Comments on the DEIR/DPIR for the Suffolk Downs Project, MEPA 15783

Comments on the DEIR/DPIR for the Suffolk Downs Project, MEPA 15783

December 14, 2018

Matthew Beaton, Secretary
Executive Office of Energy and Environmental Affairs (EEA)
ATTN: MEPA Office
100 Cambridge Street, Suite 900
Boston MA 02114

Brian Golden, Director
Boston Redevelopment Authority
One City Hall Square
Boston, MA 02201-1007

RE:  Comments on the DEIR/DPIR for the Suffolk Downs Project
MEPA: #15783

Dear Secretary Beaton and Director Golden:

Thank you for the opportunity to review and comment on the Suffolk Downs project. We offer the following comments on the project’s pedestrian environment, which overall is well addressed.

The project offers generous walking opportunities

The heart of the proposal is a 15-acre park – the Central Common – with walkways surrounding the site and connecting into and through the open space it provides. The Common has been designed as a one-mile running/walking loop. The park has water features with one pond that can be used for skating and another elongated pond that connects into the nearby saltwater Belle Isle Inlet. The Common connects on either end to meeting and performance spaces on plazas leading to the two Blue Line stations.

Main Street, a second north-south walkway, also connects Beachmont and Suffolk Downs Blue Line stations. This street will have wide, landscaped walkways with setbacks to allow for sidewalk cafes and other such uses along its route.

A third walkway, the Active Linear Corridor, parallels Main Street and runs midblock between Main Street and Tomasello Drive. This pedestrian-only street is intended to provide a series of active play spaces for all ages. The proposal is an extraordinary experiment – a half-mile long area that gives nearby space for casual and active uses. Figure 3.37 lists the potential uses of the corridor as active play, jumping mounds, rolling course, flex turf, climbing health, ping pong and jungle gym. Many of these are likely intended for children.

An additional north-south community trail skirts Tomasello Drive and is shown as a two-way bike facility that follows a swale on the side of the property facing the gas tanks, coupled with a sidewalk on the opposite side of the street.

There are several cross streets that connect the four north-south walkways. They vary in scale and importance. Several contain landscaped walkways and add to the many opportunities for walking throughout the project area.

One concern we ask the developer to address with respect to this generously scaled set of pedestrian ways and open spaces is that the play areas along the Active Linear Corridor (with the exception of the block near Waldemar Avenue) are located within blocks intended to be developed not for housing, but office uses, where presumably there will be few children in nearby buildings. As development occurs within the project, the proponents should ascertain if the proposed Active Linear Corridor is located appropriately to serve the intended users who may be living in residences on-site. Active recreational facilities for small children might be more appropriate lining the loop road at the eastern edge of the proposed Common. This route directly serves the three residential areas near the proposed Beachmont Plaza, the Belle Isle Plaza and the “Panhandle” near Route 1A. This route would strengthen the opportunities for residents to use the Common and its central meeting places as well.

East Boston Greenway extension

WalkBoston encourages the proponents to seriously consider a connection to the East Boston Greenway. The existing East Boston Greenway ends at the Belle Isle Marsh, near the Suffolk Downs MBTA station but on the other side of Bennington Street from the station. There is a roadside path/sidewalk paralleling Bennington Street between the main entrance to the marsh reservation and the crosswalk to the Suffolk Downs transit station. This path is used two-way by both cyclists and pedestrians. Extending the path further north toward Revere Beach is not an easy task. The frontage of Bennington Street is spacious and possibly could be the location of an extended route until reaching Everard Street in Revere, where the Bennington route narrows down on the approach to the Beachmont station at Winthrop Avenue.

A potential alternative location for extending the East Boston Greenway that was suggested in the DEIR exists in the large tract of land between the MBTA rail tracks and the Suffolk Downs property line. This land is nearly 10 acres of unused space and has no buildings on it between the Suffolk Downs transit station and Washburn Avenue in Revere. Depending on ownership the tract might be made available. If owned by the MBTA, the property might become available to the developer, who could include a north-south path that would be available as a substitute for the Bennington Avenue route and link the property into the regional Greenway network as a principal route in the system.

