WalkBoston has followed the progress for the Boston Common Master Plan over the last few years, and we appreciate the time and attention that has been placed on creating an inviting public realm and an enhanced sense of arrival and safer crosswalks at all entrances. We’ve highlighted some sections from the draft report below.

Park Entrances: 

  • We encourage the Parks Department to work with the Transportation Department to ensure the important mid-block crossing of Charles Street at Mayor’s Walk is a raised crosswalk; the draft language hedges in saying it is “A large crosswalk, possibly elevated.” Many people drive way too fast on Charles Street; a raised crosswalk will help calm traffic between two significant parks. 
  • The Shaw 54th Memorial was left out of an earlier draft since it is not accessible from the Boston Common (and due to restoration work by the National Park Service); we are pleased to see that an accessible entrance to the Common from the Shaw 54th Memorial is incorporated into the draft as an early action project.
  • We are pleased to see an early action project for Park Street Station’s plaza will further develop a proposed grading scheme to create an accessible path similar to how Government Center combines stairs and ramps. We had concerns with the previous draft that seemed to frame a direct route down the hill near Park Street onto the plaza at a location near the curbs of Tremont Street. 

Seating & Benches:

  • The report states there are approximately 238 benches in different states of repair today on the Common, down from 390 at the time of the 1996 Management Plan. We are very pleased to see a commitment to both increasing the number of benches available in the Common and providing a higher level of accessibility for existing and new locations, including prioritizing bench locations with new tree plantings for shade. 
  • It is noted that “Armrests should be considered as an accessibility measure; armrests help the elderly and all park users more easily stand up from a seated position. In this way, benches can be used to further the social agenda of the park, making the experience more equitable and accessible for all visitors.” During our Age-Friendly work in Boston with the Age-Strong Commission, participants have expressed that benches with arms help them both with sitting and standing back up from a bench. 
  • We encourage you to look at the improvements the City of Boston made to Cassidy Playground in Allston-Brighton. The redesign created many different seating options, including benches with and without arms, that give park users the opportunity to find seating that works best for their needs at the time. We hope that you can find a solution that meets the needs of older adults without creating hostile architecture. 

Safer bike facilities to reduce bike/ped conflict:

  • Thank you for the continuation of the current policy of excluding bicycle riding in the park. We appreciate the support for the Transportation Department’s work to create better bike facilities on the streets surrounding the Common. If those lanes are a safe option, more people biking will use them. This policy assures the safety and calm of the paths for pedestrians and avoids conflicts between walkers and cyclists. 

Thank you for the opportunity to comment.

Brendan Kearney
Deputy Director of Advocacy, WalkBoston

Comments on South Boston Waterfront Transportation Center EEA 8505

Comments on South Boston Waterfront Transportation Center EEA 8505

September 12, 2016

Matthew Beaton, Secretary
Executive Office of Energy and Environmental Affairs
Attn: MEPA Office Analyst: Page Czepiga EEA 8505 and 13367
100 Cambridge Street, Suite 900
Boston, MA 02114

Re: South Boston Waterfront Transportation Center EEA 8505 and 13367

Dear Mr. Beaton,

WalkBoston appreciates the opportunity to comment on the current proposal for the South Boston Waterfront Transportation Center. We have focused on pedestrian issues associated with this project.

This proposal is quite forward-looking for pedestrians who will be using the facility and/or passing through the site. Users of the Center will be served by pedestrian paths through the site, by the adjacent MBTA Silver Line World Trade Center station and by parking on 9 levels with pedestrian access via elevators and stairs to both D Street and the World Trade Center Avenue Viaduct. As the nine parking levels will be partly located below and partly above the principal level of the Center, the principal pedestrian movements will be centralized at a midway garage floor that corresponds to the level of the World Trade Center Avenue Viaduct. Pedestrian access between transportation modes and exits into the surrounding area will take place primarily at the level of the viaduct.

