Build stronger, safer communities. Pedestrian activity puts more eyes on the street, making residential areas more neighborly and commercial districts more vibrant. Build stronger families. Walk with your children and their friends to school, or take a walk with your family after dinner. Families that walk together communicate better together. It’s easy to incorporate walking into your day. You can run your errands on foot, or a walk can double as a social activity – bring a family member, your dog, a friend or a coworker along.

Click for “Lawrence and Methuen Walking Map“.

Click for “Lawrence and Methuen Walking Map

 

 

Comments on the Expanded Environmental Notification Form for Wynn Everett

Comments on the Expanded Environmental Notification Form for Wynn Everett

July 12, 2013

Secretary Richard K. Sullivan, Jr.
Executive Office of Energy and Environmental Affairs (EEA)
Attn: Anne Canaday
100 Cambridge Street, Suite 900
Boston MA 02114

RE: Comments on the EENF for Wynn Everett, MEPA #15060

Dear Mr. Sullivan:

WalkBoston has reviewed the Expanded Environmental Notification Form for Wynn Everett, a resort proposed to include 2.9 million square feet of development along the west side of Lower Broadway (Route 99) in Everett, with frontage on the commuter rail line and an existing embayment of the tidal Mystic River. The proposal includes 3,490 structured parking spaces, and waterfront features that include a harbor walk and water transportation docking facilities. Principal access to the site is from two proposed intersections with Lower Broadway.

Traffic is significant: there will be an additional 29,384 new vehicles trips on a Friday, and 35,754 new vehicle trips on a Saturday, with the largest peak-hour volumes occurring on Friday and Saturday evenings. To accommodate this traffic, a new signalized intersection with Lower Broadway is to be constructed, connecting with an on-site boulevard. Lower Broadway is to be widened to allow two southbound right turns into the boulevard. Northbound left turns will be handled by a widening of Lower Broadway or a jughandle using Bow Street that would allow vehicles to turn to the south and enter the site.

 

A secondary service drive is contemplated that will intersect Lower Broadway north of the site. The intersection of this drive with Lower Broadway is also anticipated to be signalized.

Transit access will be provided at the Sullivan Square MBTA Station, 1.2 miles from the site. Transit stations at Wellington and Assembly Square are each 0.8 miles from the site, but currently have indirect pedestrian routings to the proposed resort. Shuttle buses to all subway stations have been proposed.

Our comments center on pedestrian access into and within the site. We are basically concerned that the location of the site and its considerable distance from centers of population and regional transit stations will result in motor vehicles providing the majority of the access to the site. Despite that concern, we have reviewed the proposal for individual improvements in pedestrian access associated with the project.

Off-site access to and from the proposed resort

Lower Broadway was recently reconstructed by the state as part of its enhancements to State Route 99, which included the addition of new bicycle lanes in both directions and the narrowing of existing sidewalks to permit expansion for other transportation modes. The proponent should detail the ways in which sidewalks will be upgraded for pedestrian access into the site. Sidewalk access should extend at least as far as the MBTA Sullivan Square Station, which will require the proponent to deal with that portion of the sidewalk within the City of Boston.

 

A new commuter rail station being investigated by the City of Everett on the commuter rail line that is adjacent to this site. To make this proposal a realistic option, the proponent should detail the ways in which rail connections to the site will be integrated with the resort, including major pedestrian routes into the heart of the site. A brief mention was made of an existing underpass; perhaps this could be upgraded to provide a connection to both sides of the track.

 

The new intersections with Lower Broadway for both the major boulevard access and the service access should be carefully planned to include safety measures for pedestrian crossings. This should include pedestrian phase timing at these and other signalized intersections constructed or modified as part of the proposal.

 

A potential connection between the site and the City of Somerville could be provided by access over the Amelia Earhart Dam. This connection would lead to both the new Assembly Square MBTA Station and to the Somerville/Charlestown Mystic River path network.

 

Riverfront access

The proposal envisions an extension of the Mystic River trail system from this site to the west. This extension involves going under the elevated commuter rail line along the River to reach Gateway Park and other open spaces planned for the banks of the Malden River. This will extend parks in appropriate riverside locations and in accordance with local and regional park planning.

