Comments on Longfellow Bridge Rehabilitation (MassDOT File No. 604361) and Craigie Bridge Reconstruction

Comments on Longfellow Bridge Rehabilitation (MassDOT File No. 604361) and Craigie Bridge Reconstruction

October 28, 2014

Richard Davey, Secretary
MassDOT
10 Park Plaza
Boston, MA 02116

Email: Richard.Davey@state.ma.us

Re: Longfellow Bridge Rehabilitation (MassDOT File No. 604361) and Craigie Bridge Reconstruction

Dear Secretary Davey;

We are writing to you regarding two outstanding issues for bicycle and pedestrian accommodation related to the Longfellow Bridge Reconstruction project. As we approach the annual Moving Together Conference which focuses attention on MassDOT’s support for and promotion of active transportation, we think this is a perfect time for MassDOT to demonstrate its commitment by taking positive action on these issues.

Craigie Bridge Reconstruction

From the outset, we have advocated strenuously for the provision of bicycle facilities on the Craigie Bridge/Dam. Many public hearings were held and DCR and MassDOT promised clearly and consistently that bicycle lanes would be established on the Craigie Bridge/Dam (aka O’Brien Highway between Land Boulevard and Charles Circle) as part of the Longfellow Bridge construction project, once the Longfellow Bridge was reopened. While we did not concur that the establishment of the bicycle lanes should wait – it would have been far better to construct them from the outset, a position we continue to maintain – we fully expect that the committed‐to bicycle lanes (or cycle tracks) will be constructed. To our frustration, we have learned that the latest plans do not include this work.

We would like your assurances that bicycle lanes will be included and we would also like to see the actual plans that include this promised component of the design.

Longfellow Bridge

We do not think that the proposed design connecting bicycle lanes on the Longfellow Bridge with Main Street in Cambridge is the safest option. The proposed design puts cyclists in an exposed, highly uncomfortable, and dangerous situation, situating them between two high‐speed travel lanes and having a long area with conflicts with turning vehicles. Many cyclists will not follow the path of travel, staying either in the right lane or traveling on the sidewalk risking conflict with pedestrians under these conditions.

We recognize that this design follows traditional AASHTO guidance, which was developed quite a while ago, without the benefit of the wealth and breadth of experience and design guidance we have today. Fortunately, there is a better solution, proposed by the City of Cambridge, which we endorse for its benefits to pedestrian, cyclist, and car safety. The updated proposal (design attached as Exhibit A to this letter) is demonstrably preferable from a cyclist’s perspective and is also beneficial for pedestrians. A clear, comfortable bicycle facility that accommodates all riders will minimize the likelihood that any cyclists will ride on the sidewalk. In addition, a better crossing facility that slows traffic and focuses the yield situation will help pedestrians crossing as well. MassDOT’s proposed design, which incorporates a lengthy car‐bike conflict zone and obligates cyclists to ride between two high‐speed traffic lanes, can be expected to place bicyclists at considerable risk and thus is likely to induce bicyclists to ride on the sidewalk or deter them from riding across the bridge westbound at all. We are concerned not only about the fact that the MassDOT design will encourage high‐speed traffic and make it less likely that motorists will yield to bicyclists, but also that they will be less likely to yield to pedestrians.

We would like MassDOT to modify the current proposal and adopt the Cambridge proposal instead. We would be happy to meet with you to review our concerns.

Very truly yours,

Steven Bercu, Boston Cyclists Union

Renata Von Tscharner, Charles River Conservancy

Steven Miller, Livable Streets Alliance

David Watson, MassBike

Wendy Landman, WalkBoston

Cc: Patrick Crowley
Patrick.Crowley@jacobs.com

Frank DePaola, MassDOT
frank.depaola@state.ma.us

Ken Lamontagne, MassDOT
kenneth.lamontagne@state.ma.us

Steve McLaughlin
Steve.Mclaughlin@state.ma.us

Mark Gravallese
mark.gravallese@state.ma.us

 

Exhibit A

City of Cambridge Proposed Design for Longfellow Bridge

Attached.

 

Comments on Arborway Crosswalk Improvements presentation

Comments on Arborway Crosswalk Improvements presentation

May 15, 2014

Commissioner Jack Murray
Attn: Office of Public Outreach
Department of Conservation and Recreation
251 Causeway Street, Suite 600
Boston, MA 02114

Re: Arborway Crossing

Dear Commissioner Murray:

WalkBoston attended the May 6th public meeting and has reviewed DCR’s Arborway Crosswalk Improvements presentation.

First, we are pleased that DCR has responded to community concerns regarding the crosswalk’s unsafe existing conditions. The research by Toole Design Group seems thorough and we support their analysis. I personally live just a few blocks from the Arborway crosswalk. I use the crosswalk regularly to visit the Arnold Arboretum and I drive on the Upper Arborway. I see firsthand the risks of the current configuration.

We agree with some of Toole’s recommendations:
‐ Relocate the fence to improve sight lines
‐ Upgrade WALK signal (on main Arborway) to a countdown signal
‐ Improve signage and pavement markings

However, we do not support the “tiered” approach as presented. We believe that a geometric modification must be made to ensure that vehicles slow down at the crosswalk. Anything less than this will not adequately protect park visitors from driver error (or their own error). Geometric modifications should be a top priority, not postponed till the 3rd tier. This location needs either:
‐ Installation of a Raised Crosswalk in combination with a curb extension, or
‐ Installation of a Chicane with a curb extension on the west side of the Upper Arborway.

The changes that the Town of Brookline made to Pond Avenue along Olmsted Park are a good model for raised crosswalks. Pond Avenue formerly had similarly hazardous crosswalks, somewhat greater traffic volumes, and chronic speeding. The Town installed 3 or 4 raised crosswalks between Route 9 and the Chestnut Street rotary; these force vehicles to really slow down at the crosswalks.

In addition we would like to see:
‐ Construction of a larger queuing area where pedestrians and bikes can wait on the median between the main Arborway and the Upper Arborway
‐ Installation of some physical barrier such as bollards to clearly mark the edge between the waiting area and the Upper Arborway roadway.

With changes to roadway geometry the installation of Rectangular Rapid Flash Beacons — while somewhat effective — would probably be unnecessary. (In the absence of geometric modifications, the RRFBs would be a necessity.)

Thank you for the opportunity to comment on Arborway crosswalk safety improvements. Please feel free to contact WalkBoston with any questions. We would be happy to meet with you about our recommendations.

Sincerely,
Don Eunson
Former WalkBoston Board Member and Jamaica Plain resident

cc: Patrice Kish, DCR
Julie Crockford, Emerald Necklace Conservancy
Jessica Mortell, EIT, Toole Design Group