Several significant pedestrian facilities have been proposed at the viaduct level to integrate the Center into the Seaport and provide connections to business centers and activities in the area, as well as transportation modes that are focused in the area. These viaduct level facilities include:

1. A garage floor that also serves a concentration of a large number of pedestrian movements made at this level.

  • Pedestrian paths could be marked or painted for walkers on the garage floor or developed with imaginative lighting. These walkways would make walking through this large garage safer for walkers by providing a clear path and a physical reminder and warning to drivers. The viaduct level in particular will have many pedestrians.
  • It would be helpful to begin the proposed wayfinding system within the garage with emphasis on information at the elevators and at the viaduct level of the garage. A substantial installation of signs could direct arriving patrons from parking locations toward appropriate exits and show the multiplicity of potential destinations that can be reached by each of the major exits.
  • Smart phone apps could be developed to provide detailed information for pedestrians to use on their phones or pads to find specific routes to desired destinations.

2. A proposed pedestrian bridge between the Transportation Center and the existing Waterside Place building for residents who will be using the garage. The bridge will be connected into the pedestrian network provided for the viaduct level of the Center.

  • Although the bridge will not be used for access between the Center and Congress Street by non-residents, it should be integrated with the wayfinding and pathway system devised by the proponent.

3. A midblock pedestrian walkway between D Street and the World Trade Center Avenue Viaduct on the south side of the Center structure is proposed to aid pedestrians in reaching the variety of destinations around the Center. The walkway provides pedestrian connections from the World Trade Center Avenue Viaduct and the John Hancock and other buildings along D Street. The walkway, to be built primarily at viaduct level (although it slopes down to meet the grade of D Street), will be approximately 18’ wide, well-lighted and roofed for the majority of the distance between the streets that act as a boundary of the Center.

  • This long (xxx) walkway does not seem to be overlooked by any people other than those on the walk itself. We request that MassPort provide some details about how the security of walkers will be assured.
  • This walkway should be weather-protected on the side facing the MassPort Haul Road.
  • The walkway should be signed to guide pedestrians to destinations on either side of the Center. Signage should be integrated into the overall wayfinding network for the Center and proposed networks for the surrounding area.
  • The walkway could be enhanced by the addition of facilities such as benches for walkers and intervening electronic posters or interactive displays to enliven the area.

4. Pedestrian plaza facing D Street. The D Street (east) side of the Center will include a generous landscaped plaza as a major contribution to upgrading the current appearance and softening the edges of the structure.

  • This plaza should also be signed and designed with paths to guide pedestrians to destinations on either side of the Center. Signage should be integrated into the overall wayfinding network for the Center and the district.

5. Pedestrian plaza facing World Trade Center Avenue Viaduct. A large public open space will be provided on the viaduct (west) side of the Center. It will provide space for direct access from the viaduct into the Transportation Center, with connections into the adjacent MBTA World Trade Center Station, a shuttle bus drop-off location on the street, landscaping, bicycle parking (and possibly repair) and information kiosks. Significantly, it will include a covered walkway between the viaduct and the Center. This covered walkway will become part of an extended covered pedestrian facility that will extend between Congress and Summer Streets.

  • The new covered walkway will be a major feature of this project and a harbinger of the future pedestrian network that will extend beyond this location and connect between both the World Trade Center and the Boston Convention and Exposition Center. It should protect pedestrians in all weather conditions.
  • The covered walkway should also be an integral portion of the wayfinding network for the Seaport area. A central focus could be an interactive display that helps walkers find their desired destinations, and tells each how long the walk will be for them in the minutes 3 required to make the connection. The proposal calls for displays of real-time modal availability and schedule information, interactive kiosks and bicycle parking and possibly the availability of pedi-cabs.
  • This large setback seems to set the stage for a future land use that faces World Trade Center Avenue. We think that lively uses along the Avenue would be a good addition to the area’s pedestrian environment.

WalkBoston is excited about the generous additions of elements in this project that will enhance and encourage pedestrian movement throughout the area. Thank you for your consideration of our comments.

Sincerely

Bob Sloane
Senior Planner

Comments on the Final Environmental Impact Report for the Redevelopment of the Government Center Garage, MEPA #15134

Comments on the Final Environmental Impact Report for the Redevelopment of the Government Center Garage, MEPA #15134

October 24, 2014

Secretary Maeve Vallely Bartlett
Executive Office of Energy and Environmental Affairs (EEA)
Attn: MEPA Office EEA #14069
100 Cambridge St., Suite 900
Boston MA 02114

RE: Comments on the Final Environmental Impact Report for the Redevelopment of the Government Center Garage, MEPA #15134

Dear Secretary Vallely Bartlett:

WalkBoston has reviewed this document to identify potential implications for pedestrians. We offer the following comments.