One of the uses of the proposed trail system to the west is suggested to be a connection to allow access to and from the MBTA Wellington Station. This station is nearly a mile away, and it may be difficult to attract transit riders to use the trail, as access to it involves walking in open spaces where walkways are not readily visible from the street. The proponent should investigate making this walkway safe for access to its site with improved signage and lighting.

A portion of the embayment along the Mystic River is located inside the City of Boston and is occupied in part by public agencies. The proponent should explore with these agencies the potential for riverside access for pedestrians, in effect extending the Mystic River pathway network closer to Sullivan Square.

We look forward to the details of these and other elements of the plan. We appreciate your consideration of our comments and look forward to your responses to them. Please feel free to contact WalkBoston with questions you may have.

Sincerely,

Robert Sloane
Senior Project Manager

Comments on Conte School Renovation

Comments on Conte School Renovation

To: Amanda Chilson, MiM Coordinator, North Berkshire Coalition

From: Stacey Beuttell, WalkBoston

June 28, 2013

Re: Pedestrian issues to be considered in Conte School renovation

Dear Amanda:

Below are some initial thoughts on the site plan for the Conte School renovation. While there are some improvements that we would suggest to make the pedestrian environment safer, the proposed plan does improve the current conditions by replacing the surface parking in front of the school with a new playground. There is also improved separation between the vehicular drop-off zone and the thru-traffic along E. Main Street.

When reading this analysis, please remember that I have not visited the site, nor am I aware of whether or not I am evaluating the most recent site plans (see attached).

Some suggestions to consider:

• Students crossing E. Main Street at the major crossing point must cross two to three additional lanes of traffic in the drop-off zone before reaching the sidewalk nearest the playground area. The design drawings do not show cross walks, speed table, or bulb-outs in the bus and car drop-off areas. Buses and cars must not stop in designated crosswalk.

• Students walking from the north along the east side of E. Main Street must cross the car and bus dropoff zones before entering the school. We would suggest providing sidewalk along the northern edge of the parking lot and an alternative crossing point marked with a crosswalk from northern sidewalk to sidewalk adjacent to the bus drop-off. This crossing point would minimize the number of times these children will cross travel lanes.

• Traffic must be one-way into the school drop-off zone from the northern entrance along E. Main Street.

• Traffic leaving the parking lot should be directed through the drop off zones (at least during peak hours) to minimize potential gridlock and collisions.

• Crossing guards should be considered at all crosswalks adjacent to the school (both vehicular entrances and across the drop-off zones).

Please feel free to contact me with any questions about these suggestions. I look forward to talking with you again soon.

Stacey Beuttell, WalkBoston
Program Director

Comments on the ENF for The Boston Garden project

Comments on the ENF for The Boston Garden project

June 11, 2013

Secretary Richard K. Sullivan, Jr.
Executive Office of Energy and Environmental Affairs (EEA)
Attn: Deirdre Buckley
100 Cambridge Street, Suite 900
Boston MA 02114

RE: Comments on the ENF for The Boston Garden project, MEPA #15052

Dear Mr. Sullivan:

WalkBoston has reviewed the ENF for The Boston Garden project. We understand that the building project will be constructed on 2.8 acres of land fronting on Causeway Street and include:

WalkBoston is supportive of this development and considers it a critical location that requires close examination of pedestrian circulation, as it encompasses major pedestrian movements between regionally important city and suburban transit facilities and a major sports facility. In addition to pedestrians already using the site, the proposal will need to accommodate the movements of the new workers, guests and residents brought into the new buildings on the site as the project components are completed.

Our comments focus on pedestrian volumes to the site, circulation inside the grouping of new buildings and along the perimeter of the site, and the potential for improvements to the Charles River walkway behind North Station.

Pedestrian volumes to and from the site
Many residents of the region already pass through this site daily and for special events. The site is the location of commuter rail connections to the northern half of the metropolitan area, two major subway stations and the TD Boston Garden, home of the Bruins and Celtics professional sports teams. These pedestrian volumes need detailing and evaluation. Our review of the data led us to the following numbers:

In the morning, the combined total for arrivals by commuter rail coupled with patrons exiting the Green and Orange line subway station is thus a number that is around 43,000 2 pedestrians using the stations for transportation access or interconnections in and around the site. A similar number may exist for the afternoon use of the site.

