Comment on EENF for The Office and Research Center and the Residences at Assembly

Comment on EENF for The Office and Research Center and the Residences at Assembly

November 23, 2016

Matthew Beaton, Secretary
Executive Office of Energy and Environmental Affairs
Attn: MEPA Office
Analyst: Holly Johnson
100 Cambridge Street, Suite 900
Boston, MA 02114

RE: EENF for The Office and Research Center and the Residences at Assembly – MEPA #15595

Dear Mr. Beaton,

WalkBoston is a 501©(3) non-profit, pedestrian advocacy organization that makes walking safer and easier in Massachusetts. We have reviewed the EENF and offer the comments below.

The Office and Research Center and the Residences at Assembly is located on a 9-acre site at 5 Middlesex Avenue, Somerville, in close walking proximity to Assembly Station and to existing residential areas of East Somerville. It is planned to become an integral feature of the massive developments already taking shape in Assembly Square. Phase 1 of the proposed Project includes a 188-room hotel, and a 147-unit residential building with 6,000 sf of retail space on the ground floor. Later phases will include offices and residential units. The total space to be constructed within the site may reach 2,000,000 sq ft.

We are concerned that the proponent has not offered significant changes to the walking environment, except on its own site. The nearby Kensington Underpass, one of two connections between residential Somerville and the many worksites and attractions, should become its focus for improvements. The proponent has suggested a U-turn that would complicate pedestrian crossings at the underpass. The proponent should be required to develop improvements for pedestrians and vehicles at the underpass in an integrated way.

Recognizing the advantages of being located in the large Assembly Square complex of developments, the proponent notes that walking and bicycling through Assembly Square and on the paths along the Mystic River will be encouraged. The proponent also emphasizes the access provided to the site by public transportation not only at the new Orange Line rapid transit station, but also on bus lines located nearby on Route 38 and on Broadway in East Somerville. Access to public transit gives significant advantages to the proponent’s proposed complex of both office and residential units that can take advantage of the transportation services concentrated in the environs.

The proponent’s plan includes on-site pedestrian facilities and a plaza in the center of the development. The proponent vows that improvements to pedestrian and bicycling facilities will ensure security and comfort for those walking and biking. Part of these improvements will be a significant wayfinding element that will direct site visitors and users toward significant destinations, show walking times, and including public transportation services. The proponent also hopes to link the fabric of this new district to neighboring East Somerville.

The Assembly Square complex has already established pedestrian facilities throughout the property and highlights the riverside park and paths that make up a substantial pedestrian network. The proponent’s site will be able to take advantage of those improvements and link into them at appropriate locations.

The basic link between this site and East Somerville is the neglected underpass of I-93 at Kensington Street, which has not been updated since the construction of the highway. The proponent should take a leading role in the upgrading of this underpass, to bring to life the proponent’s laudable goal of a more appropriate connection into the surrounding community. Improvements to the underpass would bring about:
1. Improved pedestrian connections from East Somerville into the Assembly Square shopping area to reach proliferating new shopping, entertainment and work locations.
2. Improved pedestrian connections from the East Somerville neighborhoods to the new Orange Line rapid transportation station at Assembly Square.
3. A wayfinding network for pedestrians finding their way into and through the complex set of developments at Assembly Square.
4. Improved pedestrian connections both from Assembly Square as well as the East Somerville neighborhoods to the public transportation routes along Route 38, where bus stops are closer than the Assembly Square Orange Line Station.
5. Clear routes for access from Assembly Square to the major grocery store as well as commercial and public sites such as the library along Broadway in East Somerville.
6. A walking route for residents of East Somerville and people in Assembly Square for recreation and healthy daily activities.
7. Implementation of major goals of the City of Somerville’s “Somervision” program which looks to increase active and alternative transportation options, reduce congestion and promote workplace- and business-based policies and incentives to encourage changes in more choice and to expand bike, pedestrian and public transit use.