Sidewalk Widths
The FEIR contains detailed drawings of sidewalk widths at all locations, and WalkBoston believes that the widths are completely adequate, except as noted below at the outer bus bays facing the Greenway. On map B.2 – Conceptual Improvement Plan, Bus Bays #4, 5, and 6 are shown with sidewalks that are only 8.5 feet wide, compared with those of Bus Bays #1, 2, and 3, which have 15 foot sidewalks without encroachments. Bays 4, 5, and 6 also appear to have a line of windbreaks that encroach on the 8.5’ width. No benches are shown, but the text response to our DEIR comments states that, “Additional measures, such as windbreaks and seating areas will also be incorporated into the reconfigured Haymarket Bus Station area.” The relatively narrow sidewalk coupled with windbreaks and potentially benches as well, could make the sidewalk uncomfortably narrow and crowded at Bays 4,5, and 6. We urge the proponent to consider a modest re-distribution of space to provide wider sidewalks at these bus stops.

Truck loading bays
WalkBoston continues to be concerned about loading docks that require trucks to back from the major adjoining streets into the building. Two of these streets are major access ways into Central Artery (I-93) and will require very careful operation to be safe for both pedestrians and other vehicles. Clear and enforced management should stipulate that they will not be used, except in emergencies, during daytime working and peak travel times.

Cut-ins on sidewalks
Cut-ins proposed on three sides of the East Parcel and two sides of the West Parcel should also be managed to reduce conflicts with pedestrians as loading and unloading occurs from vehicles. Management of the site should ensure that use of the cut-ins for deliveries (not for guest or resident drop off) is minimized during busy portions of the day or evening.

Thank you for the opportunity to comment on this important project. Please feel free to contact us if there are any questions.

Sincerely,

Robert Sloane
Senior Planner

Comments on ENF for Caesars Resort at Suffolk Downs

Comments on ENF for Caesars Resort at Suffolk Downs

March 26, 2013

Secretary Richard K. Sullivan, Jr.
Executive Office of Energy and Environmental Affairs (EEA)
100 Cambridge Street, Suite 900 Boston MA 02114

RE:     Comments on ENF for Caesars Resort at Suffolk Downs – EEA #15006

Dear Secretary Sullivan:

WalkBoston has reviewed the ENF for Caesars Resort at Suffolk Downs. We find agreement with the general design, as it seems directed toward providing safe facilities for pedestrians. A number of design details should be more closely investigated as part of the DEIR. Our comments about those details follow.

Underlying Assumptions
Many of the patrons and staff of the casino complex and racetrack will arrive on foot from transit stations or parking lots. Thus walking should be a significant element of the project design, coordinated with vehicular routes to minimize potential conflicts. Walking, transit and bike use should be maximize d in keeping with the Commonwealth’s goal of tripling the share of walking, biking and transit use. Access to and from the two MBTA stations and the Route 1A bus lines, and access between distant parking locations and the casinos and the racetrack are the primary routes to be addressed. Walking access between the site and adjacent residential areas should also be addressed.

Good information about the projected volumes of pedestrians (and bicycles) should inform the design and size of facilities.
For example, the ENF states that most employees will come to the site via public transportation. While not explicitly stated, we would anticipate that nearly all would walk from the MBTA stations into the site (unless shuttle service is provided). Because the Suffolk Downs Station is considerably closer to the proposed buildings than Beachmont Station, it will likely attract more users. The walkway from the station into the site should be designed to accommodate the anticipated volume of walkers (and bicyclists if they will use the same route) and the projected volumes should be included in the DEIR.