Possible new walking connections into Orient Heights from the project site

A decision has been reached with neighborhood residents that vehicular access between the project site and Orient Heights will not be provided. Several walking issues should be addressed to overcome this lack of street connection.

  1. Walley Street and the Suffolk Downs MBTA station
    Walley Street, just off Waldemar Avenue, is the current road and pedestrian access point to the Suffolk Downs transit station for Orient Heights residents. This approach currently works for all access to the neighborhood, and the proposed development adjacent to it respects existing neighborhood preferences and adds no vehicular access to the existing site. Instead the proposal adds a new access route for vehicles and shuttle buses to drop off transit-riders from the new development as close as possible to the transit station; this connection appears to be a part of the proposed Belle Isle Plaza. It is a bit unclear how this new connection will meet with existing streets and paths, and the developer, the City of Boston and the MBTA will need to coordinate the proposed new access with the existing street and path layout.
  2. South project boundary – Waldemar Avenue
    A community path along the full length of the south project boundary (approximately ½ mile long) connects the bus stop on Route 1A with the Suffolk Downs MBTA station at Walley Street. This is a good walking connection for East Boston/Orient Heights residents, as it provides connections to transit in two directions. From the Suffolk Downs station to a location about halfway between the MBTA station and Route 1A, an on-site road (also called Waldemar Avenue) parallels the path. It will be lined with small residential buildings backing onto the path. The Waldemar Avenue/Tomasello Drive intersection is well located to connect pedestrians into Orient Heights via the sidewalks of the Orient Heights public housing project and especially via Crestway Road, a short street that links to Faywood Avenue and directly to the Manassah Bradley School.
  3. Safe walking access to schools
    The proponents include no discussion or description of schools and safe routes to schools. For any students who are attending nearby schools, walking to school should be safe and convenient. The proponents of the project should work with both the City of Boston and the City of Revere to assure safe passage for all students living in Suffolk Downs and using local schools.

    WalkBoston suggests additional examination of the role of schools on the walking paths proposed for the development. Students attending the Bradley School from both Suffolk Downs and Orient Heights would be well served by a neighborhood connection to the proposed path network. In addition, we suggest looking at whether a playfield that includes active recreation uses could be located where Crestway Road meets Waldemar Avenue (Block 5 on Figure 3.7). A playfield located here could serve both the school and the new neighborhood at a logical intersection of the walkways that are such a positive element of the project.

    For children living in the Boston portion of the Suffolk Downs neighborhood, access to schools in the Orient Heights neighborhood will be somewhat constrained because there is no vehicular access between the two neighborhoods, other than the route provided by going out from Waldemar Avenue onto Route 1A between Tomasello Drive and Boardman Street.

    The closest Revere school is the Seacoast School, located on Bennington Street, which can be reached from Suffolk Downs only by an indirect route through the Beachmont transit station and by sidewalks for a further 1000 feet. The Garfield Elementary and Middle School is about 1500 feet north of Winthrop Avenue. Revere High School is located approximately one mile north of Winthrop Avenue.

Route 1A along the western border of the project area

WalkBoston has significant concerns about the proponent’s plans for the Route 1A corridor. Adding a third vehicular travel lane in each direction and increasing roadway capacity from 2,100 to 3,300 vehicles in each direction – an increase of 57 percent – threatens to undermine the ambitious transit-oriented development goals the proponent expresses elsewhere in the proposal. Increased vehicular traffic will also mean more greenhouse gas emissions and more risks to pedestrian and bicyclist safety. We question the need for more vehicular travel lanes on Route 1A between Furlong Drive and Boardman Street, as most southbound traffic on Route 1A will likely access and exit the project site via Route 145/Winthrop Avenue, rather than the proposed “super street” corridor. Similarly, because of the extensive footprint of the Tomasello Drive intersection with Route 1A, we assume that the proponents are anticipating that most of the northbound Route 1A traffic into the site will enter via Tomasello Drive and exit via the same intersection.