These numbers have not been updated and are of course prior to the construction of office, hotel or residence buildings that will bring additional people to the site. In addition, the existence of the 19,600-seat TD Garden arena above the commuter rail station can create circulation difficulties when people attending events overlap with people leaving the city after work. With over 200 events each year at the TD Garden and limited on-site parking for event attendees, there are many opportunities for overlapping movements of large numbers of people moving into and through the site. It may be possible to have over 60,000 people on the site in the afternoon hours prior to a major event.

As preparatory steps for addressing environmental concerns surrounding this project, it will be important to closely examine the volumes of pedestrian traffic that move to and from the site each working day, and on days with special events in the TD Garden. Flows of pedestrian traffic that are deserving of special attention include movements between:

  •  the Green and Orange Line subway stations and the Commuter Rail Station
  • the Commuter Rail Station and TD Boston Garden
  • the Green and Orange Line subway stations and TD Boston Garden
  • Canal St. (used by downtown workers on foot) and the Commuter Rail Station
  • Canal St. and TD Boston Garden • Canal St. and the Green and Orange Line subway stations

These pedestrian movements deserve to be counted and evaluated for trends that indicate potential future use of transportation facilities at this site. Pedestrians going to or from the new on-site buildings will also be moving between:

  • the commuter rail station and the new buildings on site
  • the subway stations and the new buildings on site
  • Canal St. and the new buildings on site

These potential movements should be projected and evaluated in conjunction with the pedestrian traffic already using the site.

Pedestrian circulation through the buildings on the site
Pedestrians currently move into and out of the TD Garden building by using the east and west entrances on Legends Way and on the O’Neill Building pedestrian way. Plans show the intention of moving much of the pedestrian access between the subway stations and the TD Garden/North Station building below ground level. This will provide protection from weather conditions for walkers and is conceptually a major improvement for all.

The brief current outline of the plan calls for a passageway built under the large office tower to handle all pedestrian movements and connections on the site, located on the first basement level and connecting (in an undefined manner) between the subway stations and the proposed major pedestrian passage, to be called Champions Row. Escalators and elevators will be needed to make the connection fully ADA accessible and to speed the large volumes of pedestrians to their destinations.

It is entirely possible that this connection can be designed to handle the 43,000 users of transportation facilities on-site very well. However, it is equally possible that the volume of pedestrian traffic will be such as to thwart the good intentions of the proponent of this project. There are several possibilities for additional capacity to handle pedestrians in this important location under the office tower:

1. Addition of an escalator- and elevator-served access point leading into the present east entrance to the TD Garden/commuter rail station building (very much like the existing head house, but with a direct, covered connection into the building.)
2. A passageway between the subway station and the TD Garden/commuter rail station building that connects in several potential ways (all underground):
•     As a diagonal passageway between the MBTA undercrossing of Causeway Street and the proposed main stem of the project – Champion’s Row. This passageway should be sufficiently wide to handle the considerable traffic using it twice a day.
•     A passageway under the office tower could support small commercial/retail establishments that can quickly serve people passing through to make their commutes or to attend a large event.
•     A passageway could envisioned as a large food court or produce market serving all pedestrians passing through as well as those who will be working in or nearby after the new structures are built.
•     All proposed principal passageways, including Champions Row, should be unobstructed by escalators or elevators that may impede pedestrian movements.

There may be a desire to connect other buildings or uses planned for the site into this major pedestrian facility under the tower of the office building. If so, a major connection across Champions Row leading into the underground pedestrian facility would be needed to provide access for all of these pedestrian connections and services while also providing access for the four levels of retail attractions that are anticipated for the site

. Based solely on its need to serve so many access points for pedestrians on the site, Champions Row could conceivably become a much more significant and grander element of the site. Champions Row has been located to be on a direct axis between Canal Street and the entrance to the commuter rail station/TD Garden building. Like the major axis of an enclosed shopping center, it also provides direct access to the surrounding transportation facilities and the TD Garden. Alternatively, it could become a part of an imposing railroad station with retail facilities surrounding it and even below it (like South Station, perhaps, grand but laid out as a small Grand Central Station). In either event, the space could become a local landmark and meeting place for residents, commuters and event attendees.

