RE: Comments on the Government Center Garage Redevelopment Environmental Notification Form (ENF)

EOEA #15134

Dear Secretary Sullivan,

WalkBoston appreciates the opportunity to provide comments on the Environmental Notification Form (ENF) for the Government Center Garage Redevelopment.

The proposal calls for partial demolition of the underutilized Government Center Garage as an early action, with subsequent demolition and redevelopment to take place over a number of years. Initial demolition will result in opening Congress Street to daylight and allowing redevelopment of the East Parcel, including a new public plaza and pedestrian connection between the Bullfinch Triangle and Greenway. The east parcel is a critical pedestrian link between Downtown Boston and North Station/Bulfinch Triangle, as well as a link to the Rose Kennedy Greenway. The total development will include 812 new housing units, 196 new hotel rooms, over one million gross square feet of office, and 82,500 gross square feet of retail. The garage will continue to provide sufficient parking for the new onsite uses, commercial parking for transient users as well as overnight resident parking.

We offer the following comments:

1. We believe the proposed development will improve the area for pedestrians compared to existing conditions. The existing garage is a large, foreboding structure from the pedestrian viewpoint. While the potential removal of the garage and the reopening of Congress Street to the sky is appealing in its own right, the proposed development offers additional benefits. As the project is refined during subsequent reviews, MEPA and the BRA must ensure that these benefits are not lost during revisions or project changes. We trust that any project approval will condition the following proposed improvements to ensure they are included in the final design:

  • The removal of overhead parking decks and associated office space, returning sunlight to Congress Street.
  • The proposed pedestrian-only extension of Canal Street through the newly-configured east parcel that greatly benefits heavy rush-hour foot traffic to/ from North Station.
  • The narrowing and redesign of Sudbury Street, including elimination and replacement of angled Police Department parking from the right-of-way.
  • The extension of Bowker Street to make it a through street, eliminating the stairs between Sudbury Street and the existing dead end of Bowker Street.
  • The project could potentially provide very substantial benefits that would have a lasting effect on the built environment of the immediate neighborhood and the entire downtown core of Boston. Careful attention must be paid to the pedestrian experience in and around the site to take advantage of its tremendous pedestrian and transit access. The project is positioned to capitalize on these features and it is incumbent upon MEPA, the BRA and the City of Boston to ensure that the final design fully accounts for these opportunities.

2. Curb cuts for the garage – All curb cuts provided for the new garage should be kept to a minimum width, should enter the street at a right angle, and should be at sidewalk grade (no curb cut for pedestrians). Appropriate vehicle exiting warning signs must be provided for pedestrian safety. The existing garage access drives are too wide and pedestrians on the sidewalk are often threatened by automobiles traveling at high speeds into and out of the garage’s overly wide parking access ramps.

3. MBTA on-site improvements – The project should not interfere with normal MBTA bus operations, and allowance must be made for continued bus and subway service connections on-site. The proponent and the MBTA should commit to additional design work to improve the walking environment in this area to accommodate the large number of pedestrians using transit, along with the additional pedestrian volumes that will be generated by this very large project.

4. Hawkins and Bowker Streets – Bowker Street should become a through street with a changed gradient that allows an ADA compliant sidewalk. If Hawkins Street cannot also be made a through street, the stairs that connect its dead-end at Sudbury Street should be re-graded into an ADA compliant sidewalk.

5. North End Access – While the project claims to reconnect long divided Boston neighborhoods, it fails to offer the North End the same pedestrian benefits it does for the West End, Government Center and Bullfinch Triangle. In fact the project design seems to turn its back on the North End. A North End pedestrian connection should be explored in greater detail. The connection should work to interconnect the north-south walkway through the east parcel, North End residents, the two Green and Orange Line MBTA subway stations, and the Greenway.

6. Walk Signals – The existing pedestrian walk signals at the intersection of New Chardon Street and Canal Street will need to be adjusted. The pedestrian service from Canal Street through the newly configured east parcel will siphon existing North Station foot traffic away from adjacent streets. As a result, this pedestrian walk signal and the narrow mid-crossing island may be overwhelmed by the additional foot traffic on Canal Street. All walk signals on New Chardon, Friend, Sudbury and Merrimac Streets should be adjusted to handle the additional pedestrian traffic that the project will create.