Improving the Kensington Underpass by itself is insufficient to protect users. The underpass, which connects East Somerville to Assembly Square near the intersection of McGrath Highway, Fellsway, Route 38 and the I-93 southbound onramp, has two at-grade street crossings where pedestrians must cross heavily traveled routes. The two crossings have painted crosswalks and pedestrian-actuated yellow flashing warning lights. More detailed analysis should be undertaken to assess the current levels of safety for people crossing at this location. Projections of future pedestrian traffic should be undertaken to analyze whether what level of additional safety measures might be appropriate.

Of special concern is the proposal by the proponent of this project that there should be a U-turn that would allow traffic from Assembly Square and this project to use the westbound service road along I-93 (called Bailey Road) to reach a point where it could u-turn into the eastbound service road near Route 28 to provide better access from Assembly Square to I-93 southbound. This would, according to the proponent help by “allowing vehicles to bypass two signals, thereby alleviating congestion.”  The U-turn would provide, in essence, a fourth option for exiting the complex and reaching I-93 southbound.

However, with the addition of this U-turn, people trying to cross at the Kensington Underpass crosswalk will always be faced with oncoming traffic at both eastbound and westbound service roads leading into and out of the U-turn. The addition of traffic to the two service roads is a problem for the pedestrians using existing Kensington underpass should be analyzed in terms of any improvements that may be made to increase its use.

Several options might be explored to alleviate this difficulty. One would be to reduce both service roads on either side of I-93 to one lane, so that drivers would not be tempted to bypass a driver who is yielding to a pedestrian in the crosswalk. That option might be sufficient to retain the un-signalized crosswalk.

We appreciate your consideration of our comments.

Best regards,

Bob Sloane
Senior Planner

Brendan Kearney
Communications Manager

————————————————————————————————
Join WalkBoston’s Mailing List to keep up to date on advocacy issues.

Like our work? Support WalkBoston – Donate Now!
Connect with us on Twitter and Facebook

Comment Letter: General Electric Headquarters Project EA 15547

Comment Letter: General Electric Headquarters Project EA 15547

September 30, 2016

Matthew Beaton, Secretary
Executive Office of Energy and Environmental Affairs
Attn: MEPA Office, Alex Strysky
100 Cambridge Street, Suite 900
Boston, MA 02114

Re: General Electric Headquarters Project EA 15547

Dear Mr. Beaton,

WalkBoston has reviewed the Expanded Environmental Notification Form for this project and we
offer our comments below.

We are excited that GE is locating its headquarters in Boston, and is proposing a project that has such an urban plan where the great majority of trips to the site will be by people walking – about 70% if both walking and transit/walking trips are included. Ensuring that walking connections to the site are convenient, accessible and attractive will be critical to welcoming the public and GE staff to the headquarters.

We think there are several aspects of the site that are exciting for pedestrian access, and where great attention to the details of the walking environment will provide important access benefits.

1. The Fort Point Channel setting – The public realm improvements associated with the project are substantial and will take advantage of the waterside site for its many users.

• The project will include a major building entrance facing a widened 18-foot Harborwalk. On the water’s edge overlooks are provided to heighten contact with the Channel and its water views. A seating zone along the Harborwalk is provided as an extension of the central plaza between Brick Buildings and the New Building. We hope that GE will include site programming that takes advantage of the waterfront portion of the site.

• A path network connects the site with the Harborwalk, including accessible paths. It is likely that many pedestrians will use the stairway from Summer Street to the Harborwalk as this is the most direct route between the site and South Station. The route should be well marked with pedestrian wayfinding signs.

• We recommend adding shade trees along the Harborwalk, and amenity that is mentioned quite often in walkers’ comments.

2. Site entrance on Necco Street – Compared with the Harborwalk entrance, the Necco Street entrance design seems less well developed in the EENF. However, this will be the principal entrance to the site for residents arriving from the Fort Point and Seaport Districts, South Boston, and for people driving to the site. Also, Necco Street will of necessity be the route for people with disabilities because the Harborwalk access is via a stairway from Summer Street and the site.
• The Necco Street entrance should be designed to be as important and attractive as the Harborwalk entrance. The sidewalk is shown as widened to 12’, but is narrowed to carve out a lengthy vehicle drop-off lane along much of the site’s frontage. The sidewalk also accommodates the loading zone and garage entries, and bicycle storage on the sidewalk is also suggested. In combination, this mix of service uses would diminish the quality and functionality of the Necco Street sidewalk. We request that the proponent re-examine the sidewalk design to provide a gracious and welcoming entrance along Necco Street.