Overall Design Issues to be addressed
The design of walkways and walk routes should be attractive, include high quality landscaping, and feel inviting both day and night, winter and summer. Designs should include:
– A network of short distance walkways to encourage people to walk on site.
– Lighting for safety, using designs that do not spill into residential areas or obscure the night sky
– Safety and security especially given late night operations for employees and patrons, where there are fairly long walks such as the one to the Suffolk Downs MBTA station
– Benches
– Smooth surfaces on all walkways
– Year round maintenance including snow shoveling
– Shade while walking to the casinos and hotels
– In New England, inclement weather is inevitable, suggesting the possibility of providing shelters or coverings along walkways, or alternative means of reaching destinations, such as a shuttle bus service
– Wayfinding for pedestrians – Signage should be employed as fully as possible to help pedestrians find their routes within this very large site. Signs would also encourage the use of MBTA bus routes and subway facilities, and should be used to designate access points in the event an on-site bus shuttle service is provided. Other off-site locations of interest should be included, such as the Belle Isle Marsh Reservation, Revere Beach and potentially the Target/Super Stop and Shop complex , the racetrack’s horse barns and other sites that might improve the experience of nearby residents as well as patrons of the casinos, the racetrack, and the hotels.
– Parking lots should be designed attractively, with trees and with defined walking paths that are separated from moving vehicle areas within the lots

Multi-use path design.
The paths on the site that are walking/biking multi-use paths should provide appropriate widths to allow for safe shared use. MassDOT standards (Mass Highway Department Project Development and Design Guide, 2006), call for multi-use paths to be 10—14 feet wide to accommodate both pedestrians and bicycles, and for wider facilities if substantial volumes of foot and bike traffic are anticipated.

Tomasello Way/Rte 1A intersection and Tomasello Way Design
Bus service
Bus service along Rte 1A is already substantial. Routes along the roadway connect Salem Center, Marblehead and Peabody Square to Haymarket and Downtown Crossing – 6 bus routes in total. Well-designed and highly-visible bus stops, along with weather-protecting shelters, should be included in the revamping of the intersection of the Tomasello Way/Rte 1A intersection.
Signals and crosswalks
In keeping with the intersection’s importance as the front door of the proposed development, the intersection will need to be fully signalized for safety for all users, including pedestrians who will be crossing Rte 1A to and from the new bus stops and shelters. In the re-signalization of the intersection, pedestrian count-down signals should be employed.
Access between the intersection and the on-site facilities
The proposal includes a major pedestrian way leading from the intersection of Tomasello Way and Rte 1A into the main entrance to the casinos, the racetrack and the hotels. It appears to be useful and attractive, but it must be made safe for walkers and is worthy of significant improvements to make it safe. According to the preliminary drawings, the walkway will be located in the median strip of the rebuilt south portion of Tomasello Way. This is a formal design that could be handsome, but it results in a strip of walkway in the median that could be difficult for walkers to access, because it requires them to cross roadways on both ends of the walkway – near Rte 1A and at the casino/racetrack entrances, as well as at intermediate locations in between – five crosswalks in all. A better solution might be to have the pedestrian way located on the south side of Tomasello Way, with more direct access across the street at a point where the walkway is closest to the casino. This would reduce potential pedestrian/vehicle conflicts along the full length of this stretch of Tomasello Way.
Amenities along Tomasello Way 
Pedestrians walking via Tomasello Way have a relatively long walk between Rte 1A and the site (roughly equivalent to 3-4 city blocks). The preliminary drawings show lines of trees that will be very appropriate to make a pleasant walk. Seating along the way would also make the route more attractive and allow people to rest as they make their way to the casinos or the racetrack.
A sidewalk connecting Tomasello Way and Waldemar Avenue in Orient Heights
A wholly new but short on-site sidewalk connecting Tomasello Way and Waldemar Avenue would allow Orients Heights residents to reach the bus stops at the intersection of Rte 1A and Tomasello Way, and to be able to walk to the casinos or the racetrack.
A roadway connecting Tomasello Way to Waldemar Avenue in Orient Heights
Consideration of a sidewalk connecting Tomasello Way and Waldemar Avenue should include examination of a future road connection as well. A new, relatively short street to link Tomasello Way to Waldemar Avenue could reduce problems at the intersection of Waldemar Avenue and Route 1A near the Tomasello Way entrance to the site because it would allow Orient Heights access to be diverted to the Tomasello Way entrance to the site. The connection could include options for improving the safety of nearby residents:
– Waldemar Avenue could become a dead-end street before reaching Rte 1A; or
– It could be made one-way inbound toward the residences; or
– It might be connected to Vallar Road if gradients are favorable.

