Tag: soft surface

Comments on the Charles River Resource Management Plan

Comments on the Charles River Resource Management Plan

October 31, 2014

Secretary Maeve Vallely Bartlett
Executive Office of Energy and Environmental Affairs (EEA)
100 Cambridge St., Suite 900
Boston MA 02114

RE: Comments on the Charles River Resource Management Plan

Dear Secretary Vallely Bartlett:

WalkBoston reviews public planning documents to identify potential implications for pedestrians. The following comments are based on our review of this document:

We are very excited about the opportunities presented for potential improvements in the 3- mile long section of riverfront between the Harbor and the BU Bridge. Because the document gives each proposed improvement a priority ranking, we are able to sense where DCR is moving in its schedule to improve the Lower Charles River Basin.

Many of the improvements proposed are essential for all users of the parks and nearby neighborhoods. We commend DCR for its foresight in working toward protection from flooding that might be anticipated in the wake of Hurricane Sandy two years ago. Improvements to the dam between the river and the harbor will protect the basin, and much of the Back Bay and portions of Cambridge, from flooding.

We are also happy that DCR has been active in working on both the proposed South Bank Bridge behind North Station and the “drawbridge walkway” to be constructed as part of an MBTA replacement bridge. These measures will complete the connection of the riverfront paths with the Harbor Walk.

A related improvement is the proposed walkway behind the Science Museum that would provide connections into the museum, pass over the locks with a new bridge and perhaps through the state police barracks to connect with riverside paths and the existing sidewalk in front of the Museum. This improvement would add capacity of the paths around the basin by providing a new pathway for walkers and runners who currently have no option other than the narrow sidewalk that lies along the reconstructed Craigie Dam roadway.

The partnership of DCR and The Esplanade Association has resulted in proposals that are also moving forward. The relocation of Storrow Drive under one of the Longfellow Bridge arches will provide new park space. Overall goals of the Association’s Esplanade 2020 proposals include revitalizing the area around the Hatch Shell with redesigned paths, a café, and areas for audiences attending Hatch Shell performances. One of the recurring issues in the Hatch Shell work has been the mixing of pedestrians and bicycles at the proposed café that cannot be avoided until a high-speed bicycle path, separated from pedestrian ways, is provided under the Fiedler Footbridge.

We are very pleased the concept of providing separate paths for pedestrians and cyclists is a major feature of the report. In some cases, this kind of separation already exists, as in portions of the Boston Esplanade. In others, such as the Cambridge Esplanade, it will be a major improvement to separate paths for a substantial portion of the riverfront. This design provides high-speed bicycle commuters a special route away from quieter activities, such as strolling or playing with children. We trust that the users of the Cambridge Esplanade will benefit from a proposed greensward with trees and a slight differential in elevation that promotes safety by discouraging a mix of fast cyclists and slower users of the paths.

The report also cites several management issues that require relatively small expenditures. For example, the attention given to removing or controlling geese is important because the birds have become dominant in some sections of the Basin, interfering with safe, healthy and pleasant walking on paths near the River. Snow removal is extremely important to walkers and runners who use the riverside facilities during all months of the year.

However, WalkBoston is concerned that the aspirations expressed in the document do not extend as far as they might. We hope that DCR will explore giving more attention to the following issues.

Minimum widths for paths
The report points out that some stretches of paved paths are only five feet wide. This is insufficient to serve the mix and volume of users, often including both pedestrians and bicyclists. It is clearly inadequate for a multi-use path.

Reliance on multi-use facilities
Pedestrian volumes in the riverfront between the BU Bridge and Boston Harbor are significant. These volumes are reflected in user surveys undertaken by DCR and others, where “walking for pleasure” was shown to be the single most important purpose for many people using the parkland. In another survey, 55% of the respondents cited “congested pathways” as an issue they hoped would be addressed. In the same survey 86% of the respondents would support “separating paths by user types.” 67% of respondents reported a negative experience in using the park, with the majority citing the conflict of pedestrians and cyclists.

