Tag: Complete Streets Guidelines

Comments on the DEIR for the Redevelopment of the Government Center Garage MEPA #15134

Comments on the DEIR for the Redevelopment of the Government Center Garage MEPA #15134

July 11, 2014

Secretary Maeve Vallely Bartlett
Executive Office of Energy and Environmental Affairs (EEA)
Attn: Holly Johnson
100 Cambridge Street, Suite 900
Boston MA 02114

RE: Comments on the DEIR for the Redevelopment of the Government Center Garage MEPA #15134

Dear Secretary Vallely Bartlett:

WalkBoston reviews significant proposed development projects to provide comments about their impacts on pedestrians, and to suggest measures that may mitigate negative impacts or generally improve the projects for walkers.

We have reviewed the DEIR for the Redevelopment of the Government Center Garage and find exciting aspects of the project that will benefit walkers. These include:

Enhancement of a major pedestrian-transit hub
The East Parcel contains a high-volume transit hub with extensive pedestrian access. Access to the Orange and Green Line Haymarket Station access points will be maintained, as will access to the many MBTA bus services. Some of the difficult pedestrian crossings to the site will be improved by narrowing the width of the New Sudbury Street and thus the length of the crosswalks at its intersection with Congress Street.

The sidewalk through the East Parcel
The new pedestrian connection proposed for this project between Congress Street and Canal Street respects a traditional walking route between Downtown and North Station. This route will see more intensive use over the coming years as the significant developments at North Station and at this site occur, and the proposed design reflects the many circulation activities that are required of this parcel.

A new signalized intersection for Bowker Street
The proposed signalized intersection at New Chardon Street and Bowker Street is a welcome addition for pedestrians. The nearby intersection of New Chardon and Congress Street is skewed in such a way that the crossing is very long and is inconvenient for walkers going to the courthouse across the street. The new crosswalk makes the move much more convenient.

Improvements to on-site parking
As parking ceases to be the principal use of this site, the plan is much less auto-oriented. A reduction of number of available parking spaces reduces vehicles circulating around the site for access. This is accompanied by a reduction in the number of places where vehicles must cross sidewalks, enhancing pedestrian safety. The removal of garage access from New Chardon Street and its potentially busy sidewalks is a major pedestrian benefit of the proposal.

In addition to these project benefits, we also note several issues that need more attention.

Weather protection for walkers
The current garage has the unusual benefit of covering the bus waiting area and access to the transit station below, thus protecting walkers from rain and snow. Removing the garage and opening up the area for new development is beneficial to the project, and we believe that Figure 1.8 shows that the new structure will also provide cover for the bus station area. However, no cover for the subway entrance area is shown. The diagrams are less than clear on this point and we ask the developer to clarify how the bus waiting area and subway entrance areas will be designed and whether they will be covered.

Widths of sidewalks
Pedestrian improvements included in the project will improve safety at crosswalks and along the major streets. A note suggests that the current sidewalks widths are varied throughout the project, and are “rarely less than eight feet wide.” We trust that the standards for future sidewalk widths in this pedestrian-friendly project will be considerably wider and in keeping with the City’s complete street guidelines.

Services provided at the bus station
Six bus stops are proposed in the redesign of the bus station. Three of the stops will be in the area where they are now located, and three stops will be provided by a nominal widening at the side of the Central Artery Surface Road. The design and operation of the bus stops is critical for pedestrian safety and convenience. We ask that the proponent provide detailed diagrams and sketches of how this area will operate and ensure that bus patrons are well served by the new design.

Truck loading bays facing New Chardon Street
New Chardon Street is the major Downtown/North End access to and from the Central Artery (I-93). Four truck loading docks are proposed for the section of New Chardon between Congress Street and the on- and off-ramps leading to the I-93. The site plan suggests that trucks will back into these docks from the street travel lanes across the sidewalk on this side of the East Parcel. Unless use of the docks are restricted to the middle of the night it is difficult to comprehend how trucks backing into place across the sidewalk on a ramp to I-93 can be safely accommodated. We request that the proponent describe this element of the project in detail, including how pedestrian safety will be maintained.

Cut-ins on sidewalks
Cut-ins are proposed on three sides of the East Parcel and two sides of the West Parcel:
1. New Seabury Street near the Surface Artery
2. New Chardon Street near Canal Street
3. New Chardon Street near Bowker Street
4. Congress Street Near New Sudbury Street toward Leverett Circle
5. Congress Street near New Sudbury Street toward State Street

Although not well defined in the DEIR, a cut-in appears to be a pull out lane that reduces the width of the sidewalk to accommodate vehicles. The drawings in the DEIR show these indentations only vaguely but imply that a cut-in is a lane for vehicles separate from the adjacent thoroughfare but parallel to it.

The next stage of development of the project should include details of:

  •  Why the cut-ins are needed in each of the five locations?
  • How they are proposed to be used (back-in, parallel movement, etc.)?
  • How they relate to, or potentially conflict with, all major adjacent pedestrian flows?
  • Design guidelines that include minimum widths for adjacent sidewalks or crosswalks, as well as bollards or other protections for walkers. We are concerned that the sidewalks seem quite narrow adjacent to some of the proposed cut-ins.

