Tag: Rail Trail

Upcoming WalkMassachusetts Network Learning Opportunities

Upcoming WalkMassachusetts Network Learning Opportunities

The WalkMassachusetts Network Zoom calls take place on the 3rd Wednesday of each month at 1pm, and generally are topic focused with a guest speaker. We’re excited to announced August, September, October, and November’s speakers!

Can’t attend mid-day, but really interested in one of the talks below? Don’t worry: each talk/presentation will be recorded so we can share it afterwards. We’ll stop the recording before Q&A as we have the last few months to encourage open discussion. Recordings are posted to our YouTube channel and linked on our website at the bottom under “past events.”

Quick RSVP links are here, full descriptions below and on the WalkMassachusetts Network page.


August 16th: Register for 8/16 1pm on Zoom.
All Things Pedestrian & Traffic Signals

Based on recent conversations on the WalkMassachusetts Network Google Group, we’ve lined up a speaker for August who is very knowledgeable about traffic signals! Come with your signal questions, and be ready to learn about RRFBs, accommodating slower peds, ped recall, protection from concurrent conflicting turns, and more, including Boston’s new traffic signal policy which has enormous improvements for pedestrians.
Speakers include: Peter G. Furth, Professor, Civil and Environmental Engineering, Northeastern University

September 20th: Register for 9/20 1pm on Zoom.
Piecing together, the Mass Central Rail Trail. It is like putting Humpty Dumpty together again.

This is the longest and most complicated former RR corridor to reassemble in New England. Running from Northampton to Boston, it has been a 40+ year journey so far. It is the longest developing rail trail in New England. Today we have 59 of the 104 miles open as a trail. 90.5 miles are in a protected status.
12 miles are currently under construction. In two-years we are likely to have 75 miles open. https://www.masscentralrailtrail.org/ Within 150 miles of Northampton, MA lies the densest network of former steam railroad corridors in the United States. A report by MassDOT showed that the MCRT can be completed, but it begs the question: What would a completed 100 mile long walking and biking trail mean to the Commonwealth? That is what we’ll be talking about on Sept 20th.
Speakers include: Craig Della Penna
Craig is the author of 5 books, the forwards to several more, op-eds in numerous newspapers and in the past few years, 5 books have been written that feature him in them as a case study in various realms. Including two about his innovative real estate practice; specializing in the sale of houses near rail trails. He is the first Realtor in the US to specialize in this niche. He and his wife Kathleen, also operate an award-winning bed & breakfast that sits 8 feet from the now rail trail, in Northampton’s historic Civil War era industrial village of Florence. He has given over 1,200 lectures in 21 states on various topics related to the conversion of former RRs into linear parks known as rail trails.

October 18th: Register for 10/18 on Zoom.
Vacant to Vibrant: Creating Walkable Neighborhoods with Social Infrastructure

Making an area walkable requires paying attention to more than what is on the street—also critical is what happens on the edges. Having good civic spaces creates communities that are strong and resilient and neighborhoods that have accessible, walkable destinations.
Speakers include: Aaron Greiner, the director of CultureHouse, will talk about how they use a community-driven model to reimagine vacant storefronts as pop-up community spaces that meet local needs.

November 15th: Register for 11/15 on Zoom.
MA Safe Routes to School

Since 2005, the federally funded Massachusetts Safe Routes to School (SRTS) Program has been working to increase safe biking and walking for students grade K-12 by using a collaborative, community-focused approach that bridges the gap between health and transportation. Join this nationally #1 ranked program of MassDOT as we discuss their latest efforts, including the recent inclusion of high schools, driver education materials, and DESE-accreditation for professional development of their pedestrian and bike safety curriculum.
Speakers include: Judy Crocker, Statewide Coordinator, Massachusetts Safe Routes to School – a program of MassDOT.

Winthrop Harborwalk Comment Letter

Winthrop Harborwalk Comment Letter

May 27, 2014

Richard K. Sullivan, Jr.
Executive Office of Energy and Environmental Affairs
Attn: Nicholas Zavolas
100 Cambridge St., Suite 900
Boston MA 02114

RE: Comments on the Environmental Notification Form for the Winthrop Harborwalk, Winthrop, MA
MEPA# 15202

Dear Secretary Sullivan:

WalkBoston works across Massachusetts advocating for improved and safe pedestrian facilities. We are very enthusiastic about local efforts that enhance the pedestrian environment, and where possible help residents and municipalities implement new walking facilities.