These surveys indicate that walkers desire safe and pleasant alternatives to multi-use paths. While it is not feasible to provide separate pedestrian paths along the full length of the corridor, it is clearly a desirable feature to include throughout the wider portions of the park. Multi-use paths would thus be limited to those locations where there are no other options such as narrow stretches of parkland or the recently completed North Bank Bridge.

Provisions for runners and joggers
One of the goals stated in the report calls for safe and continuous bicycle, skating and pedestrian access along the entire length of the park. We would add to that list of users the many runners and joggers who use River paths because they are relatively safe and removed from vehicular traffic.

While runners and joggers do not directly compete with pedestrians for space, they are better served by softer surfaces than asphalt or concrete. “Soft surface” paths have been discussed in locations such as the Greenough Boulevard reconstruction, where separate paths are proposed to serve cycling, walking and running. While the separation of walking and cycling paths is a recurring theme in the report, the possibility of also providing a separate path for runners is not. We would suggest including it in any revisions that might be forthcoming. The presence of so many “goat paths” adjacent to the paved paths clearly point to the need.

Thank you for the opportunity to comment on this important project. Please feel free to contact us with any questions.

Sincerely,

Robert Sloane
Senior Planner

Comments on the Environmental Notification form for the second phase of the Clipper City Rail Trail Phase II in Newburyport and Newbury, MA MEPA# 15191

Comments on the Environmental Notification form for the second phase of the Clipper City Rail Trail Phase II in Newburyport and Newbury, MA MEPA# 15191

May 12, 2014

Richard K. Sullivan, Jr. 
Executive Office of Energy and Environmental Affairs
Attn: Alex Strysky
100 Cambridge St., Suite 900
Boston MA 02114

RE: Comments on the Environmental Notification form for the second phase of the Clipper City Rail Trail Phase II in Newburyport and Newbury, MA MEPA# 15191

Dear Secretary Sullivan:

WalkBoston has reviewed the Environmental Notification Form for the Clipper City Rail Trail Phase II, which calls for a new multi-purpose trail on a 1.5 mile section of former rail property – the old City Branch line – in the eastern part of the city. Phase II will also extend along a significant portion of the Merrimack River waterfront in the city center. This new trail adds to the existing 1.1 mile rail trail (Phase I) which links the MBTA commuter rail station and Merrimack River not far from the center of the city. A later Phase III will join these two segments in the vicinity of the existing commuter rail station south of the city, but not along the Merrimack River.

Our review leads us to offer these comments:

Design the trail for expansion 
The proposal for Phase II includes an 8-10 foot wide path. The right-of-way for the trail is irregular, as it passes through publicly owned land that includes 19.4 acres. With this space, plans should recognize the possibility that the path will need to be widened if it is successful in drawing users. Many rail trails in Massachusetts are 10-12 feet wide, permitting a 5-6 foot path in each direction. For example, an extension of the Bruce Freeman Trail in Acton will provide a 12-foot trail with 2-foot wide shoulders on both sides to allow space for pedestrians to step aside from other users of the path if they feel the need to let them pass (a possibility if bicycles are passing).

Design the rail trail to include runners 
Rail trails are a success in Massachusetts. Concurrent with the growth in use, new paths need to be carefully designed to serve a wide variety of users. Phase II of the Clipper City Rail Trail appears to be a very desirable facility, and it makes sense to design it to accommodate runners who are frequent users of trails. Runners often prefer a softer surface than that favored by cyclists and walkers; stone dust has frequently been used because it is resilient and provides a comfortable running surface.

Phase II of the Clipper City Rail Trail has significant right-of-way space that would allow more than a basic bicycle and pedestrian path. With space available, a parallel running track should be considered for the Trail. Even if such a running track is a future addition to the facility, space for such a track should be preserved for the future. In a state known around the world for the Boston Marathon and the many sponsored running events, runners should be included, along with the walkers and bicyclists who may be the prime users of the proposed facility.