The proposal to add more vehicular travel lanes within the existing roadway footprint will also undermine pedestrian and bicycle accommodations along Route 1A. Adding lanes will likely require narrowing or eliminating the current highway median, which would otherwise provide an important pedestrian refuge at the new proposed crossings at Tomasello Drive and Furlong Drive. Absent such a refuge, pedestrians will be forced to cross six highway travel lanes at once, which increases safety hazards and diminishes connectivity between the project site and development and recreation opportunities along the Chelsea Creek. Adding travel lanes while maintaining a five-foot roadway shoulder also reduces the space available for truly safe and protected bicycle facilities. The current proposal for a narrow five-foot unprotected shoulder alongside fast-moving highway traffic does not provide any meaningful protections for cyclists.

Instead of the “super street” concept, we encourage the proponents to reconsider Route 1A as a truly multimodal transportation corridor, with no new travel lanes except those built as dedicated pull-offs for buses on both the northbound and the southbound sides of Route 1A. This will further advance the proponent’s vision for transit-oriented development, while also maintaining space for protected pedestrian facilities in the median of Route 1A. Dedicated bus pull-out lanes also provide for increased bus service. As part of such a plan, the proponent should commit to improved bus stop facilities along Route 1A, including benches and shelters. Pull-outs for bus lanes and bus stop facilities should be considered for replacement of the existing unsafe bus stops at Furlong Drive, the jug handle at the tank farm, Tomasello Drive and Boardman Street.

Pedestrian access to Route 1A bus connections 

Existing conditions for pedestrians and bus riders on 1A are terrible. We are glad that there are proposals that provide safe access for pedestrians to bus stops on Route 1A, including new pedestrian crossings at Tomasello Drive and Furlong Drive. The principal users of bus services may be most concerned about access at Tomasello Drive. The existing Tomasello Drive intersection is proposed to be divided into two components – one for traffic entering Suffolk Downs from Route 1A and the other for traffic exiting Suffolk Downs onto Route 1A.

Pedestrians from both Waldemar Avenue and Suffolk Downs are affected in a dramatic way by this proposal, which would add a bus stop island for northbound buses on Route 1A, a pedestrian island between the travel lanes for traffic exiting the site onto Route 1A, and a right-turning slip lane for traffic entering the site from Route 1A. We encourage the project proponents to also consider a more conventional T design for this intersection, similar to what exists now.

Under the proposed new configuration, most pedestrians will approach the intersection on the south side of Tomasello Drive, as that is the path that connects to the residential areas in the “Panhandle” of Suffolk Downs, as well as the homes in Orient Heights. The bus stop on the Suffolk Downs side of Route 1A would be located directly adjacent to the Tomasello Drive exit lanes onto Route 1A. Getting to the bus stop would require passengers to cross the right-turning slip lane from Route 1A to reach the bus stop island. The crossing of the slip lane is likely to be more dangerous for pedestrians than other crossings, as traffic entering the site may not be stopped by the Route 1A signals. This should get more attention in final designs; one option would be to install a signal protecting pedestrians and a crosswalk.

Pedestrians crossing Route 1A are primarily bus passengers using southbound Route 1A bus services. They, too, are required to cross the potentially dangerous slip lane from Route 1A into Tomasello Drive, along with the southbound lane that serves traffic exiting from Tomasello Drive. Pedestrians would halt on the island between the travel lanes exiting the site and cross directly to the bus stop on the west side of Route 1A. This movement can be made concurrently with the signal phase allowing exiting traffic to move from Tomasello Drive onto Route 1A. Designers of the traffic flow for this intersection must consider the possibility that walkers cannot cross without a median break that affords refuge and safety for pedestrians who cannot cross in one signal phase.