• Necco Street should be designed as a tree-lined street. In the 100 Acres Plan (2007) that includes this site, Necco Street is proposed to provide walking access to the proposed parkland that extends from the Fort Point Channel to the Boston Convention and Exhibition Center. The street is privately owned, suggesting the possibility for joint action with neighboring properties to improve it. The street right-of-way is nearly 60’ wide which could readily incorporate a design that accommodates two 10-foot travel lanes, two 7-foot parking lanes, and a wide tree-lined sidewalk along the site that also includes
benches and additional landscaping.
• The sidewalk at the main entrance to the buildings should have additional width to accommodate the many potential users. A compelling and elegant front door might be incorporated into the plans for reconfiguring the Brick Buildings.
• A Necco Street crosswalk should be provided at Necco Court to accommodate safe crossing from the large Necco Street Parking Garage across the street.

3. Off-site approaches to the Necco Street site entrance – The existing walking route from Summer Street (and thus South Station) to the boundary of the site is difficult for persons with disabilities to travel. The proponent should take the lead in ensuring that walking improvements are made to this route. This may require significant coordination with the City and with neighboring landowners, but will result in improved access for all users of the neighborhood.

• There is no curb ramp provided from Dorchester Avenue onto the Summer Street Bridge (south/GE side of the bridge). A curb ramp should be provided.

• Accessible access to GE from Summer Street will need to be provided via Melcher Street. However, the sidewalk along the south side of Melcher Street appears appears to have an excessive cross slope that is hazardous for persons with disabilities, and difficult for anyone pushing a stroller or pulling a suitcase. This cross slope will need to be fixed.

• Between Melcher Street and Necco Court on the west side of Necco Street, the sidewalk appears to be 8’ wide, but curb ramps are not provided where driveways cross the street. The sidewalk should be rebuilt to meet ADA requirements and provide a gracious walking route between GE and South Station.

4. Winter weather conditions and general maintenance –

• Management and operations planning should ensure good snow clearance between the site and South Station along the Harborwalk and the sidewalks of Necco and Melcher Streets. The proponent should work with adjacent property owners and business associations to assure good access to its site under winter weather conditions.
• The proponent should explore a greater degree of enclosure and a weather-resistant design for the GE Plaza walkway, a portion of which will be covered by a translucent canopy suspended between Brick Buildings and New Building. The current plan appears to work primarily in warm months, and multi-season use will add interest and vitality to the site.

5. Off-site issues – We urge the proponent to work with the city and the neighboring property owners to bring all nearby pedestrian facilities up to date.

• For example, the sidewalk at the bend of Necco Street (just south of the proponent’s site) needs to be completed, and there are uneven and heaved bricks in the Necco Street sidewalk from the bend to A Street. In addition several areas of the A Street sidewalk toward the Broadway Red Line station are not ADA compliant, because they are too narrow or have missing or insufficient curb ramps.

• The proponent should work with the City to ensure that traffic signal timing works well for pedestrians at intersections near the site.

We appreciate your consideration of our comments and your responses to them, and we look forward to working with GE, the City and other Fort Point community members on this exciting project.

Please feel free to contact WalkBoston with questions you may have.