Connecting Phase I and Phase II in the city center 
Plans for connecting Phase I and Phase II of the Trail along the Merrimack River in the waterfront area of Newburyport are not included in this document. Omitting mention of such a potential connection seems to diminish the potential created by Phase II construction. Phase II, paralleling the Merrimack River, terminates at Custom House Way, at a point that appears to be adjacent to a portion of the existing Waterfront Promenade Park. This open space has a seawall and boardwalk that can extend the walk two to three blocks further west. Admittedly, at the western end of Promenade Park, an off-street right-of-way may be difficult to find. Sidewalks may have to be used to pass along these few blocks, but if completed, this connection between Phase I and Phase II would afford a 2.4 mile loop around many of the older portions of the city.

Thank you for the opportunity to comment on this important project.

Sincerely, 

Robert Sloane 
Senior Planner

Comments on the Environmental Notification form for Bruce Freeman Rail Trail Phase 2A MEPA# 15196

Comments on the Environmental Notification form for Bruce Freeman Rail Trail Phase 2A MEPA# 15196

May 12, 2014

Richard K. Sullivan, Jr.
Executive Office of Energy and Environmental Affairs
Attn: Holly Johnson
100 Cambridge St., Suite 900
Boston MA 02114

RE: Comments on the Environmental Notification form for Bruce Freeman Rail Trail Phase 2A MEPA# 15196

Dear Secretary Sullivan:

WalkBoston has reviewed the Environmental Notification Form for the Bruce Freeman Rail Trail Phase 2A. The project will extend the existing rail trail 4.88 miles further than the existing trail that begins in Lowell. The new segment passes through Westford, Carlisle and Acton, with much of the project in the Town of Acton. It is encouraging to see this facility being extended into additional communities.

We are especially thankful that the proposed construction includes 2-foot wide shoulders on both sides of the 12-foot wide path, and that an adjacent 6-foot wide stone dust trail is a feature of the project. Both of these additions to the trail will add immeasurably to the use and enjoyment of the path by pedestrians and, in particular, by runners.

Rail trails are a growing success in Massachusetts. Concurrent with the growth in use, the paths have become somewhat overcrowded with conflicts between users, particularly between pedestrians and bicycles. Runners have too often not even been considered for a special facility in prior path designs.

The new 2-foot wide shoulders on both sides of the 12-foot wide path will provide space for pedestrians to step aside from other users of the path if they feel the need to let them pass (a possibility if bicycles are passing).

The 6-foot wide stone dust path that will be constructed alongside the rail trail is a very worthwhile addition to the facility. This, too, is a significant advancement for rail trail construction in Massachusetts. Runners will now have their own space, removed somewhat from walkers and totally separate from bicycles, rendering a path that is likely to be unobstructed by other users. The use of stone dust for this portion of the trail is also a distinct advancement beyond most other trails in the state. This material is softer and more resilient for use by runners, and helps in providing a more comfortable way to run, thereby enhancing the experience for runners who use it.

The new construction techniques incorporated into this trail set a standard that certainly bodes well for future construction of rail trails and other running/walking/biking facilities in the Commonwealth. We advocate for the issues of pedestrian safety and comfort in crowded rail trails, and have additionally been advocating for specific facilities for runners in each of the trail corridors for runners’ safety and comfort. These new standards of trail construction will lead to facilities that can accommodate additional users and help them be confident that their specific concerns are reflected and that a mix of users will feel  comfortable and secure in using the trails.

Thank you for the opportunity to comment on this important project.

Sincerely,

Robert Sloane
Senior Planner

Mass Central Rail Trail – Wayside Branch, MEPA # 15133

Mass Central Rail Trail – Wayside Branch, MEPA # 15133

December 16, 2013
Richard K. Sullivan, Jr.
Executive Office of Energy and Environmental Affairs
Attn: Purvi Patel
100 Cambridge St., Suite 900
Boston MA 02114

RE: Comments on the Expanded Environmental Notification Form for the Mass Central Rail Trail – Wayside Branch, MEPA # 15133

Dear Secretary Sullivan:

WalkBoston has reviewed the Expanded Environmental Notification Form for the Mass Central Rail Trail – Wayside Branch. We are very pleased that this facility is being seriously examined for construction, as it is essentially the spine of a trail network that will eventually extend east-west across the full width of the state. As proposed, the new trail will extend 23 miles through eight communities, through a 19 feet wide corridor reserved for construction. The proposed trail will be 10’ wide. Its importance cannot be understated: it will serve as the main stem of a network of state-wide greenways.