Offsite mitigation for pedestrians and bicyclists

The project proponents outline an extensive program for offsite traffic mitigation in Section 6.10 of the DEIR, detailing numerous operational improvements for motor vehicles broken down by specific locations and intersections. Pedestrian and bicycle improvements are described only briefly and in largely general terms at the end of this section. We encourage the proponents to provide more detailed plans in the FEIR for pedestrian and bicycle improvements at the same locations and intersections they are prioritizing for offsite traffic mitigation.

Thank you again for this opportunity to comment on the proposals that affect pedestrians in the Suffolk Downs project.

Sincerely,

Wendy Landman
Executive Director

Cc:
Bob O’Brien, City of Revere

Page Czepina, MEPA Office

Tim Czerwienski, Boston Planning and Development Agency

1000 Boylston Street Comment Letter

1000 Boylston Street Comment Letter

March 8, 2018

Michael Rooney
Boston Planning and Development Agency
One City Hall, Ninth Floor
Boston, MA 02201

RE: WalkBoston comments on 1000 Boylston Street

Dear Michael:

WalkBoston appreciates the opportunity to comment on the Draft Project Impact Report (DPIR) for the proposed development at 1000 Boylston Street in the Back Bay. This project will significantly improve the pedestrian realm by activating a currently desolate stretch of sidewalk with new ground-floor retail uses and streetscape improvements.

We encourage the proponent to clarify their plans for crosswalk improvements. The orientation of pedestrian ramps to crosswalks is not clearly discernable from Figure 3.35 in the DPIR (“Streetscape Improvement Plan”), but several crosswalks as depicted appear to utilize apex ramps, meaning that a single ramp at a street corner serves two crosswalks at a 45-degree angle to both. Such ramps can have the unintended consequence of directing people with visual impairments or mobility aids into the middle of the intersection, posing hazards to their safety. To avoid this WalkBoston recommends the utilization of two perpendicular ramps at street corners, such that each ramp serves one crosswalk at a direct approach. We urge the proponent to explicitly incorporate such perpendicular ramps into their streetscape designs at the intersections of Boylston/Dalton/Hereford Streets and St. Cecilia/Cambria Streets, and to adjust the placement of crosswalks accordingly as needed.

In addition, the southeast corner of the intersection of Boylston/Dalton Streets, as depicted in Figure 3.35, appears to have a wider turning radius for motor vehicles than the southwest corner of the intersection. Wide turning radii induce motor vehicles to travel at high speeds, posing safety risks to pedestrians. We urge the proponent to extend the curb at the southeast corner of the intersection to narrow the turning radius, thus calming traffic and also reducing crossing distances for pedestrians.

Thank you for considering these issues and please feel free to contact us with any questions.

Sincerely,

Wendy Landman
Executive Director

Cc: Vineet Gupta, Boston Transportation Department Charlie Denison, LivableStreets Alliance

Comments on the DEIR/DPIR for the Back Bay/South End Gateway Project

Comments on the DEIR/DPIR for the Back Bay/South End Gateway Project

April 18, 2017

Matthew Beaton, Secretary
Executive Office of Energy and Environmental Affairs (EEA)
ATTN: Alex Strysky, MEPA Office 100 Cambridge Street, Suite 900
Boston MA 02114

Brian Golden, Director
Boston Planning and Development Agency
ATTN: Michael Rooney
One City Hall Square
Boston, MA 02201-­‐1007

RE: Comments on the DEIR/DPIR for the Back Bay/South End Gateway Project
MEPA: #15502

Dear Sirs:

WalkBoston has reviewed the DEIR/DPIR for Back Bay/South End Gateway Project. We are concerned about this project because of its impacts on rail and bus transportation, walking and biking. With the latest submission of plans for the project, we continue to see serious issues with pedestrian access into, through and around the site. These are described below.