Sincerely,
Wendy Landman
Executive Director

Cc Peter Cavanaugh, GE Ecosystem Transformation Leader

 

Comments on Landmark Center Expanded Environmental Notification Form – MEPA #15183

Comments on Landmark Center Expanded Environmental Notification Form – MEPA #15183

May 9, 2014

Secretary Richard Sullivan, Jr.
Executive Office of Energy and Environmental Affairs
Attn: Deidre Buckley, Director, MEPA Office
100 Cambridge Street, Suite 900
Boston, MA 02114

Re: Landmark Center, Boston MA
Expanded Environmental Notification Form – MEPA 15183

Dear Secretary Sullivan:

The Landmark Center, formerly the Sears Warehouse and Distribution Center, occupies an 8.8 acre site in the Fenway. It is a major city landmark and retail center that is at the heart of a burgeoning residential district. This proposed development will intensify the use of the site, making it more of a transit-oriented development, and includes 600 housing units, additional retail and new office spaces. The residential units will be housed in a high-rise building of some 12-13 stories immediately adjacent to the Fenway MBTA station. There will be 110,000 sf of new retail space, including a new Wegman’s Supermarket. Office space, already the single largest use in the building, at 635,000 SF, will be only slightly increased.

Many of the design features of this proposal will benefit pedestrians. Surface parking is replaced by about 1.3 acres of open space, setting off the historic Sears Building and including generous pedestrian walking and sitting accommodations. A new public green at the corner of Park Drive and Brookline Avenue is located where the heaviest pedestrian traffic crosses the street. The existing surface parking and the existing parking garage will be removed. A new underground garage will replace the existing 1500 parking spaces.

The proposed design is organized around pedestrian access. The existing internal circulation in the old Sears Building will be augmented by new pedestrian facilities connecting the Wegman’s market facing Fullerton Street on the east side of the property with retail facilities that face Park Drive on the west. A new pedestrian connection will be made via a walking route that passes through the building connecting the MBTA station on the north side of the site and Brookline Avenue on the south.

To build on these excellent elements of the proposal, we suggest that the proponent also consider the following possibilities:

1. Rationalize the odd combination of parallel streets on the east side of the site. 

Both Fullerton and Minor Streets, directly parallel and adjacent to each other, abut the site on the east side. At present, pedestrians may be only slightly affected by this oddity, largely because both streets are narrow and carry little traffic. However, under the proposed design Fullerton Street is being laid out as the major access route for all trucks and service vehicles and a major entrance into the underground parking garage. Fullerton Street is also called out as a pedestrian connection to the Fenway Multi-Use Path on the north side of the site, and carries large volumes of pedestrians before and after Red Sox games when the garage is in heavy use. Pedestrian safety on Fullerton Street may become an issue, depending on traffic volumes using the street for site access.

2. More clearly define and design the proposed use of the pedestrian areas.
The spacious new open space on the Park Drive side of the site is only vaguely outlined in the EENF. It replaces a large parking area, and will provide a substantial improvement in safety and amenity for pedestrians walking between the MBTA station and both the project and Brookline Avenue. To make this a successful outdoor space that functions as more than a passage around the buildings consideration should be given to sitting, eating, strolling and potential assembly areas. Design of each of the spaces might take into account the need for some protection from the elements (sunlight included). Major features of interest such as a fountain, a sidewalk café, or a sculpture or other visual displays might be added.

3. Work with the City to complete the portion of the Fenway Multi-Use Path that is adjacent to the property
This project and the air rights project (Parcel 7) at Kenmore both include segments of the proposed path that connects the Riverway and Kenmore Square. The proponent has made construction of the path contingent on the City obtaining necessary approvals, and we urge
the proponent to work closely with the City to accomplish that goal, and to work with the City to clarify a list of needed approvals and explain how they will obtained. We also suggest that the proponent explore the possible use of the space for Red Sox related displays, photos, sculptures, artifacts since it is a potentially essential walking route for fans moving between the Fenway MBTA station and Fenway Park. The proponent should also work with the City to provide wayfinding signs along the path.

