bullfinch Triangle. In fact the project design seems to turn its back on the North End. A North End pedestrian connection should be explored in greater detail. The connection should work to interconnect the north-south walkway through the east parcel, North End residents, the two Green and Orange Line MBTA subway stations, and the Greenway.

6. Walk Signals – The existing pedestrian walk signals at the intersection of New Chardon Street and Canal Street will need to be adjusted. The pedestrian service from Canal Street through the newly configured east parcel will siphon existing North Station foot traffic away from adjacent streets. As a result, this pedestrian walk signal and the narrow mid-crossing island may be overwhelmed by the additional foot traffic on Canal Street. All walk signals on New Chardon, Friend, Sudbury and Merrimac Streets should be adjusted to handle the additional pedestrian traffic that the project will create.

7. Narrowing Sudbury and New Chardon Streets – A detailed study of the potential for narrowing both Sudbury and New Chardon Streets is essential. Such a study should include provisions for wider sidewalks, coordinate with improvements being planned for neighboring streets as part of the Crossroads Initiative and potential bike lanes. Further pedestrian crossing improvements should be explored including the elimination (or infill) of the truck turning lanes at the corner of Merrimac Street and New Chardon Street, and at the corner of New Chardon Street and Congress Street.

8. Other pedestrian ways – The document does not address whether the proponent will maintain or improve pedestrian connections that skirt the northwestern edge of the site, from New Chardon Street, up the Brattle Way pedestrian mall and ultimately out towards Cambridge Street. This pedestrian mall/walkway and associated small park area is well used during the day and it should be considered with the project’s design. The short length of Brattle Way could be an excellent candidate for expanded pedestrian use.

Thank you for the opportunity to comment on the ENF for the Government Center Garage Redevelopment. We believe this site provides an opportunity to develop a transit-oriented, mixed-use project that could showcase pedestrian friendly sidewalks and streets. We hope our comments on the ENF/PNF are incorporated into your requirements for the next phase of design and permitting documents.

Please contact us for any clarification or additional comments that would be useful.

Sincerely,

Wendy Landman                                    Robert Sloane
Executive Director                                  Senior Planner

Comments on the MGM Springfield DEIR

Comments on the MGM Springfield DEIR

January 31, 2014

Secretary Richard K. Sullivan, Jr.
Executive Office of Energy and Environmental Affairs (EEA)
100 Cambridge Street, Suite 900
Boston MA 02114

RE: Comments on the MGM Springfield Draft Environmental Impact Report
EEA #15033

Dear Secretary Sullivan:

WalkBoston has reviewed the Draft Environmental Impact Report for the MGM Springfield proposal and offers the comments below.

Within the DEIR, there are some changes in the dimensions of the plan. The proposal now includes a somewhat smaller, 501,108 square feet casino resort that includes retail/restaurant uses and banquet facilities in addition to gaming space. Adjacent to the casino will be a somewhat smaller 250­‐room hotel, 54 residential units, and an expanded, 159,397 SF retail and entertainment center to be known as Armory Square. A somewhat smaller, 3,740 space on-­site multi-­level parking garage will be provided. In most cases, these alterations to the plan do not appear to affect volumes or paths for walkers.

The ENF Certificate provided by Secretary Sullivan called out additional analysis to be included in the DEIR, and specified that the proponent was to meet with WalkBoston about our comments on the ENF. The Secretary’s Certificate included this language:

“I strongly encourage the proponent to consult with WalkBoston during the preparation of the DEIR to identify opportunities to enhance the development of pedestrian access to and within the site as well as incorporation of safe pedestrian access for off-­site roadway improvements.”

The proponent did meet with us to discuss the project, and were very forthcoming about the pedestrian components of the project. In our discussion we covered many of the ideas that now appear in the DEIR and have solidified the commitment to serving walkers in the project plans and designs.

Secretary Sullivan’s Certificate on the ENF mentioned some specific aspects to be explored further in the DEIR. These are important and form the basis of our comments on the DEIR:
1. Existing and proposed traffic signals.
2. Consistency with a Complete Streets design approach.
3. Existing and proposed connections for pedestrians.
4. A commitment to making improvements to increase the use of walking routes.

1. Existing and proposed traffic signals.
We are pleased to note that the DEIR calls for updating pedestrian signal equipment at the study area intersections around the site.

We note that two mid-­‐block crossings with refuge islands and flasher assemblies are proposed – one on State Street and the other on Union Street ‐ both roughly half way between Main Street and East Columbus Avenue and located at the exterior of the proponent’s site.

Another mid-­block crossing is noted in the DEIR that allows for a mid-­block crossing to reach a bus stop. This crossing is located on Main Street at Howard Street, and represents a response to one of WalkBoston’s recurring concerns ‐ that transit riders should not be required to walk to corner locations to reach a bus stop if the stop is mid-­block. Instead, crosswalks should be added to provide safe and convenient walking routes for transit users.

