Tag: trails

Rethinking The Turnpike Allston Interchange

Rethinking The Turnpike Allston Interchange

WBUR: “Rethinking The Turnpike Allston Interchange

Could the Allston I-90 Interchange Improvement project create a more accessible Charles River for pedestrians, bicycles and recreation? We speak with two advocates who are asking for more green space at the point where I-90, the train tracks and Soldiers Field Road squeeze together between Boston University and the river bank — “the throat.”

Guests Harry Mattison is a member of the I-90 Interchange Task Force and the Charles River Conservancy. He tweets @harrymattison. Wendy Landman is the executive director of the non-profit advocacy group WalkBoston, which tweets @walkboston.

Posted February 7, 2018

Huntington Village Center Walk Audit

Huntington Village Center Walk Audit

Volunteers and staff members in the Town of Huntington responded to a Healthy Hampshire Request for Proposal for walkability project funding. The focus of Huntington’s proposal was the planning and construction of a “River Walk” along the Westfield River to better connect residents and visitors with the natural assets in the region. The proposal also suggested an analysis of the safety and quality of existing walking routes currently used by senior walking groups and running groups in Huntington. These routes include the proposed River Walk site.

Read the full report here:
WalkBoston-WalkAudit-HuntingtonVillageCenter-Huntington

Winthrop Harborwalk Comment Letter

Winthrop Harborwalk Comment Letter

May 27, 2014

Richard K. Sullivan, Jr.
Executive Office of Energy and Environmental Affairs
Attn: Nicholas Zavolas
100 Cambridge St., Suite 900
Boston MA 02114

RE: Comments on the Environmental Notification Form for the Winthrop Harborwalk, Winthrop, MA
MEPA# 15202

Dear Secretary Sullivan:

WalkBoston works across Massachusetts advocating for improved and safe pedestrian facilities. We are very enthusiastic about local efforts that enhance the pedestrian environment, and where possible help residents and municipalities implement new walking facilities.

With delight, WalkBoston reviewed the ENF for the Winthrop Harborwalk, which has been designed to connect many of the water-related land uses in the former main harbor area of the town. It proposes recreating some of the original waterfront by reconstructing of a portion of the railroad trestle that once curved through Winthrop Harbor.

It’s very exciting to see a relatively small town take on a major pedestrian improvement that is focused on the waterfront. The Harborwalk will link the many nearby small businesses and local sidewalks to a new facility designed to offer residents a new way of looking at their harbor and at their town. The basic elements of the project include a new walkway designed to encourage walking along the current harborfront in areas that are primarily devoted to car parking and it opens up close views of several boatyards and marinas that are very close to the walkway.

We offer these comments:

Design the trail for extension to other areas

The proposed facility includes a 25-foot wide path – wider than most 10’-12’ wide joint use trails in Massachusetts. The right-of-way for the trail does not take away from existing parking or sidewalks, but instead adds space for walking through a proposed reuse of a former rail trestle in the harbor. Within this generous space, plans recognize the varying needs of the potential users of the path – for example, sitting spaces, strolling routes, and shade for sunny days. Many trails and viewing platforms are not as extensive or inclusive as this one. It suggests that there will be many users of this attractive facility, which is unique for the town and easily accessible to most residents. Given this likely success, it may be useful to think about extension of the trail to other areas along the waterfront, either where there are existing sidewalks that could perhaps be widened to allow more space or other alternative locations for walking and sitting at the harbor’s edge.

Design the trail to include runners
Joint use rail trails are a success in Massachusetts. Concurrent with the growth in use, new paths need to be carefully designed to serve a wide variety of users. In plans for the future (whether within this right-of-way or in trail extensions), it would be well to consider the needs of runners, who are frequent users of the trails. Runners often prefer a softer surface than that favored by cyclists and walkers; stone dust has frequently been used because it is more resilient and provides a more comfortable running surface.

Thank you for the opportunity to comment on this important project.