4. Clarify responsibility for building the Fenway Multi-Use Path connection to the Emerald Necklace.
In addition to the portion of the path that is adjacent to the property (described above), there is an additional relatively short section of the Path between the Riverway and the project site that is extremely important. Under existing conditions, some Fenway Station patrons must cross Park Drive at grade, in a location directly above the station that does not even have a crosswalk. Driver’s sight lines of pedestrians are compromised due to the ‘hump’ of the bridge as it crosses over the Green Line. The completion of the Fenway Multi-Use Path under the Park Drive viaduct, directly adjacent to the Green Line tracks, would allow station patrons and other pedestrians to make this connection more safely and conveniently. This connection is important to the success of the site as a transit oriented development and the proponent should take a positive and active role in its construction. We urge the proponent to work with the MBTA and commit to constructing this important pedestrian facility. It would also be helpful if the pedestrian access that will be adjacent to the station could provide access to St. Mary’s Street to improve safety for riders coming to the station from northwest of the point where Park Drive crosses Fenway Station.

Thank you for the opportunity to provide comments on this significant project.

Sincerely,

Robert Sloane
Senior Planner

Comments on Barry’s Corner Residential and Retail Commons Project

Comments on Barry’s Corner Residential and Retail Commons Project

January 8, 2013

Gerald Autler

Boston Redevelopment Authority
One City Hall Square
Boston, MA 02201-1007

RE: Barry’s Corner Residential and Retail Commons Project
Expanded Project Notification Form
Submitted Pursuant to Article 80 of the Boston Zoning Code

Dear Mr. Autler:

WalkBoston has reviewed the EENF for the Barry’s Corner Residential and Retail Commons Project in Allston. This project is a first step in a major redevelopment of the surroundings of the intersection of North Harvard Street and Western Avenue, and thus will set the stage for many additional improvements in the vicinity. Our comments reflect the aspects of the proposal that most affect pedestrians, as these components are likely to play an important role in the way in which the project functions and relates to its surroundings.

  •  The area is planned to become the principal focus of North Allston
    Preliminary plans for this site are generally following the consensus presented in the 2005 North Allston Strategic Framework for planning and in Harvard’s Institutional Master Plan from 2012. Both plans call for intensive retail and other development at the intersection. The site of this proposal is but one of several sites that will comprise the North Allston activities. Considering only the north side of Western Avenue, plans call for 200,000 square feet at the Charlesview site, 45,000 square feet on the site of this proposal, and, on the arena site, 60,000 square feet for the arena and 140,000 square feet for the office/retail structure that encloses the basketball court. This totals 445,000 square feet altogether – a number that suggests a need for intensive analysis of the vehicular and foot traffic that will be utilizing all of the sites, including the one that is currently being analyzed. Any proposal for a center that will include at least 400,000 square feet should provide for carefully-considered pedestrian interconnections between its parts.
  • The proposed basketball arena/office building
    The Institutional Master Plan of the Allston campus recently distributed by Harvard introduces a combination of a 3,000-seat basketball arena and 140,000 square feet of retail/office/residences on land immediately north of the project site. The arena will attract many people to games during the basketball season, and perhaps, depending on uses of the facility, in other months as well. What it means in terms of future pedestrian or vehicular traffic is not at all clear from this EENF. The scale of the arena project warrants consideration of its effects on this site. For example, retail activities on the proposed site might benefit from consideration of additional retail on the street level under the arena to make the retail functions of the intersection more prominent.
  • The sidewalk in front of the arena
    The arena site is nearly a mile from Harvard Square. People coming to the area will be largely on foot (they will be discouraged from driving because of the paucity of nearby parking spaces). Large numbers of people will be attracted to the basketball arena for games and perhaps for other uses that may be scheduled there, but the volume of visitors has not been described in the EPNF. Many people will walk from Harvard Square, the Yard and from residence halls north of the river, and most will arrive via the west side of North Harvard Street. These walkers should be provided with a very wide sidewalk along the full length of North Harvard Street (currently shown as a wide sidewalk in front of the existing building but not along the stadium or this development proposal). We would recommend that it be wider than the standard 10’ – 12’ width for multi-use paths, something on the order of 20’ would be appropriate.
  • Extending the sidewalk to the south
    A wide sidewalk along North Harvard Street should not end at the arena, but should provide access to the intersection of Western Avenue and the North Allston activity center. This wide sidewalk would pass directly along the North Harvard street side of this project, and connect to the 45,000 square feet of retail activities that occupy most of the ground floor of this proposal.
  • The Charlesview site
    This site on the northeast corner of the intersection of North Harvard and Western has been planned for retail activity and some residential or office development. The current plan estimates 200,000 square feet for the building complex. Access between sites will take place at the intersection, where crosswalks should be redesigned to more directly connect the two sites.
  • The parks at the North Allston Center
    Two potential sites for parks touch directly on the intersection. The existing grove of trees in front of the Charlesview development and the triangle occupied by the gas station are potential assets to the retail center and should be further developed as landmarks within this center. Either of the two sites could become intensively used by walkers as outdoor spaces to get fresh air, to sit, to read or have a picnic. Pedestrian access to either or both of the sites should be carefully considered as a part of developing the network of sidewalks and street crossings.
  • Crosswalk redesign
    The layout of the existing crosswalks at the intersection of North Harvard Street and Western Avenue maximizes the crossing distances for walkers because all the crosswalks have been laid out as diagonals. This layout makes pedestrian crossings unnecessarily long and require walkers to stay in the street longer than they would if the crosswalks were perpendicular to the streets they cross. One example on Western Avenue shows that the existing crosswalk is nearly 80 feet long, while a perpendicular crossing would be approximately half that length. As part of the intersection improvements associated with this project, crosswalks should be redesigned for the safety of pedestrians. Removal of the refuge island on the Charlesview corner should also be considered as part of the project’s efforts to improve the North Harvard Street/Western Avenue intersection.
  • A new pedestrian crosswalk on North Harvard Street
    Access to the proposed arena and to the site of this proposal will require pedestrian access across North Harvard Street. This is particularly important for people arriving by northbound transit, currently served by bus stops at the north and south ends of the Charlesview site. The existing pedestrian crosswalk at Western Avenue may need to be supplemented by an additional crosswalk at the intersection of North Harvard Street and Smith Field Drive Extension, which is more than 500 feet from Western Avenue, suggesting that a new crosswalk at that location would be convenient and well used. It is made particularly important because it does not make sense to have a crosswalk at Grove Street, because the distance between Western and Grove is very short.