Pedestrian access on the perimeter of the site
Because the new facilities back up to the TD Garden, three sides remain to be served by sidewalks – along Causeway Street, Legends Way and the O’Neill Building pedestrian way.

1.   Causeway Street
Wide sidewalks are planned in keeping with the city’s Crossroads Project plans for Causeway Street. Street furniture and trees will be added in keeping with this plan. On the site, the façades of the new buildings will be lined up with the O’Neill Building to present a uniform appearance along the streets. A number of small and large retail facilities will have access to and from the sidewalks, and access to the three large buildings planned for the site will also be focused on the Causeway Street sidewalk. The sidewalk will not be interrupted by access ramps into the on-site garage, as these ramps are being located at the edge of the site adjacent to the Central Artery, and will supplement the existing ramps that are located at the rear of the TD Garden Building.

However, the diagrams show a loading platform near the proposed hotel building that will interfere with pedestrian traffic on the sidewalk significantly. This loading platform is a potential hazard for pedestrians on the Causeway Street sidewalk, particularly if service trucks back into the site from the street.

To be fully supportive and attractive to pedestrians, the new buildings could be designed to attract and provide interest for passers-by, using strategies such as:
•    Maximize the number of retail outlets facing the sidewalk by using narrow frontages for business facilities
•    Introduce sidewalk cafes, restaurants or bars
•    Provide canopies along the building frontage to protect walkers
•    Avoid intimidating pedestrians by the overwhelming scale of proposed buildings. The proposed façade for the Causeway side of the site is about three blocks long, and has been broadly designed to be a uniform building of four stories topped by towers. The four-story building could be intimidating for pedestrians – it is a very large and long building. Its façade could be articulated to show connections with the streets of the area, as is currently diagrammed for the three large towers planned for the site that line up precisely with Canal Street and Friend Street. The four floors of the building complex that are designed for retail could also reflect these breaks while retaining the alignment with the O’Neill Building, either physically or by using varied building materials.

2. The pedestrian passageway at the O’Neill Bldg.
This walkway should be treated qualitatively as handsomely as the Causeway Street frontage. It has become a major entrance for pedestrians and will continue to provide major access to the commuter rail station and the TD Garden. It could also become more interesting for walkers, if cafes or other retail establishments were added. It has the advantage of the statue of Bobby Orr which is a dramatic addition of great interest to pedestrians using the site. A canopy for the length of the walkway would be of great service to the pedestrians using the walkway for access to the TD Garden/commuter rail building.

3. Legends Way
This street will be of limited use for pedestrians, except to provide access to the east entrance into the TD Garden/commuter rail station building. Access for users of MBTA’s The Ride will be retained. Opportunities for retail uses appear very limited, but should be considered. This is another location where a canopy could be of considerable use to passengers waiting for The Ride.

4. The Riverfront walkway along the Charles
At the rear of the commuter rail station, the tracks serving the terminal narrow down to enter two bascule bridges across the Charles River. At this location, Central Artery plans included a bridge on the North Bank crossing over the tracks, a bridge on the South Bank also over the tracks, and a bridge that would be cantilevered or attached to a bascule bridge. The North Bank Bridge is now completed and in operation. The bascule bridge walkway is in design. The South Bank Bridge remains to be designed and constructed.

As a positive improvement to the environment of this project and as mitigation for some of the anticipated impacts of its construction, the proponent and the MBTA have begun discussions of constructing the South Bank Bridge. This positive development is very exciting, as it would complete the major interconnection of Charles River walkways on both banks, along with connections into the downtown Boston Harborwalk and the Charlestown Navy Yard.

Construction of the South Bank Bridge will involve examination of the potential building methods within a narrowly defined space on both sides of the tracks. On the east side of the tracks a sidewalk follows the boundary of the MBTA trackage at the river’s edge to a dead end at the bascule bridge. This sidewalk may become an approach ramp for the South Bank Bridge. However, there are difficulties in constructing the bridge on the west side of the tracks that are likely to require significant work in examining possibilities. The rewards of designing and constructing this bridge will have regional impact because of its connection to metropolitan-scale pedestrian facilities.

We appreciate your consideration of our comments and look forward to your responses to them. Please feel free to contact WalkBoston with questions you may have.