We encourage the efforts of the proponent to provide a diagonal pedestrian crossing at the intersection of Main and State Streets, where a direct connection to the Mass Mutual Convention Center may be of significant use. We hope that the City of Springfield will work with the proponent to establish this crossing.

The proponent vows to upgrade pedestrian push buttons to MUTCD standards at all locations where new signals will be installed as part of this project or the mitigation efforts that result from the construction of the project. Upgrades of pedestrian push buttons are very welcome as are any other forms of enhancements for pedestrians crossing streets on the perimeter of the project.

2. Consistency with a Complete Streets design approach.
The proponent has been mindful of the design of streets on the perimeter of the project. In particular, the width of sidewalks has been discussed and the design now provides positive benefits to walkers.

For example, sidewalks on Main Street, according to several of the maps, vary in width from 10.5’ to 18.’ On the widest sidewalks, there is the promise of added pedestrian amenities, such as benches, pedestrian level lighting landscaping and other streetscape improvements. The designs of the narrowest sidewalks should be carefully considered to provide a clear walk zone of at least 5 feet, with no obstructions, such as trees or benches, intruding on that width.

We note that the pedestrian network evaluation preceding design has led to proposed improvements to sidewalk pavement conditions, sidewalk widths, crosswalks, and compliance with current accessibility standards.

One of the requirements of a complete streets approach to street design is adequate provision for buses, bus stops and transit riders. In central Springfield, including Main Street along the east boundary of the site, heavy bus traffic (including four major PVTA bus routes) serves downtown employers and merchants and ordinarily occupies a lane that can be shared with bicycles, but should otherwise be retained for exclusive use by buses.

In addition to the PVTA bus routes, a proposed downtown trolley line will connect the casino site to rail and bus service in the vicinity of Union Station, about ½ mile north of this site. The trolley line makes the connection efficiently, and will encourage transit use by casino employees and patrons.

3. Existing and proposed connections for pedestrians.
The proposal includes several connections for pedestrians into the large complex, particularly along Main Street. The proponent has made progress is the design of the proposed Armory Plaza at the south edge of the casino building by providing a car-­free area that combines the open space surrounding the old, restored Armory building with the relatively small but useful open space of DaVinci Park. The use of the Plaza may be combined with the uses in the adjacent Armory Marketplace building and may host civic events and a farmers’ market.

A new pedestrian attraction is the provision of a landscaped plaza atop the casino building. This plaza is completely removed from vehicular traffic and provides a quiet space where people may walk or sit.

A pedestrian connection already exists between the site and the Connecticut River pedestrian and bicycle trail. An existing at-grade crossing at the foot of State Street allows pedestrians to move between the proponent’s site and the trail. It is anticipated that this connection will be used as a way to get from the site to the nearest open space. Lighting under I-­91 at State Street will help open the area to pedestrians by making it more legible and safe.

A similar pedestrian connection exists at Union Street, where the walkway link that passes under I-­91 allow pedestrians to reach the Naismith Basketball Hall of Fame. The distance is relatively short and is eminently walkable. The connection will be improved by the proposed lighting to be placed under I-­91.

4. A commitment to making improvements to increase the use of walking routes.
The proponent’s site is central to the Springfield urban area and will become an integral part of downtown as it is developed. Within the site, there are many places to walk that may require little effort to get patrons to explore. Each entrance/exit to the site should have wayfinding signs to assist walkers and encourage them to walk to destinations within and outside the entertainment complex. The signs should indicate where to find locations such as the center of the casino, the hotel, the outdoor plaza, shops and theatres on the south side of the site, Former Armory, Armory Square Marketplace, the rooftop landscaped plaza, and the main entrances to the parking garage.

Outside the casino complex, there are many attractions in downtown Springfield, and wayfinding signs that guide walkers should include: the Mass Mutual Convention Center, Union Station/Main Bus Depot, Dr. Seuss Sculpture Garden, Springfield Museums, the Civic Center, Springfield Armory, and nearby parks.

Signs should also indicate how to find the riverside attractions including views of the river and the Connecticut River Pedestrian and Bicycle Trail and the Naismith Basketball Hall of Fame.

Wayfinding signs should include walking times to reach destinations. Pedestrians do not think in terms of miles, and minutes required to take a walk are much more effective in conveying the effort that might be involved. Walkers may think little of having to walk ten minutes, but recoil at the prospect of walking ½ mile, even though the distances are the same.

Specific wayfinding signs that should include walking information as well as vehicle and bicycle information are:
• Signs along West Columbus Avenue on the river-­facing side of the site,
• Signs on Union Street at the edge of the project, and
• Signs along the East Columbus Avenue side of the site.

Wayfinding can be enhanced with local walking maps that help people find their way around the site and its environs.

We appreciate your consideration of our comments and look forward to your responses to them. Please feel free to contact WalkBoston with questions you may have.

Sincerely,

Robert Sloane
Senior Project Manager