Uses of land within the site
The relatively small size of the site and the need for specific services results in relatively constrained pedestrian access.

  • Vehicle uses
    Almost one-quarter of the parcel will be devoted to vehicle access and surface parking because of the proposed new streets. Vehicular access to the site is one-way northbound from Western Ave. on Smith Field Drive, and two-way on Grove Street between Smith Field Drive and North Harvard Street. The description of vehicular access needs (particularly on-site loading and unloading requirements) implies that a further extension of Smith Field Drive will be constructed soon – perhaps in conjunction with this project, to allow full site access in- and out-bound from its intersection with North Harvard Street. Three streets are to be devoted to providing access to a 2.74 acre site. This may be excessive, unless they are necessary to serve the proposed arena, either temporarily or permanently
  • Parking on the site
    The proposal calls for 180 below-grade parking spaces and 41 surface private spaces, making a total of 221 spaces on-site. These spaces will serve the 325 residences proposed for the site, and potentially some of the retail uses as well. A question remains of whether the underground parking could be reached from Smith Field Drive rather than Grove Street, which seems destined to be degraded by many autooriented uses.
  • New on-site street – Grove Street
    Grove Street is primarily a service street designed to provide truck access to the buildings, access to the below grade garage, and 23 surface parking space. The EPNF does not discuss whether service for the arena (potentially including loading/unloading access for trucks and access to underground parking) will also be provided on the street. The combination of service uses could compromise the character of the street and the street-facing residential units as well. In terms of pedestrian use, Grove Street was designated as a “pedestrian trail” in the university’s Institutional Master Plan. This suggests continuity between Charlesview and Smith Field via Grove Street, which would need a crosswalk located midway between Western Avenue and the Smith Field Drive Extension. Such a crossing – likely to be unsignalized – could be dangerous for pedestrians and drivers alike.
  • A bulky arena as a neighbor
    Depending on its design, the proposed arena may loom dramatically over the site of the current proposal. The project design fort his site actually calls for residential units along Grove Street, along with an irregularly shaped sidewalk and major vehicular access for loading and parking. While the vehicular portions of the proposal for this side of the site are not affected by the neighboring arena, the residential units may well be. Although the dimensions of the proposed arena are unknown, its height may reach more than half of the proposed dwellings on the proposal’s site. The prospect of a looming building also affects the proposed sidewalk, where vehicular impacts are major, and where proposed street trees or wider sidewalks will do little to mitigate the impacts of a large building.
  • New on-site street – Smith Field Drive and Smith Field Drive Extension
    Smith Field Drive and its extension have been designed as a major service way for both this project and the proposed basketball arena. It may have operating difficulties when the arena is in use. A convergence of vehicles and pedestrians would be expected, and traffic control on either has not been discussed.
  • Open space
    Roughly 3,600 square feet of the site’s land has been designated as street-level open space. The two parcels are located at the two corners of the buildings – one facing N. Harvard Street and the other on Western Avenue – and both serve to enhance the entrances to the residences. Additional open space of about 8,000 square feet is provided on the second level above the retail uses, and will only be accessible to residents of the site.
  • Sidewalks
    Sidewalks surround the buildings on all sides and are of irregular widths to accommodate building entrances, potential sidewalk cafes, retail entrances and the vehicular entrances to the building. The proposal for a wide sidewalk on the west side of North Harvard Street suggests the possibility of an overhanging building or a street-level colonnade.