7. Narrowing Sudbury and New Chardon Streets – A detailed study of the potential for narrowing both Sudbury and New Chardon Streets is essential. Such a study should include provisions for wider sidewalks, coordinate with improvements being planned for neighboring streets as part of the Crossroads Initiative and potential bike lanes. Further pedestrian crossing improvements should be explored including the elimination (or infill) of the truck turning lanes at the corner of Merrimac Street and New Chardon Street, and at the corner of New Chardon Street and Congress Street.

8. Other pedestrian ways – The document does not address whether the proponent will maintain or improve pedestrian connections that skirt the northwestern edge of the site, from New Chardon Street, up the Brattle Way pedestrian mall and ultimately out towards Cambridge Street. This pedestrian mall/walkway and associated small park area is well used during the day and it should be considered with the project’s design. The short length of Brattle Way could be an excellent candidate for expanded pedestrian use.

Thank you for the opportunity to comment on the ENF for the Government Center Garage Redevelopment. We believe this site provides an opportunity to develop a transit-oriented, mixed-use project that could showcase pedestrian friendly sidewalks and streets. We hope our comments on the ENF/PNF are incorporated into your requirements for the next phase of design and permitting documents.

Please contact us for any clarification or additional comments that would be useful.

Sincerely,

Wendy Landman                                    Robert Sloane
Executive Director                                  Senior Planner

Silver Line Gateway Comment Letter

Silver Line Gateway Comment Letter

WalkBoston has reviewed the Expanded Environmental Notification Form for the Silver Line Gateway Bus Rapid Transit proposal, which will provide additional MBTA service between South Station and the Seaport District into Chelsea and East Boston. The new transit service will be a welcome addition for residents needing improved access into the heart of the metropolitan area.

Read the full letter here:
WalkBoston-CommentENF-SilverLineGateway-Chelsea

Comments on Charles River Basin Connectivity Study

Comments on Charles River Basin Connectivity Study

December 16, 2013

Richard K. Sullivan, Jr.
Executive Office of Energy and Environmental Affairs
Attn: Dan Driscoll
100 Cambridge St., Suite 900
Boston MA 02114

RE: Comments on the Charles River Basin Connectivity Study

Dear Secretary Sullivan:

WalkBoston has reviewed the Charles River Basin Pedestrian and Bicycle Study for Pathways and Bridges, the so-called Connectivity Study. Our comments arise from the document and from the recent presentation of the study to the public.

The Connectivity Study is very exciting work, as it assembles the issues of movement along the basin very effectively, and points out the possibilities for positive changes in the paths, walkways and running facilities along the River. DCR should be very proud of this feat, and should proceed into implementation of priority aspects of the planning effort as soon as possible.

We were particularly heartened by the Study’s general recommendations for the Basin: “DCR should strive to develop a 10’-wide paved path with a parallel soft-surface trail or shoulder for runners (emphasis added) where possible….. In “pinch point” conditions, a minimum 8’ paved path, with 3’ shoulder on one side, should be incorporated.”

This acceptance of separate paths for runners and joggers – and also pedestrians – is a very important aspect of the planning and represents continuity with past planning efforts.

In the 2002 Master Plan for the Basin a stated goal was to provide safe and continuous bicycle, skating, and pedestrian access along the entire length of the Basin, with a “separation of footpaths and bike paths where doing so will not create excessive pavement near the shoreline.” The master plan also called for reducing congestion and minimizing conflicts on the paths (presumably conflicts between bicycles and pedestrians).

In 2005, users were surveyed to discern attitudes about the river facilities. The survey asked respondents to list and rank how they used the Basin. The top twelve responses were, in order of frequency:
Walking for pleasure
Attending concerts or events
Relaxing in the park
Driving on the parkways
Running or walking for exercise
Biking
Using Riverbend Park in summer
Picnicking
Enjoying the outdoors with children
Inline skating
Walkathons
Informal sports

More than sixty percent of those surveyed used the Basin more than once a week for strolling, relaxing, attending concerts or attending special events. Eighty-six percent asked for easier and safer pedestrian access to the Basin, and an equal proportion recommended separating pathways by user types. Users also frequently called for more benches and places to sit, more wildlife areas, more park rangers, and more convenient parking.