Sincerely,

Robert Sloane
Senior Planner

Cc  James McKenna, Town Manager

Mystic River Recreational Trail Comment Letter

Mystic River Recreational Trail Comment Letter

March 22, 2011

Secretary Richard K. Sullivan, Jr.
Executive Office of Energy and Environmental Affairs (EEA) 100 Cambridge Street, Suite 900
Boston MA 02114

Attn: MEPA Office, Deirdre Buckley

RE: Comments on the Environmental Notification Form, EEA No. 14718 Mystic River Recreational Trail

Dear Secretary Sullivan:

WalkBoston appreciates the opportunity to provide comments on the Environmental Notification Form for the Mystic River Recreational Trail in Somerville. The project has grown out of the analysis of the Assembly Square development project, which will enlarge and improve the riverside park along the Mystic River. The completion of the new riverside park will result in trails along the south bank of the Mystic for about one mile, reaching from the MBTA rail overpass near the Mystic River Dam to the network of paths that outline part of the Ten Hills neighborhood and along the river to Mystic Valley Parkway (Route 16) in Medford. However, these trails are divided into two discontinuous parts on either side of the Fellsway (Route 28), a heavily traveled roadway which is difficult for pedestrians to cross safely.

The proposal calls for construction of an underpass to accommodate a recreational trail beneath the Mystic River Bridge (Fellsway, Route 28). This underpass would link the Assembly Square development with the Ten Hills neighborhood in Somerville and provide a continuous walkway along the Mystic River. Construction of the underpass will also include some improvements to pathway connections to it on both sides of the Fellsway (Route 28).

WalkBoston fully supports construction of the underpass and welcomes the connections it will provide for walking and bicycling along the Mystic River. The facility will strengthen the Assembly Square development and add a new amenity to other areas near the river. The trail will ultimately be an element in a larger network of trails into and through Assembly Square, and will connect with the proposed station on the Orange Line.

WalkBoston continues to support smooth surfaces on walking routes and in public spaces that serve as pedestrian gathering places and plazas. Brick, granite or concrete pavers create a visually distinctive space but without very careful maintenance these surfaces can quickly become uneven, making for treacherous walking. Such materials are also often difficult to clear of snow during the winter months. Specifications for this project should call for smooth materials leading from both sides onto the wooden deck that constitutes the trail under the bridge. We encourage the selection of smooth walking surfaces wherever possible.

The Assembly Square development is described as a transit-oriented development and we understand that the transit station is being constructed early in the development sequence. The proposed underpass is an integral part of providing good pedestrian connections to the Assembly Square transit station from the Ten Hills neighborhood, and will help to draw pedestrians to the new station.

Thank you for the opportunity to comment on this project. Please contact us if you have questions. Sincerely,

Wendy Landman
Executive Director

Cc Monica R. Lamboy, Executive Director, Somerville Strategic Planning and Community Development,
Jaime Corliss, Director, Shape Up Somerville

EENF 1265 Main Street Waltham Comment Letter

EENF 1265 Main Street Waltham Comment Letter

February 15, 2011

Secretary Richard K. Sullivan, Jr.
Executive Office of Energy and Environmental Affairs
100 Cambridge Street, Suite 900
Boston, MA 02114

RE: Expanded Environmental Notification Form (EENF)
1265 Main Street
Waltham, MA
MEPA # 14681

Dear Mr. Sullivan:

WalkBoston is the Commonwealth’s leading advocate for pedestrians and safe walking. We work throughout the state – encouraging walking, advocating for pedestrian improvements and working for design improvements. We have extensive experience helping residents and local government with pedestrian issues, safe routes to school and safer street crossings.

We have reviewed the EENF for 1265 Main Street, Waltham (formerly The Commons at Prospect Hill), a proposed mixed-use retail and office redevelopment at the site of the former Polaroid buildings.