With delight, WalkBoston reviewed the ENF for the Winthrop Harborwalk, which has been designed to connect many of the water-related land uses in the former main harbor area of the town. It proposes recreating some of the original waterfront by reconstructing of a portion of the railroad trestle that once curved through Winthrop Harbor.

It’s very exciting to see a relatively small town take on a major pedestrian improvement that is focused on the waterfront. The Harborwalk will link the many nearby small businesses and local sidewalks to a new facility designed to offer residents a new way of looking at their harbor and at their town. The basic elements of the project include a new walkway designed to encourage walking along the current harborfront in areas that are primarily devoted to car parking and it opens up close views of several boatyards and marinas that are very close to the walkway.

We offer these comments:

Design the trail for extension to other areas

The proposed facility includes a 25-foot wide path – wider than most 10’-12’ wide joint use trails in Massachusetts. The right-of-way for the trail does not take away from existing parking or sidewalks, but instead adds space for walking through a proposed reuse of a former rail trestle in the harbor. Within this generous space, plans recognize the varying needs of the potential users of the path – for example, sitting spaces, strolling routes, and shade for sunny days. Many trails and viewing platforms are not as extensive or inclusive as this one. It suggests that there will be many users of this attractive facility, which is unique for the town and easily accessible to most residents. Given this likely success, it may be useful to think about extension of the trail to other areas along the waterfront, either where there are existing sidewalks that could perhaps be widened to allow more space or other alternative locations for walking and sitting at the harbor’s edge.

Design the trail to include runners
Joint use rail trails are a success in Massachusetts. Concurrent with the growth in use, new paths need to be carefully designed to serve a wide variety of users. In plans for the future (whether within this right-of-way or in trail extensions), it would be well to consider the needs of runners, who are frequent users of the trails. Runners often prefer a softer surface than that favored by cyclists and walkers; stone dust has frequently been used because it is more resilient and provides a more comfortable running surface.

Thank you for the opportunity to comment on this important project.

Sincerely,

Robert Sloane
Senior Planner

Cc  James McKenna, Town Manager

Comments on the Environmental Notification form for the second phase of the Clipper City Rail Trail Phase II in Newburyport and Newbury, MA MEPA# 15191

Comments on the Environmental Notification form for the second phase of the Clipper City Rail Trail Phase II in Newburyport and Newbury, MA MEPA# 15191

May 12, 2014

Richard K. Sullivan, Jr. 
Executive Office of Energy and Environmental Affairs
Attn: Alex Strysky
100 Cambridge St., Suite 900
Boston MA 02114

RE: Comments on the Environmental Notification form for the second phase of the Clipper City Rail Trail Phase II in Newburyport and Newbury, MA MEPA# 15191

Dear Secretary Sullivan:

WalkBoston has reviewed the Environmental Notification Form for the Clipper City Rail Trail Phase II, which calls for a new multi-purpose trail on a 1.5 mile section of former rail property – the old City Branch line – in the eastern part of the city. Phase II will also extend along a significant portion of the Merrimack River waterfront in the city center. This new trail adds to the existing 1.1 mile rail trail (Phase I) which links the MBTA commuter rail station and Merrimack River not far from the center of the city. A later Phase III will join these two segments in the vicinity of the existing commuter rail station south of the city, but not along the Merrimack River.

Our review leads us to offer these comments:

Design the trail for expansion 
The proposal for Phase II includes an 8-10 foot wide path. The right-of-way for the trail is irregular, as it passes through publicly owned land that includes 19.4 acres. With this space, plans should recognize the possibility that the path will need to be widened if it is successful in drawing users. Many rail trails in Massachusetts are 10-12 feet wide, permitting a 5-6 foot path in each direction. For example, an extension of the Bruce Freeman Trail in Acton will provide a 12-foot trail with 2-foot wide shoulders on both sides to allow space for pedestrians to step aside from other users of the path if they feel the need to let them pass (a possibility if bicycles are passing).

Design the rail trail to include runners 
Rail trails are a success in Massachusetts. Concurrent with the growth in use, new paths need to be carefully designed to serve a wide variety of users. Phase II of the Clipper City Rail Trail appears to be a very desirable facility, and it makes sense to design it to accommodate runners who are frequent users of trails. Runners often prefer a softer surface than that favored by cyclists and walkers; stone dust has frequently been used because it is resilient and provides a comfortable running surface.