If the Continuity Study can be regarded as an update to the Master Plan, we think it may be leaving out some of the emphasis that the authors of the two planning documents clearly stated. In particular, the separation of bicycle and pedestrian paths does not seem to be as important an aspect of the plan as the users of the park suggested to be of high importance. WalkBoston believes that path separation should be integral to all elements of the plan, as it will help deal with the many problems inherent in an area that is so heavily used with so many potential conflicts between users.

We urge consideration of the following:
1. The elimination of conflicts between users of the paths should be uppermost as a safety precaution. Conflicts arise where bicycle traffic is moving rapidly through areas where pedestrians are strolling, causing dangerous situations for all. The conflicts are particularly difficult for commuting cyclists, some of whom are loath to slow down.

2. An expansion of the definition of ‘multi-use path’ would open options that are not clearly included at the moment. Multi-use pathways in the Basin should have an element – probably a parallel, separate path – that would cater to slow-moving walkers, runners and joggers. The foot traffic path could be built entirely separated from the paved path or built as a non-cambered shoulder.

3. Multi-use paths are appropriate for areas where there is low density of use by walkers, runners and cyclists, but should not dominate planning for the heart of the very heavily used park system in the center of Boston. Instead, the overriding goal should be provision of facilities in which space is plentiful for all park users and potential conflicts between users are minimized using methods that are appropriate to each location.

4. Existing multi-use paths should be expanded all along the river to meet the definition of separation between paths based on user needs.

5. Recognition of what runners and joggers show about their desires for facilities would help in planning new paths. Narrow dirt paths that exist informally alongside many of the paved paths in the Basin demonstrate a clear desire for a softer surface preferred by runners. The softer surfaces can also be used by pedestrians and will clearly help separate cyclists from people on foot.

6. A demonstration of the path separation is included in the proposal for the Greenough Boulevard narrowing. The effects on users would be an important element to explore.

7. Path separation in the near term may only be possible on one side of the river. The Greenough Boulevard proposal and the Memorial Drive narrowing between the Eliot and Anderson Bridges point in the direction of path separation as a major feature on the north bank. Continuation of path separation both west and east of these two segments would be a next logical step. Except at intersections, parkland seems to be available for new or modified paths.

8. An unfortunate aspect of all path planning along the river is the intersections with streets at the bridges. The narrow paths that exist at many of the bridges will be a major feature of riverfront paths for a long time, but should not preclude path separation away from the bridge intersections.

9. As long-term improvements, underpasses at bridge intersections are appropriate and important options that will enhance the recreational and transportation options for many Basin users.

We appreciate your consideration of our comments and look forward to your responses to them. Please feel free to contact WalkBoston with questions you may have.

Sincerely,

Wendy Landman                                    Bob Sloane
Executive Director                                  Senior Project Manager

Cc Nicole Freedman, Boston Bikes
Cara Seiderman, City of Cambridge
Steve McLaughlin, MassDOT
Margo Levine Newman, The Esplanade Association
Renata von Tscharner, Charles River Conservancy
Herb Nolan, Solomon Fund
Jackie Douglas, LivableStreets Alliance
Pete Stidman, Boston Cyclists Union
David Watson, MassBike
Tom Grilk, Boston Athletic Association

Greenwood Square/Greenwood School Area Walk Assessment Wakefield

Greenwood Square/Greenwood School Area Walk Assessment Wakefield

The Wakefield Town Administrator, Stephen Maio, is interested in improving the image and overall economic viability of the Greenwood Square/ Greenwood School area of Wake eld. In addition, members of the Greenwood Elementary School faculty and staff would like to revive the Walk-to- School program and make the walking routes safer for students to walk to school.

Read the full report here:
WalkBoston-Greenwood SquareGreenwood SchoolAreaAssessment-Wakefield