  1. Inappropriate relocation of the layover site for the Route 39 bus
    The proposal states that the layover site for the Route 39 bus will be located “off-­‐site.” Back Bay Station is one end of this bus route, which is one of the busiest in the MBTA system, serving Back Bay, the Fenway and Jamaica Plain. Buses congregate here and wait until schedules require them to return to the main route.The proposal for Route 39 is to remove it entirely from the streets directly connected to Back Bay Station, and to truncate the route before it connects with the Orange Line or the commuter rail/Amtrak services. Reducing the convenience of connections between Route 39 and other portions of the MBTA system will result in negative impacts on transit riders that should be avoided. We urge the City and MEPA to require the proponent to bring Route 39 back to the station. A possible layover site is Trinity Place (between Stuart and St. James Streets). The re-­‐routing of the 39 bus route to this layover location could provide a reasonable drop-­‐off and pick-­‐up solution on Stuart Street, which will have direct pedestrian access in Back Bay Station for bus riders.
  2. Sidewalks that surround the site
    Sidewalks along the Dartmouth Street side of the project, where foot traffic is already heavy and likely to increase due to the new development, have been widened to a minimum of 13 feet, as shown in Fig, 3.8b. Sidewalks along Stuart Street are to be a minimum of 11 feet, as shown in Fig, 3.8c, perhaps reflecting the proponent’s projection of likely foot traffic on this side of the site. Along Clarendon Street, sidewalks range from 9 to 15 feet, as shown in Fig. 3.8d; it is not entirely clear if the 9’ width is a result of the footprint of the proposed residential building.Sidewalks may not be sufficiently wide, especially if street trees, planters or bicycle parking are also accommodated in the width otherwise available for pedestrians.A large public plaza is proposed at the Clarendon Street intersection to replace the existing forecourt to the east entrance to the station. Here sidewalks are very wide and the plaza offers generous open space. Much of this plaza appears to be for passive use to people walking by, although there is a retail space provided in one corner that, if used as a restaurant, might result in tables on the outdoor plaza.We are pleased to see that the principal entrance to Back Bay Station on Dartmouth Street is enhanced by the addition of major new entrances framed by the arch and a design that focuses on providing continuity of the sidewalk and interior surfaces to unite them and welcome users. An enlarged Dartmouth Street crosswalk that is 60 feet wide along the site’s frontage will be centered on the new entrance. Taxi zones are provided both north and south of the main entrance.We are pleased that the proponents have increased sidewalk widths by comparison to the earlier proposals.
  3. Movement on sidewalks around the perimeter of the project
    The project site is in a pedestrian-­friendly portion of the city. There are more people walking along and crossing the perimeter streets than there are drivers using these same streets. For example, looking at the existing condition pedestrian volumes counted between 8:00 and 9:00 AM in 2016 in Figure 4.6a, we note that there are 2,253 people crossing Dartmouth in front of Back Bay Station, 1,264 walkers crossing on the east walk of the Stuart Street/Dartmouth Street intersection, 1,098 pedestrians crossing Stuart Street at Trinity Place, and 1,646 pedestrians crossing Stuart Street at Clarendon Street. A total of 1,071 pedestrians crossed the garage driveway on Clarendon Street during this period.Meanwhile, in the same period, Dartmouth Street handles 486 cars northbound and 703 cars southbound. Stuart Street handled 784-­1,057 vehicles in this period and Clarendon Street handled 503-­625 vehicles.Although there are 15 different projections of vehicular traffic under alternative futures, there are no projections at all of pedestrian traffic. There are, however, projections of pedestrian level of service at selected intersections. See Table 4.12.3 page 4-­126. The accompanying text states that PLOS doesn’t change between Existing, No-­build and Build Conditions because walk times and cycle lengths will not change. Is this a valid conclusion without he benefit of projecting future pedestrian volumes?Based on the data that was provided, it appears that there are about three times as many pedestrians as there are cars during peak hours.
  4. Movement across the sidewalk – Dartmouth Street
