Tag: walk

Event: Charles River “Throat” Site Walk

Event: Charles River “Throat” Site Walk

RSVP now and save the date – September 12, 2018 5:30pm – join WalkBoston, the Charles River Conservancy, Charles River Watershed Association, and the Esplanade Association for a site walk of the Charles River path’s “Throat” area. We’ll meet at ‘BU Beach’ (grassy area on Boston University Campus near Marsh Chapel) in front of the pedestrian overpass to the Charles River path, before crossing over to the river side and gathering in an accessible location for very brief presentations. From there, we’ll walk to the first overlook to experience the narrow path and un-parklike existing conditions along the path and view the eroded river bank, before returning to the gathering area for questions and next steps.

This will give you a better understanding of why this narrow stretch has an outsized role in MassDOT’s Allston I-90 Interchange Project — and how it could help #UnchokeTheThroat in the years to come.

Getting to the meet up location by transit:

Green Line ‘B’ Branch – BU Central stop – the roundtrip walk from this location is 1 mile.
#57/57A Bus – Commonwealth Ave @ Granby stop

PLEASE NOTE: The pedestrian bridge from BU Beach to the Charles River Path includes stairs; accessible access to the path is at the Mass Ave Bridge (about 3/4 mile away). The #1 Bus has the closest transit stop to this entrance (~1 block away, Mass Ave @ Beacon stop).

More details to be added: RSVP below on Eventbrite or on Facebook

Allston/Brighton Mobility Study Open House later that evening!

After the walk, make sure to attend the BPDA’s Allston Brighton Mobility Study Kick-off Open House (6-8PM, Jackson Mann Gymnasium, 40 Armington St, Allston, MA 02134). The purpose of the study is to identify measures to improve mobility for all modes – transit, bikes, pedestrians, and cars. MBTA and MassDOT staff will also be on hand to explain the Better Bus Study and the Allston Transit Improvement Study for Allston/Brighton and discuss other ongoing initiatives.

For more background on the “Unchoke The Throat” campaign and the Allston I-90 effort at large, see our project page!

Event: Cambridge to Allston Walk

Event: Cambridge to Allston Walk

We will meet on the Malkin Athletic Center (MAC) steps that face the Lowell House construction site. To reach the MAC steps from Harvard Square, walk down Dunster Street, cross Mt. Auburn Street to Winthrop Street (one block south of Mt Auburn Street). Take a left onto Winthrop Street at a right onto Holyoke Street.

Joe Beggan, WalkBoston board member and Senior Manager for Transportation Planning at Harvard’s Allston Initiatives program will lead the tour from Cambridge to Allston.

In Cambridge Linda Kuczynski, Project Manager for Harvard’s House Renewal Program, will discuss the construction activities at Lowell House and the larger program that is transforming the University’s Neo-Georgian River Houses.

Once we leave the MAC, we will walk to the Weeks Bridge to take a moment to discuss the bridge and enjoy the river views. We will then cross the river and pass through the Business School Campus to the i-lab on Western Avenue. We will be joined in Allston by Ed Leflore, Principal and Founder of CSL Consultants, to talk about Harvard’s consultation projects in Allston including the new Science and Engineering Complex on Western Avenue.

Our next to last stop is the “Grove” at Barry’s Corner. We will finish the walk at Zone 3 Allston’s “Aeronaut Allston” summertime musical beer garden series for food, drink and conversation. EDIT: the beer garden closed for the chance of rain, so we’re ending at Our Fathers, the restaurant across from the Grove.