Our analysis of this proposal suggests that design of the rail trail should ensure that it includes features attractive to a wide range of users, including more than pedestrians, cyclists, and in-line skaters. The trail should be designed to encourage extensive use by runners and joggers. We bring this suggestion into the current review process because it may lead to a consideration of additional width and different materials on a trail surface that provides the best possible conditions for runners and joggers.

Why is WalkBoston involved with runners and joggers? WalkBoston has become involved with runners and joggers because we work for all people on foot –whether they walk slow or run fast – all using the same facilities. For 6 years, WalkBoston has been the recipient of support from the running community through the Boston Marathon Charity program, first as a Boston Athletic Association team and subsequently with charity bibs provided by the John Hancock Insurance Corporation. Our runners have enjoyed partnerships with us and with our coaching team under a program we have called RunBoston. Our staff includes competitors who have run the Marathon and we now have a staff person who is a United States Track & Field (USATF) Certified Level 1 Coach and an Executive Board member of the Mass State Track & Field Coaches Association (MSTCA).

Why add space for runners and joggers? Running and jogging are growth industries. In 2012 over 29,000,000 people ran 50 or more days per year. Evidence of runners is often seen near pathways throughout the state, where they have made their own parallel trails, running in the grass until a semi-permanent dirt path becomes established. Recognizing that such running paths are beneficial to runners, the state Department of Conservation and Recreation has not only retained the informal paths, but is also thinking of new ways to add permanence to running paths that would fully incorporate runners and joggers in their path-making.

Why are runners different from other trail users? Runners prefer a ‘soft’ running surface, yet rail trails are most frequently constructed with a firm surface such as asphalt or concrete, chosen because these surfaces can serve the maximum number of potential users. But nearly all runners agree that a softer surface would be preferable. Concrete is uniformly cited by runners as the hardest surface – the most harmful surface for runners who want to avoid physical injuries. Paths constructed of grass, dirt, wood chips or stone dust are the four top preferred options for surfaces for running, because these surfaces are less likely to result in physical injuries such as a twisted ankle, shin-splints, sprains, Achilles tendonitis or other impact-related injuries. Soft surfaces, such as stone dust, lacking pebbles or rocks that might make running dangerous, also provide runners with greater traction and more control over pace and muscle use.

What design features could encourage running? Parallel running paths could be on both sides of the trail or on only one side, where a path would need to provide for two-way running traffic. The running path could be immediately adjacent to the paved trail or separated from it by a few feet. The path could be from 2-6 feet wide and should be as nearly free of camber in cross-section as possible. The former use of the corridor for rail service means that the gradient of the trail will be easily manageable for runners. Special signage is not necessary, as the alternative trail surface provide explanation for the existence of the addition to the trail.

A separate, parallel path would be useful for runners and possibly walkers as well. Such a path could not only provide the running surface runners prefer, it would also remove runners from the stream of bicycle and pedestrian traffic on the principal portion of the trail. Walkers could also use the path if they prefer a soft walking surface or would like to be somewhat removed from other trail traffic.

Where have running surfaces and separate facilities been provided? The 10 mile long Battle Road footpath is the best-known example in Massachusetts, as it provides a stone dust surface for its entire length between Lexington and Concord.

In Janesville, WI, off-street sections of the proposed bicycle path system are designed to meet AASHTO guidelines and WisDOT recommendations. A 10-foot two-directional paved path is the intended design for most sections. These off-street path segments are required through local regulations to include a two foot wide crushed gravel shoulder on at least one side to accommodate runners and walkers.