    In order to improve access to the proposed parking garage, the proponent has proposed changing Turnpike access patterns and partially shifted vehicle access and egress away from Stuart and Clarendon Streets and provided a new exit onto Dartmouth Street. These changes directly affect pedestrian safety at the principal pedestrian access to Back Bay Station.As shown on the proponent’s plans, the proposed vehicular exit from the garage is in an inappropriate location on Dartmouth Street. The exit ramp will pose a hazard for pedestrians on this portion of Dartmouth Street, where thousands of people (see numbers in Section 3 above) are walking during peak hours. This location is an especially busy and important place for pedestrians walking to, through and making connections to transit.Shifting the location of Turnpike access so significantly by removing a major access point to the westbound Turnpike in the midst of Back Bay and requiring all drivers to use alternative access on Huntington Avenue does not make sense for this part of the City. This does not seem an appropriate choice in the context of Boston’s adoption of Vision Zero and the City’s declaration in GoBoston 2030 that Boston will “prioritize the movement of people over cars.”
    WalkBoston does not believe that it is in the interest of public safety and convenience to shift existing vehicular access so that it results in a garage exit ramp in a congested pedestrian zone. An alternative to this garage exit ramp should be developed.
  5. Movement across the sidewalk -­Clarendon Street
    On the Clarendon Street side of the property, there are multiple garage entrances and exits as there are today, and the sidewalk needs very careful treatment to protect pedestrians. The proposal to add a bulb out to shorten the Clarendon mid-­‐block pedestrian crossing is a good idea. As noted above, WalkBoston believes that Clarendon Street is a better location for garage and Turnpike access than the proposed Dartmouth Street garage exit and circuitous Turnpike access.The new plaza on the Clarendon Street side of the property has been designed with a drop-­‐off lane that doubles as a route for delivery and service vehicles for the residential and retail occupants of the structure. The drop-­‐off lane occupies what appears to be about 40% of the plaza, and raises the question of whether it needs to be this size.If the space is being used primarily for vehicular needs – drop-­offs, taxis, deliveries, service, and potential bus storage – that colors the manner that the design might take for the plaza. If, on the other hand, some of the vehicular needs could be transferred to the street – perhaps with some widening to accommodate the intended use. Getting rid of the drop-­off lane would considerably improve the potential for this plaza to be genuinely pedestrian-­friendly, and open it to other retail uses that would enhance the productivity and attractiveness of this end of the property.
  6. The station area concourse
    We are gratified that the proponent enlarged the proposed waiting area, rather than transforming it into a retail facility. However, we continue to be concerned about the redesign 4 of the concourses to narrower passageways lined by many retail facilities. New retail activity will increase in the number of pedestrians to accommodate on the narrowed concourses. The relocation of the commuter rail and Amtrak ticket offices to a new location at a substantial distance from either the waiting area or the entrances to the rail platforms seems ill-­‐advised. The proposed new location is deeper within the station area, much closer to the east entrances than to the likely more important west entrances. It is also indistinguishable from adjacent retail stalls that may or may not have relevance for rail travelers. The proposed layout is occurring during a period of reduction in the number of small retail businesses in many locations, including central Boston and the Back Bay. Active ticket offices in a central location may be more important to bolster other retail outlets, and benefit the management and rental of retail stalls throughout the station area.
  7. Construction on the rail station platforms
    The proposal calls for use of the station platforms for supports for the new high-­‐rise building being built in the Station East portion of the project. These new obstructions narrow the platforms for waiting or alighting passengers and add complexity in an environment where moving to or from access points is already complicated. This is true of both the Orange line platform, serving both directions for subway passengers and the southernmost railway platform serving commuter rail passengers to and from the south and southwest, including Providence, New York, Washington and the entire eastern seaboard.Using the existing rail platforms for construction of these supports will obstruct passenger traffic during construction as well as after completion. Designs should be carefully integrated with existing obstructions such as columns to minimize interference with passenger traffic flow.