The project at 1265 Main Street includes approx. 1.28 million sf of mixed office/retail uses in the proposed redevelopment. Phase I of the proposal will use existing buildings formerly occupied by Polaroid along Route 128 to accommodate these uses. Parking for retail and office uses will be shared to provide maximum and successive use of auto storage areas. Phase II of the proposal calls for new buildings scattered around the site.

WalkBoston’s concerns focus on the fact that walking and pedestrians facilities do not appear to be a major component of the project, although the project is frequently called “pedestrian-friendly” in the document. Pedestrian accommodations are listed on p. 92 of the EENF as being primarily along or connected with the residential areas facing Main Street. Plans for the reconstruction of Main Street will surely include sidewalk replacement and widening. Sidewalk connections within the site and between buildings are not discussed, with the exception of the Wayside Trail, which will accommodate pedestrians in addition to cyclists.

WalkBoston is concerned that some opportunities may be lost which could help make walking a part of the project’s benefits. These opportunities are concentrated in six areas:
1. Pedestrian access into the development site
2. Pedestrian connections to transit routes
3. Pedestrian access along the corridor of buildings
4. Pedestrian access along Wayside Trail
5. Pedestrian access into Prospect Park
6. Pedestrian access into Berry Farm

Each of these opportunities is considered below:

1. Pedestrian access into the development site is apparently to be incorporated into three proposed vehicular access routes into the site from Main Street on the south side of the site. The three access routes are Tower Road, the extension of Cutting Lane, and a new roadway that skirts the existing residential community along Hill Road to connect into Main Street at a new location. No access is provided from the north.

2.
• The principal accessways into the western part of the site appear to be along Tower Road on the western edge of the site and the extension of Cutting Lane which goes up the middle of the site. Tower Road connects between all buildings to be reused as part of Phase I. The extension of Cutting Lane connects only to the first two buildings of the former Polaroid site, providing major existing pedestrian access points into the buildings.
• Tower Road is already a major facility for access to the site and is likely to retain its importance as part of Phase I of this development. The proposal calls for two lanes of entering traffic on Tower Road, which suggests it will be carrying a major load of traffic in the future. It connects into the parking areas only indirectly. As such, Tower Road does not appear to be the most appropriate site for major pedestrian access into the site.
• Pedestrian access into the development site is not indicated in the graphics of this proposal. However, the logical location for pedestrian access may be along the proposed new roadway between Main Street and the eastern half of the site. This road is proposed to be located on a new right-of-way that leads to the north part of the site. It provides access to an existing building near the south boundary of Prospect Park which (we assume) will be retained as part of this development. Sidewalks can be created on one or both sides of this new roadway to give access to the existing building if it is to be retained.

3. Pedestrian access to transit from the development site is discussed only vaguely in the EENF. Transit for people working on site and for visitors should be more thoroughly discussed as the project moves forward.
• Transit lines along Main Street will continue to serve this development. At present there is one bus shelter located about one-quarter of the way from Tower Rd/Stow St. to Cutting Lane. Future connections to the transit services along Main Street should be closely connected to the principal pedestrian access within the site. As mentioned above, the future axis could be along the extension of Cutting Lane. If that is the principal on-site sidewalk, it suggests that the bus shelter and stop be relocated to be closer to that axis. Since this portion of Main Street is proposed to be widened and reconstructed, the new bus shelter can become part of that improvement.
•The proponent has expressed a willingness to add a bus route within the site. A new line would be a welcome addition to the access to the site. The proponent should consider where stops will be located on site and whether there should be shelters at those locations.