Thank you for the opportunity to provide comments on this important project. Please feel free to contact WalkBoston with questions you may have.

Sincerely,

Bob Sloane
Senior Project Manager

Comments on New Brighton Landing EENF MEPA #49909

Comments on New Brighton Landing EENF MEPA #49909

July 20, 2012

Secretary Richard Sullivan
Executive Office of Energy and Environmental Affairs
MEPA Office
100 Cambridge Street, Suite 900
Boston, MA 02114

RE: New Brighton Landing Expanded Environmental Notification Form (EENF) MEPA # 49909

Dear Secretary Sullivan:

WalkBoston has reviewed the EENF for the New Brighton Landing proposal. The potential improvements that this project will be able to bring to the area are substantial. The pedestrian aspects of the proposal are likely to play an important role in the way in which the project functions and relates to the surrounding neighborhood and nearby public buildings.

The core of the project is a series of new buildings on a campus focused on a new headquarters building for New Balance Corporation. A hotel, offices and a new sports center are included, along with open space and wide sidewalks that will add pedestrian amenities to the area.

We do have concerns that the surrounding area will be impacted greatly and that, so far, the project proponent has specified very little about what changes will be made to the neighborhood streets that will bear the brunt of the access into this site, including the changes that will be made to sidewalks and street crossings for those who choose to walk to the site. In May, we submitted comments to the BRA regarding this project, and had hoped that the proponent would address our comments in this filing. There are many questions remaining, and we repeat our comments to the City below.

The New Brighton Landing Master Plan includes a major indoor sports facility to be shared with neighborhood residents. It includes new office buildings that will house many new workers on the site and small retail facilities to serve people coming to the site. The proposed sports facility is an exciting addition to the neighborhood’s recreation resources and will be a major attraction for the surrounding community, and pedestrians will need access to and from the site from many directions. We have a number of suggestions for the streets that surround the site.

North Beacon Street
Bounding the south side of the site, North Beacon Street will serve as a collector for pedestrian access into the site from several local streets including Etna, Dustin, Murdock (connecting directly to Brighton High School), Gordon and Saunders Streets.

Pedestrian improvements suggested for this portion of North Beacon Street:

  1.  Pedestrian signals and signs should be placed at the intersections where most pedestrians are likely to cross North Beacon Street for access into the site: Life/Etna Streets and Arthur Street.
  2. Wayfinding signs should be added at these locations to help residents find the new facility.

The Mass Pike splits the development site from the North Brighton/North Allston community and pedestrians from that neighborhood must access the site via either Everett Street (along the eastern edge of the site) or Market Street/Birmingham Parkway (along the western side of the site). Both of these streets need improvements to provide good access for walkers.

