Comments on the ENF for “The Point”

Comments on the ENF for “The Point”

March 16, 2015

Secretary Matthew A. Beaton
Executive Office of Energy and Environmental Affairs
Attn: Deirdre Buckley, Director, MEPA Office
100 Cambridge Street, Suite 900
Boston, MA 02114

RE: Environmental Notification Form
The Point, Boston

Dear Secretary Beaton and Director Buckley:

WalkBoston has reviewed the ENF for the license of DCR right-of-way to the developer of The Point for streetscape improvements. We applaud the effort by both public and private entities to improve the pedestrian environment and traffic safety in this rapidly developing area and want to ensure that development occurs in accordance with the city’s 2013 Complete Streets Guidelines. Our comments focus on the pedestrian environment and the need to integrate the project into its surroundings.

  1. We support replacing the current pedestrian island and free-flowing right turn lane with a landscaped plaza. Eliminating free flowing right turns will improve pedestrian safety and comfort. However, right turn traffic from Boylston St onto Brookline must be handled very carefully, with appropriate signage reminding drivers of their obligation to yield to pedestrians when turning, and as the intersection will remain large and complex, accommodations for visually impaired pedestrians including audible beacons to assist with orientation are crucial. The end of the plaza must have adequate space for a large number of pedestrians to wait for a walk signal, and signals should be timed to minimize queuing, particularly in conjunction with Fenway Park events.
  2. The removal of existing sidewalk parking (on both DCR and private property) along Boylston St to create a connected and well-maintained sidewalk will provide substantial benefits.
  3. The potential improvements that this project can bring to the area are substantial.The proposed development should follow City of Boston guidelines for the creation of wide sidewalks (as recommended in the Fenway-Longwood-Kenmore Transportation and Pedestrian Safety Action Plan). The new sidewalks are part of a long-range plan to change the overall design of buildings along Boylston Street and to provide a standard street wall of setbacks on the Boylston Street and Brookline Avenue frontages. The plan calls for wide sidewalks to alleviate the significant pedestrian congestion that results from games and other events at nearby Fenway Park, which is one-half block away.

The Proposed Conditions figure in the ENF shows a sidewalk surface that is only 5’ wide. This is not sufficient for the existing volume of traffic, much less for the increased foot traffic that is anticipated with the ongoing redevelopment of the area including The Point. The Boston Complete Streets Guidelines call for a preferred sidewalk width of at least 18’6” in a “downtown mixed use” zone, including at least a 10’ wide pedestrian zone. Every effort should be made to maximize usable sidewalk width to accommodate the anticipated volume of pedestrian traffic as well as meeting the needs of pedestrians with disabilities.

Thank you for the opportunity to provide comments on this aspect of this important project. We regret having missed the notification of the recently approved Notice of Project Change, but do feel that concerns with sidewalk width and traffic flow as it impacts pedestrians can still be addressed within the context of this license. Please feel free to contact WalkBoston with questions you may have.

Sincerely,

Wendy Landman
Executive Director

Heather Strassberger, AICP
Project Manager

Comments on Arborway Walking and Bicycling Improvements

Comments on Arborway Walking and Bicycling Improvements

March 2, 2015

Department of Conservation and Recreation
Office of Public Outreach
251 Causeway Street, Suite 600
Boston, MA 02114

Re: Improving parkways in the Emerald Necklace

Dear Commissioner Murray:

WalkBoston thanks you for launching the public process to improve safety and connections for people walking, bicycling and driving the section of the Emerald Necklace parkways between Jamaica Pond and the future Casey Arborway (under construction). As well as creating new, separated paths for pedestrians and cyclists, proposed improvements include replacing Murray and Kelley Circles with new, safer “roundabouts.”

We understand that your office was initially responding to concerns of the bicycling community. However, your staff and consultants, Toole Design Group, quickly saw that the challenges facing cyclists and pedestrians in this area cannot be fixed without also solving the existing problems of confusing and dangerous vehicle circulation and chronic speeding. So, the scope and objectives were expanded to all users.

WalkBoston is happy to support this comprehensive package of improvements. The safety of people who are walking or bicycling is absolutely dependent on changing the traffic circles. We feel that the proposed plan would both provide good vehicle access and accomplish the following benefits for walkers:

Improve connections between Jamaica Pond and the Arnold Arboretum for all park visitors, whether on foot or on bike.