3. A pedestrian access corridor through the site would be very useful. The proposed development consists of a row of buildings parallel to Route 128/95. This single axis of buildings suggests a prime location for such a corridor.
• The extension of Cutting Lane is on an alignment that appears to be appropriate for pedestrian access to all of the buildings proposed to be activated by Phase I construction. Although there is no continuous roadway for vehicles on the east side of all the buildings, sidewalks and safe pedestrian facilities can readily be provided along this axis. This is particularly appropriate since some of the recommended pedestrian facilities are already in place outside the existing buildings, providing access to existing and proposed parking on the east side of the buildings.
• The pedestrian access corridor would seem to be more efficiently and pleasantly located along the extension of Cutting Lane rather than Tower Road.
• Pedestrian connections will need to be provided across the major parking lot located at the north end of the existing major complex of buildings on the site. This parking lot can be developed with safe pedestrian walkways across it to connect between all buildings on the site.
• The Low Impact Development (LID) for Stormwater Design, calls for underground water storage facilities beneath parking lots. Specifically an underground stone reservoir is planned for the parking lot that is located between buildings. A long-range view of the grouping of buildings might include a building on the site of the parking lot. This in turn would tie the pedestrian portions of the site closer together, and not require pedestrians to walk across a parking lot for access to the buildings. Is it possible to design the underground water storage facility to permit construction of a future building above it?

4. Pedestrian access to the Wayside Trail is welcome. The proponent has generously volunteered to construct a portion of the Wayside Trail along the former railroad right-of-way that passes through this property. The trail is proposed for use by pedestrians as well as bikes. The use of the existing right of way meshes well with state-wide planning effort for this trail.
• On site, all street/trail intersections should be carefully protected. If traffic signals cannot be provided, traffic calming measures should be considered. Signing should be plentiful to warn motorists of the crossings by pedestrians and bikes.
• Additional consideration should be given to the most appropriate location where the trail can safely cross Main Street. If the trail is located within the rail right-of-way, it will reach Main Street in the vicinity of either Cutting Lane or the new access road that skirts the Hill Road residential area. A traffic signal at either location would allow for safe crossings of Main Street. Alternatively, the trail could extend to Stow Street/Tower Road and cross at the signal proposed for that location, although the traffic at the Tower Road/Stow Street/Main Street intersection is expected to be relatively heavy. • If Main Street is to be widened as part of this project, it may be appropriate to incorporate the Wayside Trail as an integral element in the design of Main Street between the Hill Street residential area and Route 128/95. It might become a facility parallel to Main Street but somewhat separated from it. The trail could be on either side of Main Street, depending on the design. It is important to provide a sufficient width to make this portion of the trail spacious for all users – a minimal sidewalk will not suffice.

5. Pedestrian access into Prospect Park is critical. One of the beauties of this site is the extensive background of nearby adjacent public parkland. People working on the site or visiting will be able to see the park and should be provided with options for walking or jogging in it. • Direct access to the parking is cut off by the Low impact Development (LID) for Stormwater Design, which calls for water quality swales to control runoff from nearby steep land. The proposal calls for 2 water storage areas in what appears to be the southeast corner of Prospect Park. These water storage areas are proposed to be bounded by a new site access road, which will ultimately connect to Route 128/95. Pedestrian access through these sites appears to be difficult but not impossible. Perhaps a landscaped walkway could connect between the park and the buildings lined up along Route 128/95. Consideration of this connection would add significantly to the amenities of the site. • Signing on walkways would be appropriate to lead walkers from business areas into the park’s trails and potential jogging routes. Signs could also lead people from major parking areas and from site roadways into the park. • Use of the trails and walkways within the park should be encouraged through signage, promotion among employers on the site, and by sharing maintenance responsibilities between the City and the proponent.

6. The proponent will donate Berry Farm area to the city as part of this project. Pedestrian access into Berry Farm open space could result from this project. This will expand and greatly enhance the availability and accessibility of open space in the area.
• A direct trail or walkway connection between the proposed Wayside Trail and Berry Farm should be considered. There appears to be a physical connection between the main portion of the farm and the former rail right-of-way. This “leg” of Berry Farm should be used to construct an entranceway into the farm. An area directly adjacent has been designated for parking for Berry Farm. This means that people can drive to both the park and the trail and have access from this site.

Thank you for the opportunity to comment on this EENF. Please feel free to contact us for clarification or additional comments.

Sincerely,

Wendy Landman
Executive Director