Everett Street
Everett Street connects North Beacon Street to Western Avenue and Soldiers Field Road via a bridge over the Turnpike. The street has sidewalks along its entire length, but they are of poor quality: most are asphalt that is indistinguishable from the roadway surface and may thus be dangerous to walkers. No curbs separate sidewalks and vehicular traffic lanes.

Pedestrian improvements suggested for Everett Street:

  1. Everett Street is so important to neighborhood walking and for access to the river that its sidewalks should be totally rebuilt for pedestrian safety – widened and separated from road traffic by a curb where none now exists.
  2. Crosswalks should be added at all major intersections on Everett Street, including North Beacon Street and Soldiers Field Road.
  3. Cut-through traffic should be discouraged and pedestrian safety should be considered along streets where traffic diversions are predictable, such as Franklin Street.
  4. Wayfinding signs on Everett Street should be added at intersections to help local residents and visitors find the proposed site. Wayfinding signs should also be provided to help pedestrians find the Telford Street pedestrian overpass across Soldiers Field Road. This is the only place where there is pedestrian access from Allston to the river that does not require crossing at least four lanes of relatively high-speed roadway.

Market Street/Birmingham Parkway
On the west side of the site, Market Street and Birmingham Parkway form a continuous straight route that links North Beacon Street to Soldiers Field Road. Sidewalks exist on both sides of Market Street and on the east side of Birmingham Parkway between Lincoln Street and Western Avenue. Birmingham Parkway may be unique in the city; for more than one-half mile – between Western Avenue and its intersection with Soldiers Field Road near Watertown – it has no pedestrian crosswalks of any kind, although there are traffic signals where crosswalks might be located.

Pedestrian improvements suggested for Birmingham Parkway and Market Street:

  1. The sidewalk on the east side of Birmingham Parkway will provide the primary pedestrian access route between the proposed development and the North Brighton/ North Allston neighborhood and is also the primary access route to the parks along the Charles River for on-site workers. Given New Balance’s product line and work force we anticipate that there will be a significant number of runners who will seek to reach the Charles River’s world famous running paths.
  2. Birmingham Parkway between Lincoln Street and Western Avenue is very wide. North of Lincoln the Parkway has two southbound traffic lanes and four northbound, this widens to five lanes between Lothrop Street and Western Avenue. This wide street provides an opportunity: one lane of northbound Birmingham Parkway plus the existing sidewalk should be converted into a combined bicycle-pedestrian greenway between the New Brighton site and the river.
  3. Pedestrian crosswalks and pedestrian countdown signals should be added at the intersection of Western Avenue and Birmingham Parkway (where signals already exist) to allow walkers to safely gain access to the riverside parklands.
  4. The sidewalk along the east side of Market Street connects via a crosswalk at Lincoln Street to the sidewalk on the east side of Birmingham Parkway. Pedestrian countdown signals may be appropriate at this location as traffic may increase as a result of the proposed development.

Suggestions for future walkways in the area

  1. A master plan for pedestrian and bicycle access between this site, its surrounding neighborhoods and the river should be considered. There are presently no high quality connections and there are great opportunities to link the existing and proposed residential and commercial uses to the wonderful open space resources that are nearby.
  2. The portion of Birmingham Parkway between Lincoln Street and North Beacon Street is an access road to just a few adjacent properties, and provides “back-door” access to Soldiers Field Road businesses via Wexford Street. It appears to have low traffic volumes and would seem to be a candidate for a ‘greenway’ toward the west where it meets the river. This portion of Birmingham Parkway should be examined to see if its vehicular use could be reduced in speed by physical reconstruction of lanes to a narrower width, and whether the road could be reconfigured into a greenway comprised of major walking and biking routes to the river.

Thank you for the opportunity to review this proposal. Please feel free to contact us with questions you may have. We look forward to hearing how our suggestions are addressed in subsequent revisions to the plan.

Sincerely

Wendy Landman
Executive Director