Improve safety and reduce the number of accidents, injuries and deaths.

Improve quality of life for local residents.

Make the movements through the roundabouts clear and understandable and prevent speeding.

All of us are aware that the Arborway is unsafe. Between 2008 and 2012 alone there were 135 crashes on the Arborway, with more than 20 injuries. Murray Circle is especially dangerous because of high vehicle speeds and lack of clarity for drivers. Cars frequently jockey for openings and exits. No one wants to walk or bicycle across the roads that feed into Murray Circle!

Proposals

The process that DCR used to develop a set of “starter ideas” included both a public meeting and several meetings with local elected officials and pedestrian and bicycle advocates. The ideas presented by Toole Design at a public meeting on February 5 are impressive and promising.

• Separate pedestrian sidewalks and bike paths would be provided in the area

• The “circles” would be rebuilt as smaller, modern roundabouts that

o clarify vehicular movements

o make it difficult to exceed the “design speed” of 15‐20 mph

o provide multiple safe crosswalks (for people traveling in all directions)

• Provide raised crosswalks to improve pedestrian visibility and slow traffic

• Preserve the historic roads between today’s traffic circles including the allées of oak trees

• Reduce the number of traffic signals that interrupt vehicle flow (reduced from 5 to 1)

What is strikingly innovative about the current “starter ideas” is the concept of replacing the enormous Murray Circle two smaller roundabouts, side by side, to sort and channel traffic clearly and efficiently – while providing multiple crossings for bikes and pedestrians.

In addition the plan provides local residents on both sides of the Arborway with multiple ways to access their homes, while using the outer roadways for local access only, making them safer for all users.

Naturally, a lot of details need to be worked out in the next phase of design (e.g. How will blind persons navigate the roundabouts? How will snow removal be handled?), but the big ideas are solid. Your agency’s intention is to make this area more livable for residents and park visitors alike while continuing to accommodate vehicles.

Sincerely,

Wendy Landman
Executive Director

Comments on Dorchester Harborwalk

Comments on Dorchester Harborwalk

December 12, 2014

Secretary Maeve Vallely Bartlett
Executive Office of Energy and Environmental Affairs (EEA)
Attn: MEPA Office
100 Cambridge St., Suite 900
Boston MA 02114

RE: Environmental Notification Form for the Neponset River Greenway Segment 3 – MEPA #15286

Dear Secretary Vallely Bartlett:

The Neponset River Greenway is being constructed in several segments, each of which advances the goal of providing access along this regionally important waterfront. In this instance, the proposal will connect two existing walkways along Boston Harbor, with the ultimate goal of extending to the Neponset River walkways that reach the heart of Milton.

WalkBoston wholeheartedly support the proposal and commends DCR in its actions to further construction of waterfront facilities. We applaud DCR for its efforts to cobble together the essential connections to extend both the Harborwalk and the Neponset River Greenway. The walkway will offer an exciting experience, as it focuses on an area all of us have seen from the highway, and few have explored directly. The adjacent National Grid solar panels will be interesting to both children and adults and afford a point of interest unavailable along most pathways. We think the path will immediately become a remarkable highlight on the waterfront, attracting people to the new experience it will provide.

WalkBoston offers two suggestions that we hope DCR might still consider:

• Urban walking and running opportunities – Given the opportunities that the Greenway opens up for walking and running within the urban area, we suggest that DCR consider formalizing the running accommodation by including a soft surface trail adjacent to the paved path. This is particularly relevant because the path is located near neighborhoods that have the greatest need of facilities such as this for recreation.

• Width of the path – We note that the path is proposed to be built with a standard 10-foot width. We hope that the facility can be designed and constructed with adequate space to allow for future widening to provide adequate space for a mix of walkers, runners and bicyclists as its use grows over the coming year. DCR might consider an 11 – 12 foot width now to allow two side-by-side walkers or bicyclists to pass someone coming in the opposite direction.

Thank you for the opportunity to comment on this project. Please feel free to contact us if there are any questions.

Sincerely,

Robert Sloane
Senior Planner