We are very concerned about the changes proposed for the station, the bus layover facility, the vehicle circulation, sidewalks and interior passageways. We would appreciate your consideration of our comments and look forward to your responses to them. Please feel free to contact WalkBoston with questions you may have.

Sincerely,

Wendy Landman                                               Bob Sloane
Executive Director                                             Senior Project Manager

 

Cc City Council President Michelle Wu
City Councilor Josh Zakim
Ellis South End Neighborhood Association
Bay Village Neighborhood Association
Neighborhood Association of Back Bay

Garden Garage Project DPIR Comment Letter

Garden Garage Project DPIR Comment Letter

January 17, 2012

Geoff Lewis, Project Manager
Boston Redevelopment Authority
One City Hall Plaza
Boston, MA 02201-1007

RE: Garden Garage Project DPIR

Dear Mr. Lewis:

WalkBoston is the Commonwealth’s leading advocate for pedestrians and safe walking. We work throughout the state encouraging walking, advocating for pedestrian improvements and working for design improvements. We have worked with over 65 communities throughout the state, helping residents and local government with pedestrian issues, safe routes to school, and safer street crossings.

The proponents of the Garden Garage Project have worked hard to include a singular emphasis on pedestrian access to and through the site. We are impressed that the barrier that the existing garage creates between the West End apartments and North Station will be removed. Its replacement with a series of pedestrian paths and a plaza abutting the proposed structures is very welcome as a measure to reinvigorate the pedestrian network in the area.

As the focus of a pedestrian network that will extend from the West End and across Lomasney Way/Nashua Street/Red Auerbach Way, the new project appears to enthusiastically attract walkers along the internal paths that were part of the original Charles River Park Project. Chief among these is the existing, wide Thoreau Path, which will be lengthened to connect directly into paths leading to North Station and toward the river. This is a welcome addition to the path and sidewalk network serving pedestrians. It brings a focus of this network right to the edge of Lomasney Way/Nashua Street/Red Auerbach Way.

We are concerned primarily about the ways in which pedestrians will be served by future pedestrian connections into and across this rather wide and busy intersection. There are two proposed pedestrian crossings that are of concern:

  1. The intersection of Nashua Street, Lomasney Way and Red Auerbach Way, at the northwest corner of the O’Neill Federal Building is at present unsignalized, and has a crosswalk that is perpendicular to the southeast side of Red Auerbach Way. Under the proposed plan, pedestrians accessing this crosswalk from the West End will be forced to follow three segments:
    A. The plaza sidewalks pointing toward North Station.
    B. A dogleg turn from the plaza, to follow Lomasney Way a short distance (which unfortunately involves crossing the two entrance and exit lanes at the mouth of the project garage) to get to this crosswalk.
    C. Another turn is required to cross the street without the protection of a signal.
  2. The intersection of Martha Road and Nashua Street may include a similar dogleg for walkers moving from the proposed plaza to the pedestrian crossing of Martha Road, where sidewalks along Nashua Street lead to the Charles River, the Suffolk County Jail and the present and future structures of Mass General Hospital. At this intersection there is an existing traffic signal, which may mitigate some of the safety implications for an increased flow of pedestrians. If a dogleg is included in these plans, crossing the mouth of the garage on this separate entrance/exit location, it will require careful design to make it safe for pedestrians.

The two street crossings are extremely important to the proposed uses of the paths and plaza in the proposed development. They already have considerable volumes of pedestrian traffic, and will grow substantially when this project is constructed. We suggest that the two crossings be given very careful design review and traffic management and traffic calming design to make sure that they provide a safe environment for the thousands of pedestrians who will use them each day.

Thank you for the opportunity to common on this important project. We think it is a good project that could be even more pedestrian-friendly with some modifications to surrounding traffic signals. WalkBoston will continue to work with the city on this issue and would be pleased to participate in a meeting to review the two crossings.

Sincerely,

Wendy Landman                     Robert Sloane
Executive Director                   Senior Planner