Comment Letter Re: Union Square Redevelopment 15889

Comment Letter Re: Union Square Redevelopment 15889

August 21, 2018

Matthew Beaton, Secretary
Executive Office of Energy and Environmental Affairs
Attn: MEPA Office, Analyst Alex Strysky
100 Cambridge Street, Suite 900
Boston, MA 02114

Re: Union Square Redevelopment 15889

Dear Secretary Beaton,

WalkBoston appreciates the opportunity to comment on the proposal for Phase I of the Union Square Redevelopment in Somerville. We offer our comments on the pedestrian issues associated with this project.

Our comments focus on the general approach, open space in the initial development and the pedestrian connections between the new station and the older portions of Union Square.

The project in general
WalkBoston is excited about the generous inclusion of elements in this project that will enhance and encourage pedestrian movement throughout the area. In addition, the process leading to this proposal seems to have been handled well by the city, its residents and the proponent. We enthusiastically support the request for a Phase I waiver.

This proposal is exciting, as it marks the beginning of a larger project that will transform Union Square. The 3.5 acre site with the proposed initial buildings will be the beginning of a concentration of development around the upcoming Union Square Green Line station which it directly abuts. The buildings are intended to be the first link between the new transit station and the existing intensive uses in what is traditionally known as Union Square, which begins at the intersection of Somerville Avenue and Prospect Street and extends toward Bow Street.

Open Space
Although the initial pedestrian connections are located on only one side of Prospect Street, they will bring about extensive change to this appearance of this old industrial street. The open space lining the east side of Prospect Street is an elongated triangle, the base of which is a wide entrance to the new transit station. The triangle extends north, narrowing to become a traditional sidewalk as it nears Somerville Avenue. The promise of this space lies in the proponent’s encouraging intentions to add extensive plantings and large trees in 15,000 square feet of open, publicly accessible civic space with 500 linear feet of seating options. The design of the space could result in pedestrians being enveloped in the space and not noticing that the other side of the street is not quite as handsome – an effective way to energize the space until development occurs around it.

The space is to be available to be programmed for a variety of activities. Transit connections from the Green Line Extension as well as a dedicated bus lane on Prospect Street will lead to substantial pedestrian density and transit interactions to support the beginning of prosperity for this new development district.

Pedestrian connections
The proposal calls for two tall buildings at each end of the site: a 25-story building marking the portion of the site closest to the transit station and a 10-story building marking the end of the site at Somerville Avenue. A six-story link between the two taller buildings will include a parking garage plus residences. A total of 450 residences will be included.

The northernmost building at the corner of Somerville Avenue and Prospect Street will be primarily commercial office or lab units located above first-floor retail spaces. Retail spaces continue along Prospect Street, lining the pedestrian way between the transit station and Somerville Avenue. A unique feature is the intention of the proponent to provide 13,000 square feet of space for Arts and Creative Enterprise (ACE) space, defined as live/work units, fabrication or maker space, co-working or other arts programming. The proponent’s intention is based on encouraging a creative economy to thrive in the midst of an embryonic urban employment center. ACE space can be especially attractive to pedestrians, and enliven the ground-floor uses of the proposed new buildings.

Of particular interest to pedestrian advocates, and not fully explained in the documentation on Phase I of the project, is the intention of the developer for the space that separates the 10-story building at the north end of the site and the remainder of the structures to the south. This looks on the plan like a street, but is quite narrow. No intersection for vehicular traffic is indicated by the plan to allow a physical roadway between this street and Prospect Street; such a connection would cross the wide pedestrian spaces lining Prospect Street and would seem to be potentially annoying and disruptive to pedestrian flows along Prospect Street. This street contrasts with others intended to serve vehicles, which are clearly aligned to the rear of the proposed buildings and do not interfere with the proposed pedestrian way along Prospect Street. The proponent should clarify the purpose and potential uses of this thoroughfare.

Thank you for your consideration of our comments.