Phase II of the Clipper City Rail Trail has significant right-of-way space that would allow more than a basic bicycle and pedestrian path. With space available, a parallel running track should be considered for the Trail. Even if such a running track is a future addition to the facility, space for such a track should be preserved for the future. In a state known around the world for the Boston Marathon and the many sponsored running events, runners should be included, along with the walkers and bicyclists who may be the prime users of the proposed facility.

Connecting Phase I and Phase II in the city center 
Plans for connecting Phase I and Phase II of the Trail along the Merrimack River in the waterfront area of Newburyport are not included in this document. Omitting mention of such a potential connection seems to diminish the potential created by Phase II construction. Phase II, paralleling the Merrimack River, terminates at Custom House Way, at a point that appears to be adjacent to a portion of the existing Waterfront Promenade Park. This open space has a seawall and boardwalk that can extend the walk two to three blocks further west. Admittedly, at the western end of Promenade Park, an off-street right-of-way may be difficult to find. Sidewalks may have to be used to pass along these few blocks, but if completed, this connection between Phase I and Phase II would afford a 2.4 mile loop around many of the older portions of the city.

Thank you for the opportunity to comment on this important project.

Sincerely, 

Robert Sloane 
Senior Planner

Clipper City Rail Trail Comment Letter

Clipper City Rail Trail Comment Letter

WalkBoston has reviewed the Environmental Notification Form for the Clipper City Rail Trail Phase II, which calls for a new multi-purpose trail on a 1.5 mile section of former rail property – the old City Branch line – in the eastern part of the city. Phase II will also extend along a significant portion of the Merrimack River waterfront in the city center. This new trail adds to the existing 1.1 mile rail trail (Phase I) which links the MBTA commuter rail station and Merrimack River not far from the center of the city. A later Phase III will join these two segments in the vicinity of the existing commuter rail station south of the city, but not along the Merrimack River.

Read the full letter here:
WalkBoston-CommentENF-ClipperCityRailTrail-Newbury

Comments on the Environmental Notification form for Bruce Freeman Rail Trail Phase 2A MEPA# 15196

Comments on the Environmental Notification form for Bruce Freeman Rail Trail Phase 2A MEPA# 15196

May 12, 2014

Richard K. Sullivan, Jr.
Executive Office of Energy and Environmental Affairs
Attn: Holly Johnson
100 Cambridge St., Suite 900
Boston MA 02114

RE: Comments on the Environmental Notification form for Bruce Freeman Rail Trail Phase 2A MEPA# 15196

Dear Secretary Sullivan:

WalkBoston has reviewed the Environmental Notification Form for the Bruce Freeman Rail Trail Phase 2A. The project will extend the existing rail trail 4.88 miles further than the existing trail that begins in Lowell. The new segment passes through Westford, Carlisle and Acton, with much of the project in the Town of Acton. It is encouraging to see this facility being extended into additional communities.

We are especially thankful that the proposed construction includes 2-foot wide shoulders on both sides of the 12-foot wide path, and that an adjacent 6-foot wide stone dust trail is a feature of the project. Both of these additions to the trail will add immeasurably to the use and enjoyment of the path by pedestrians and, in particular, by runners.

Rail trails are a growing success in Massachusetts. Concurrent with the growth in use, the paths have become somewhat overcrowded with conflicts between users, particularly between pedestrians and bicycles. Runners have too often not even been considered for a special facility in prior path designs.

The new 2-foot wide shoulders on both sides of the 12-foot wide path will provide space for pedestrians to step aside from other users of the path if they feel the need to let them pass (a possibility if bicycles are passing).

The 6-foot wide stone dust path that will be constructed alongside the rail trail is a very worthwhile addition to the facility. This, too, is a significant advancement for rail trail construction in Massachusetts. Runners will now have their own space, removed somewhat from walkers and totally separate from bicycles, rendering a path that is likely to be unobstructed by other users. The use of stone dust for this portion of the trail is also a distinct advancement beyond most other trails in the state. This material is softer and more resilient for use by runners, and helps in providing a more comfortable way to run, thereby enhancing the experience for runners who use it.

The new construction techniques incorporated into this trail set a standard that certainly bodes well for future construction of rail trails and other running/walking/biking facilities in the Commonwealth. We advocate for the issues of pedestrian safety and comfort in crowded rail trails, and have additionally been advocating for specific facilities for runners in each of the trail corridors for runners’ safety and comfort. These new standards of trail construction will lead to facilities that can accommodate additional users and help them be confident that their specific concerns are reflected and that a mix of users will feel  comfortable and secure in using the trails.

Thank you for the opportunity to comment on this important project.

Sincerely,

Robert Sloane
Senior Planner