In Colorado Springs, CO, the Design Guidelines for US 24 Rural Section 25 include two types of trails paralleling the highway: primary trails, usually 12’ wide and paved with concrete; and secondary trails, adjacent soft surface trails, varying in width and designed to accommodate walkers, joggers and equestrian users.

In Denver, CO, several local trails provide both hard-surface and soft-surface parallel trails. The same approach has also been used in St.Louis, MO, Scottsdale, AZ., Minneapolis, MN, Newark, DE, at several locations in Florida, and along the Chesapeake and Ohio Canal in Maryland.

How can a soft surface be added to the Massachusetts Central Rail Trail project?
The proposal for this rail trail includes a specified right-of-way (negotiated with the MBTA) 
that is 19 feet wide. Within this right-of-way, a 10-foot wide path is proposed to be constructed. The 9-foot space that remains will provide a buffer to neighboring land uses, but a portion of it might be used for a running path, which could be constructed at the same time as the proposed rail trail. This space may vary in width as the rail trail passes over or under bridges, or near physically dangerous, precipitous banks. Locations where it is impossible to construct a parallel path might be avoided by requiring runners to rejoin the main path for a limited distance.

What costs might be incurred? Anticipated costs for construction of a running path vary considerably, but brief research suggests that the use of stone dust appears to cost less than asphalt. This would need to be corroborated.

Adding separate elements for runners fits with the state’s self-image as the most well- known and important marathon running state in the country. The running trail would clearly support the burgeoning running shoe industry that includes three shoe-building companies with headquarters in Massachusetts. Because of its considerable length, the rail trail could well serve as a training facility for runners who are vying for a running bib for the Boston Marathon. It could serve the Boston Athletic Association, which has just declared its intention to form a high-performance elite team to dig in and focus on creating a national-caliber and, hopefully, a world-class-caliber team that lives and trains in the Boston area. The trail just might also provide the setting for preparing a winner for the annual race in April!!

We appreciate your consideration of our comments and look forward to your responses to them. Please feel free to contact WalkBoston with questions you may have.

Sincerely,

Wendy Landman
Executive Director

Cc Joe Orfant, DCR
Dan Driscoll, DCR
Paul Jahnige, DCR
Craig Della Penna, Mass Central Rail Trail , Coordinator 

—————————————————————————–
Join our Mailing List to keep up to date on advocacy issues. 

Like our work? Support WalkBoston – Donate Now! 
Connect with us on Twitter and Facebook 

Comments on Charles River Basin Connectivity Study

Comments on Charles River Basin Connectivity Study

December 16, 2013

Richard K. Sullivan, Jr.
Executive Office of Energy and Environmental Affairs
Attn: Dan Driscoll
100 Cambridge St., Suite 900
Boston MA 02114

RE: Comments on the Charles River Basin Connectivity Study

Dear Secretary Sullivan:

WalkBoston has reviewed the Charles River Basin Pedestrian and Bicycle Study for Pathways and Bridges, the so-called Connectivity Study. Our comments arise from the document and from the recent presentation of the study to the public.

The Connectivity Study is very exciting work, as it assembles the issues of movement along the basin very effectively, and points out the possibilities for positive changes in the paths, walkways and running facilities along the River. DCR should be very proud of this feat, and should proceed into implementation of priority aspects of the planning effort as soon as possible.

We were particularly heartened by the Study’s general recommendations for the Basin: “DCR should strive to develop a 10’-wide paved path with a parallel soft-surface trail or shoulder for runners (emphasis added) where possible….. In “pinch point” conditions, a minimum 8’ paved path, with 3’ shoulder on one side, should be incorporated.”

This acceptance of separate paths for runners and joggers – and also pedestrians – is a very important aspect of the planning and represents continuity with past planning efforts.

In the 2002 Master Plan for the Basin a stated goal was to provide safe and continuous bicycle, skating, and pedestrian access along the entire length of the Basin, with a “separation of footpaths and bike paths where doing so will not create excessive pavement near the shoreline.” The master plan also called for reducing congestion and minimizing conflicts on the paths (presumably conflicts between bicycles and pedestrians).