The continuation of Tomasello Way to the Suffolk Downs MBTA station
A driveway currently exists along the proponent’s property line between the Rte 1A entrance to the site and the small turnaround space in front of Suffolk Downs T station. The west half of this route has been covered above. However, the future of the east half of the driveway is unclear, even though it could be used for vehicular and pedestrian traffic as part of the larger plan. An explanation should be provided as to:
– Whether this driveway will become an access roadway providing service both to the south entrance to the casino, and to the Suffolk Downs MBTA Station.
–  Whether this driveway will be extended to connect into the local roadways of Orient Heights, such as Waldemar Avenue, Walley Street and Bonito Square. This connection could relatively easily reach Bennington Street as well, and could become a major route for vehicles entering or leaving the site.
–  Whether an improvement is planned for the pedestrian component of the service plaza at the MBTA Station.
–  What the pedestrian connections along this roadway will become, as it provides a major walkway between the MBTA station and the casinos and hotels. This connection might also be used to enhance direct access from neighborhood walkways into the station.

Pedestrian access from off-site locations
Pedestrian access between Orient Heights and a potential Route 1A bus stop at Boardman Avenue.
A partial interchange is proposed for the intersection of Boardman Avenue (Route 145) and Route 1A. The proposal calls for a northbound overpass above Rte 1A to pass over the turning between Rte 1A and Boardman Avenue. The overpass design and focus of turning traffic at the intersection suggests some difficult crossings for pedestrians from Orient Heights. Bus stop access for pedestrians should be explored as part of the proposed partial interchange. It may be possible to link Boardman Street access to the bus stop at Tomasello Way.
Pedestrian access between Orient Heights and the Target/Super Stop and Shop complex
The ENF notes that walkers from Orient Heights need to cross the Suffolk Downs site to get to the shopping complex located near the intersection of Tomasello Way and Furlong Drive, which are important businesses for Orient Heights residents to use. Data support-ing this suggestion would be useful. The multi-use path along Tomasello Way will improve this walk. From a pedestrian point-of-view, the suggested location of the walkway on the east side of Tomasello Way results in pedestrians from Orient Heights crossing at least 6 streets on route to the shopping complex, unless they follow the alternative walking route that hugs the buildings. The proponent should examine whether the walkway could be moved to the west side of Tomasello Way to reduce the number of crossings. Pedestrians walking along Tomasello Way should also be protected from walking through either of the two roundabouts at the approach to the hotels and casinos. Roundabouts are not very safe for pedestrian because of the potential conflicts with turning vehicles.
Pedestrian access between Crescent Heights and the Target/Super Stop and Shop complex
Residents of the Crescent Heights neighborhood at the north edge of the site could also reach the shopping area via the Tomasello Way walkway.
Racetrack walkway to the Target/Super Stop and Shop complex
The plan includes a walkway between the racetrack and the Target/Super Stop and Shop via the edge of the northern parking lots. The intersection of this walkway and Tomasello Way should be moved slightly to align with the front entrance to the shopping complex. The volume of foot traffic at this intersection may be low, but further exploration may suggest the need for a traffic signal with WALK signals.

Potential shuttle bus service
Shuttle buses should be considered to help people get around and to provide options during inclement weather. Options for shuttle bus stops include main entrances to the casino and race track, the Suffolk Downs and Beachmont MBTA stations, bus stops on Route 1A at Tomasello Way, the bus stop on Winthrop Avenue, and for access to the more remote parking areas. Facilities to support shuttle bus service may include the addition of a turnaround area in front of Suffolk Downs MBTA Station and a u-turn on Tomasello Way just short of Route 1A. Shuttles may also be useful to serve future night transit service on the Blue Line and elsewhere.

Local Community Benefits – pedestrian improvements at other locations
The ENF includes suggestions that certain improvements outlined by the Lower North Shore Traffic Study of 2000 could be included as part of the mitigation for the construction of this facility. Although no detail has been supplied on these locations, they appear to include intersections at Route 16 at Winthrop Avenue/Harris Street, the vicinity of the Beachmont MBTA Station in Revere, in the vicinity of Route 16/Route 1A/Bell Circle in Revere, and, in East Boston, at Bennington & Saratoga Streets at Orient Heights MBTA station and Boardman St. in East Boston. Many of these improvements have been requested by the affected communities and will need to be detailed in further submittals to show potential impacts on pedestrians.

We appreciate your consideration of our comments and your responses to them. Please feel free to contact WalkBoston with any questions you may have.

Sincerely,

Wendy Landman
Executive Director