Sincerely,

Wendy Landman
Executive Director

WalkBoston Comments on the GLX and the Community Path – March 15, 2016

WalkBoston Comments on the GLX and the Community Path – March 15, 2016

March 15, 2016
Massachusetts Department of Transportation
10 Park Plaza, Room 4150
Boston, MA 02116

Attention: MassDOT Board of Directors
MBTA  Fiscal Management and Control Board
GLX Interim Project Manager Jack Wright
Assistant Secretary for Policy Coordination Katherine Fichter

RE: GLX and the Community Path

WalkBoston has worked for over 25 years to promote improvements to pedestrian facilities throughout the state and region. We strongly believe that the proposed Community Path adjacent to the Green Line Extension in Somerville and Medford is an essential element to the successful operation of the extension.  The path through this corridor is an integral part of the project that will help it to prosper and serve its riders well, especially when the need is reinforced by the lack of parking at the stations.

The Community Path is essential for the GLX to fully meet its potential in serving the residents of this corridor. It will function as the principal access route to and from the stations for walkers and cyclists, as it will be a safe and protected means of access between residences and the doors of the light rail vehicles. The same levels of access cannot be provided solely by relying on existing streets, which are frequently less direct for users. The safety of walkers is also improved by using routes that are not shared with vehicles.

We urge consideration all possible ways to fund the path and include it an integral part of the construction of this extension. Joint construction is the most cost-effective approach to construction, as the transit project and the Community Path share a common right-of-way and many elements of infrastructure, Cutbacks in the GLX project should not include reducing the number or safety of available routes of access for transit patrons going to or from the stations.

Thank you again for this opportunity to comment on this project.

Sincerely.

Wendy Landman
Executive Director

————————————————————————————————
Join WalkBoston’s Mailing List to keep up to date on advocacy issues.

Like our work? Support WalkBoston – Donate Now!
Connect with us on Twitter and Facebook 

Comments on Green Line Extension (GLX) Project Equivalent Facilitation Request

Comments on Green Line Extension (GLX) Project Equivalent Facilitation Request

July 21, 2014
Mary R. Ainsley, Senior Director of Design & Construction for GLX
Massachusetts Bay Transportation Authority (MBTA)
100 Summer Street, Suite 250,
Boston, MA 02110

RE: Green Line Extension (GLX) Project Equivalent Facilitation Request

Dear Ms Ainsley:

First, I would like to thank you for the very clear and succinct presentation of the access issues at the meeting held on July 10, 2014. I found the information to be useful and easy to follow and appreciate the care with which the issues were shared with the community.

WalkBoston has several comments on the Equivalent Facilitation Request (EFR), and hopes they are useful to the design process as it continues.

1. We are pleased that no bricks or pavers will be used for walking surfaces, and understand that the sketches shown gave an erroneous impression.

2. As presented in the EFR, the width of the existing sidewalks on several of the bridges will not change even though they barely meet legal access requirements and are narrow for their present pedestrian volumes. Once the new Green Line is in place, these sidewalks will
be the primary access routes for many additional transit users.

We are very concerned that their combination of steep grades, narrow width, proximate traffic and imperfect snow clearance (this is New England) will result in unsafe and possibly inaccessible conditions during some portion of the year. We urge the MBTA to explore the
possibility of widening the sidewalks – perhaps by narrowing the adjacent roadway shoulders or travel lanes, or by removing one lane of travel. The photos in the report (one is reproduced below) show the problem quite clearly.

3. Cross slopes that exceed ADA standards are described in several locations, and the project team has addressed the issue reasonably well in most places. However, at both the Gilman and College Ave. Stations there are crosswalks with cross slopes in excess of 8%. We believe that this is not an appropriate condition for access to transit stations, and worry that both able-bodied and patrons with disabilities will be put at risk crossing streets with such steep cross slopes, especially during snowy, icy or wet conditions.

Again, we applaud the MBTA’s clear delineation of the issues, and hope that the concerns raised by WalkBoston and others can be addressed.

Sincerely,
Wendy Landman
Executive Director

Cc Laura P. Brelsford, MBTA Assistant General Manager for System-Wide Accessibility
Hayes Morrison, Somerville Transportation Department

—————————————————————————————————

Join our Mailing List to keep up to date on advocacy issues.

Like our work? Support WalkBoston – Donate Now!
Connect with us on Twitter and Facebook