Sincerely,

Robert Sloane
Senior Project Manager

Arlington Massachusetts Avenue Redesign Regional Advocate Comment Letter

Arlington Massachusetts Avenue Redesign Regional Advocate Comment Letter

To: Richard Davey

Massachusetts Secretary of Transportation

From: Phil Goff, Co-Chairman, East Arlington Livable Streets Coalition
David Watson, Executive Director, MassBike
Wendy Landman, Executive Director, WalkBoston
Charlie Denison, Advocacy Committee Chair, LivableStreets Alliance
Chris Hart, Director of Transportation Projects, Institute of Human Centered Design
Pete Stidman, Executive Director, Boston Cyclists Union

Re: Arlington Mass Ave Corridor Plan redesign project
Date: March 28, 2013

Dear Secretary Davey:

As a group of neighborhood and regional advocacy organizations that promote Complete Streets, safer walking and bicycling, and sustainable transportation planning policies, we are unanimous in our support of the Town of Arlington’s current plan for the reconstruction of Massachusetts Avenue from the Cambridge line to Arlington Center. The Town’s current plan includes the reconfiguration of the de facto four-lane street into a three-lane roadway with striped bike lanes, wider sidewalks, improved crosswalks with refuge islands and an assortment of streetscape enhancements. We are collectively writing to express our concern that MassDOT may give too much weight to a non-binding ballot question on the local ballot in Arlington that contradicts state policies and guidelines.

Public support for the Mass Ave project is strong throughout East Arlington and among a number of businesses in the Capitol Square business district. This has been made clear in numerous meetings in the past three years, including MassDOT’s 2011 25% design hearing where over 60% of the public comments were made in support of the three-lane plan. More recently, MassDOT’s Feb 26th 75% hearing drew hundreds of supporters from throughout the Town and public comments in support ran 3:1 versus those opposed. The Arlington Board of Selectmen unanimously supports the plan and would like to see the four-and-a-half year process come to a conclusion soon.

Similar to other projects that promote a reduction in the available space for motor vehicles, opposition has formed among some neighbors and businesses. For the past four years, the opposition group has become more entrenched and has tried to delay or stop the project on numerous occasions. Most recently, opponents to the current three-lane plan gathered enough signatures to place a non-binding referendum on the April 6th ballot for Town elections. The question simply asks if Arlington voters desire to “retain four lanes on Mass Ave in East Arlington as currently practiced.”

The question discusses none of the safety benefits of the three-lane plan, whether four lanes would accommodate MassDOT design guidelines or the potential impact on funding of a “yes” vote. While we respect the use of a ballot referendum to guide local decision-making, the simplicity of the question is an inappropriate response to a complex roadway design and engineering project. A resulting “yes” vote to recommend a four-lane plan would contradict MassDOT guidelines for safe bicycle accommodations and puts numerous pedestrian safety features at risk. Four travel lanes would also contradict the goals set forth in the Healthy Transportation Compact, the GreenDOT policy, the Governor’s “Way Forward” and the Mode Shift Goals to triple the share of walking, bicycling and transit use by 2030.

The Board of Selectmen has made clear their support for the project and, short of an extremely-unlikely lopsided vote, will continue to support a three-lane design in accordance with state policy and guidelines. However, in both individual meetings and at the 75% hearing, Town officials and community members have received mixed messages from MassDOT staff about the potential results of the referendum. This included hints that a majority “yes” vote for four lanes could endanger state support and funding for the current three-lane plan. This possibility is a serious concern to our organizations as a worrisome precedent to future roadway reconstruction projects that incorporate pedestrian and bicycle enhancements that may be controversial.

In conclusion, we strongly encourage MassDOT to maintain support and full funding for the reconstruction of Mass Ave in Arlington no matter the results of the simplistic non-binding referendum. To abandon support would send a message that MassDOT is unwilling to stand behind its own Complete Streets policies, guidelines and goals, and would encourage opposition to Complete Streets in projects throughout the Commonwealth.

CC: Tom Broderick, Chief Engineer, MassDOT
Kim Sloan, Project Manager, MassDOT
Senator Ken Donnelly
Representative Sean Garballey
Representative Dave Rogers
Kevin Greeley, Chair of the Arlington Board of Selectmen Adam Chapdelaine, Arlington Town Manager Congressman Ed Markey