In 2005, users were surveyed to discern attitudes about the river facilities. The survey asked respondents to list and rank how they used the Basin. The top twelve responses were, in order of frequency:
Walking for pleasure
Attending concerts or events
Relaxing in the park
Driving on the parkways
Running or walking for exercise
Biking
Using Riverbend Park in summer
Picnicking
Enjoying the outdoors with children
Inline skating
Walkathons
Informal sports

More than sixty percent of those surveyed used the Basin more than once a week for strolling, relaxing, attending concerts or attending special events. Eighty-six percent asked for easier and safer pedestrian access to the Basin, and an equal proportion recommended separating pathways by user types. Users also frequently called for more benches and places to sit, more wildlife areas, more park rangers, and more convenient parking.

If the Continuity Study can be regarded as an update to the Master Plan, we think it may be leaving out some of the emphasis that the authors of the two planning documents clearly stated. In particular, the separation of bicycle and pedestrian paths does not seem to be as important an aspect of the plan as the users of the park suggested to be of high importance. WalkBoston believes that path separation should be integral to all elements of the plan, as it will help deal with the many problems inherent in an area that is so heavily used with so many potential conflicts between users.

We urge consideration of the following:
1. The elimination of conflicts between users of the paths should be uppermost as a safety precaution. Conflicts arise where bicycle traffic is moving rapidly through areas where pedestrians are strolling, causing dangerous situations for all. The conflicts are particularly difficult for commuting cyclists, some of whom are loath to slow down.

2. An expansion of the definition of ‘multi-use path’ would open options that are not clearly included at the moment. Multi-use pathways in the Basin should have an element – probably a parallel, separate path – that would cater to slow-moving walkers, runners and joggers. The foot traffic path could be built entirely separated from the paved path or built as a non-cambered shoulder.

3. Multi-use paths are appropriate for areas where there is low density of use by walkers, runners and cyclists, but should not dominate planning for the heart of the very heavily used park system in the center of Boston. Instead, the overriding goal should be provision of facilities in which space is plentiful for all park users and potential conflicts between users are minimized using methods that are appropriate to each location.

4. Existing multi-use paths should be expanded all along the river to meet the definition of separation between paths based on user needs.

5. Recognition of what runners and joggers show about their desires for facilities would help in planning new paths. Narrow dirt paths that exist informally alongside many of the paved paths in the Basin demonstrate a clear desire for a softer surface preferred by runners. The softer surfaces can also be used by pedestrians and will clearly help separate cyclists from people on foot.

6. A demonstration of the path separation is included in the proposal for the Greenough Boulevard narrowing. The effects on users would be an important element to explore.

7. Path separation in the near term may only be possible on one side of the river. The Greenough Boulevard proposal and the Memorial Drive narrowing between the Eliot and Anderson Bridges point in the direction of path separation as a major feature on the north bank. Continuation of path separation both west and east of these two segments would be a next logical step. Except at intersections, parkland seems to be available for new or modified paths.

8. An unfortunate aspect of all path planning along the river is the intersections with streets at the bridges. The narrow paths that exist at many of the bridges will be a major feature of riverfront paths for a long time, but should not preclude path separation away from the bridge intersections.

9. As long-term improvements, underpasses at bridge intersections are appropriate and important options that will enhance the recreational and transportation options for many Basin users.

We appreciate your consideration of our comments and look forward to your responses to them. Please feel free to contact WalkBoston with questions you may have.

Sincerely,

Wendy Landman                                    Bob Sloane
Executive Director                                  Senior Project Manager

Cc Nicole Freedman, Boston Bikes
Cara Seiderman, City of Cambridge
Steve McLaughlin, MassDOT
Margo Levine Newman, The Esplanade Association
Renata von Tscharner, Charles River Conservancy
Herb Nolan, Solomon Fund
Jackie Douglas, LivableStreets Alliance
Pete Stidman, Boston Cyclists Union
David Watson, MassBike
Tom Grilk, Boston Athletic Association