We appreciate your consideration of our comments and look forward to your responses to them. Please feel free to contact WalkBoston with questions you may have.

Sincerely,

Wendy Landman                                 Robert Sloane
Executive Director                              Senior Project Manager

Comments on the Design for Commonwealth Avenue Phase 2A

Comments on the Design for Commonwealth Avenue Phase 2A

2 July 2014

Commissioner Jim Gillooly
Boston Department of Transportation
1 City Hall Square, Room 721
Boston, MA 02201-2026

Vice President Robert Donahue
Boston University Government & Community Affairs
121 Bay State Road
Boston, Massachusetts 02215

Re: Design for Commonwealth Avenue Phase 2A

Dear Commissioner Gillooly and Vice President Donahue:

We appreciate you taking the time to meet on Wednesday, June 25 to review the plans and process for Commonwealth Avenue Phase 2A. The redesign is an exciting opportunity to build a model street that will help achieve our collective goals for safety, enhanced user experience, and multi-modal transportation. These goals are in line with mode-shift, climate change, and public health goals set forward in Boston’s Complete Streets Guidelines, Bike Network Plan, and Climate Plan, MassDOT’s goals to triple biking, walking and transit mode share, and the goals set out in the Boston University Master Plan. The project provides a key opportunity to re-build Commonwealth Avenue to protect the needs of the area’s growing population of people who bike and walk, and address the decline of car traffic on the street and in the city.1

Unfortunately, the current designs for the project do not achieve these admirable project goals. Widening street lanes and adding fences encourages cars to move faster, making the street less safe and less comfortable for people. The plan to narrow the already overcrowded sidewalks does not serve the thousands of people who walk on Commonwealth Avenue every day. The current bike lane, which has been the site of many injuries and at least one fatality, is not significantly improved in the design, though there is a clear opportunity here to prevent more tragedies from occurring.

The safety of our community and the student population of Boston University and many other institutions in the area demands that the plans for Commonwealth Avenue Phase 2A be redesigned to protect people and meet the project objectives.

  • Increase the comfort and safety of pedestrians
    o  Minimize sidewalk narrowing to maintain adequate width for pedestrian volumes and allow businesses to maintain outdoor café seating
    o  Make crosswalks and curb ramps as wide as sidewalk walking zones
    o  Minimize tripping hazards from curb ramps, for example at the corner of Pleasant and Commonwealth Ave.
    o  Add curb extensions at all intersections
    o  Time the walk signals to allow for a single-stage crossing of Commonwealth Ave
    o  Make all walk signals automatic
    o  Add a mid-block crosswalk at Alcorn St/Naples Rd
  • Protect people biking and encourage more people to bike
    o  Explore all options to add cycle tracks (protected bike lanes) without narrowing sidewalks
    —   Parking-protected one-way cycle tracks
    —  Center-lane one-way cycle tracks (similar to those used on Commonwealth Ave in the Back Bay)
    o  Add bike boxes at intersections (traditional and two-stage turn queue boxes for those waiting to turn left)
    o Incorporate bike signals and leading bicycle phasing at intersections
  • Keep transit moving
    o  Add transit signal priority for Green Line trains and buses
    o  Add curb extensions at bus stops
  • Design for safe and steady traffic speeds
    o  Green Wave: coordinate traffic signals to bike speed (15 MPH)
    o  Make all travel lanes no wider than 10.5’ (MassDOT regularly approves this)

We understand that project funding depends on final designs by FY15. However, funding a design that does not meet the objectives of the City, the University, or Boston citizens is not a win for anyone and public controversy slows the process more than would design changes.

These designs have not had a true public process; LivableStreets Alliance, MassBike, and many other advocates and citizens submitted comments at the 25% design meetings, but heard no response and received no follow up information on the project. To redesign such an important and heavily-used street without an inclusive process is contrary to the City’s guidelines and goals.

We urge the City to engage in an inclusive public process to move plans from 25% to 100% design in order to build a street that we can all support. Past projects (including Connect Historic Boston) illustrate that the City can develop 0 to 100% design plans in less than a year.

We ask you to please respond to this letter by Wednesday, July 9, 2014 to let us know how you intend to address these concerns.

Sincerely,

Jamie Maier
Campaign Coordinator, LivableStreets Alliance

Pete Stidman
Executive Director, Boston Cyclists Union

David Watson
Executive Director, MassBike

Wendy Landman
Executive Director, WalkBoston

 

CC:
Nicole Freedman, Boston Bikes
Mike Wasielewski, BETA
Merrick Turner, BETA
Bill Conroy, Boston Transportation Department
Michelle Consalvo, Boston University
Ken Ryan, Boston University
Bill Egan, Boston Public Works Department

Attachments:

  • Comment Letter on Design for Commonwealth Avenue Phase2A
  • Marked up plans for Commonwealth Avenue Phase2A
  • Photo example of curb ramp/crosswalk as wide as sidewalk to meet high volumes
  • Photo example of cycle track
  • Bike Network Plan

Other Materials


Footnotes

 

Bike use has increased as much as 135% since 2007, pedestrian volumes have increased 80% since 2001, and car volumes have decreased as much as 31% since 1987 in the project area, according to the Boston University Master Plan (sections 8.5.1-8.5.6)