Tag: curb cuts

#ClearCurbCuts links

#ClearCurbCuts links

We’re happy that people have found the need to clear curb cuts an important story. We list media clips on our website, but we’ve listed below some of the social media links and media coverage this particular project received. Please let us know if we missed any others that you’ve seen and we can try and keep this current.

This video was also shared to Twitter & Facebook

Boston Globe: “Letters – Snow removal shouldn’t leave treacherous terrain behind for wheelchair users“
https://www.bostonglobe.com/opinion/letters/2018/01/12/snow-removal-shouldn-leave-treacherous-terrain-behind-for-wheelchair-users/yJPfm14Dy8RGCQTcfppWsN/story.html

South End News: “#ClearCurbCuts”
http://www.mysouthend.com/news//news//254529

WCVB: “Snowbanks, ice leave city an obstacle course“
http://www.wcvb.com/article/snowbanks-ice-leave-city-an-obstacle-course/15065097

WBUR: “Mobility Challenges In The Boston Snow“
http://www.wbur.org/radioboston/2018/01/11/mobility-boston-snow

Beacon Street Multimodal Improvements Comment Letter-Somerville, MA

Beacon Street Multimodal Improvements Comment Letter-Somerville, MA

May 13, 2014

Richard K. Sullivan, Jr.
Executive Office of Energy and Environmental Affairs
Attn: Alex Strysky
100 Cambridge St., Suite 900
Boston MA 02114

Mark Kolonoski
MassDOT Highway Division
Environmental Services Section
10 Park Plaza, Room 4260
Boston, MA 02116

RE: Comments on the Environmental Notification Form for the Beacon Street Multimodal Improvements and Streetscape Enhancement in Somerville, MA

Dear Secretary Sullivan and Mr. Kolonoski:

The Beacon Street project area extends from the bridge abutment at Oxford Street to Dickinson Street, a distance of approximately 1.1 miles. The project is intended to enhance pedestrian and bicycle movements with improved streetscape, wider sidewalks, a new cycle track/bicycle lanes, and new ADA compliant curb ramps. The project goal is to enhance the multimodal connectivity of the Beacon Street Corridor.

We have reviewed this project and offer the following comments:

1. Updated and continuous sidewalks on Beacon Street
The program for complete streets along Beacon Street will result in new cycle tracks and a significant reconstruction of both the street and the sidewalk. Sidewalks are to be updated and rebuilt to correct current deficiencies, including substandard slopes and lack of ramps at intersections. A sidewalk will be added to the south side of Beacon Street in a location where no sidewalk now exists. Adherence to this plan is essential for the safety and convenience of all users of the sidewalk.

The proposed sidewalks will replace the existing 10’-11’ wide sidewalks with new ones of substantially the same width. Retention of this dimension as a minimum is extremely important because some space within the sidewalk will accommodate other uses, such as trees. In only one portion of Beacon Street, where there are space constraints due to an existing stonewall, will the 10’-11’ width be precluded; we note
that no trees are planned for the sidewalk in this section.

2. Cycle tracks and bike lanes
Cycle tracks are proposed between Oxford Street and Museum Street, bike lanes between Museum Street and Park/Scott Streets, cycle tracks between Park/Scott Streets and Washington Street and bike lanes between Washington Street and the Cambridge City line. On the north side of the street, the alignments of the cycle tracks and bike lanes are end-to-end, resulting in a virtually straight path for the full length of
the project.

On the south side of the street the cycle tracks and bike lanes do not quite line up. The transitions between cycle tracks and bike lanes at the intersection of Beacon Street/Museum Street and Park Street/Washington Street are angled to accommodate the needed connections between cycle tracks and bike lanes. These intersections have crosswalks where pedestrians will cross near the bike routes. Since separate traffic signals for bicycles are not included in the project, WalkBoston is concerned that walkers may not be aware that bicycles are approaching at these intersections and need to be especially careful because these diversions might distract the cyclists or the
motorists. We request that special signage and/or pavement markings be provided to alert walkers, bicyclists and drivers of these shifts in alignment and the need to be aware of movements by others.

3. Separation of cycle tracks and sidewalks
In several locations, the proposed cycle tracks are immediately adjacent and at the same grade as the sidewalk. In effect the cycle track will be located on an extension of the sidewalk. A pronounced and clear separation between bicyclists and walkers is needed to deter cyclists from using the sidewalk to bypass slower moving bikes. The
starting and stopping of cycle tracks and bike lanes may be confusing and lead to cyclists using the sidewalks to avoid merging into traffic or worrying about people opening car doors directly in front of them.

Since all 208 of the street trees included this project are to be planted within the width of the sidewalk, we assume that they will help to separate the cycle track from walkers. Other street furniture such as the existing utility and lighting poles, or new benches, trash containers, bollards or signs might also help. The precise location of each element should be carefully considered, as they have the potential to interfere with pedestrian or bicycle movements.

4. Placement of trees
Although the sidewalks are 10 feet wide in nearly all locations along Beacon Street, some of that width – perhaps up to 5 feet – will be lost due to the planting of 208 trees directly in the sidewalk. All of the proposed new trees should be placed in long narrow tree pits (we have seen tree pits that are 2’ wide by 6’-8’ long). More typical 4-foot square tree pits that intrude into the sidewalk should not be used. Irrespective of the shape of the tree pit, tree grates and or special permeable but sturdy filler (similar to that used in some South End locations) should be explored. This is important for the safety of walkers, as is the long-term maintenance of the tree pits so that they do not pose tripping hazards for walkers or for the visually-impaired.

5. Traffic signals at crosswalks and mid-block
New traffic signal equipment and signal timing at the intersections of Beacon Street with Park/Scott and Washington Streets are planned. In addition, two High-Intensity Activated crossWalK (HAWK) pedestrian signals on mast arms are planned for pedestrian crossings at the Sacramento Street intersection and at the Buckingham/Cooney intersection. The project thus appears to have signals of some sort at intervals of about ¼ mile; however, in the portion of Beacon Street between Sacramento Street and the rail overpass at Somerville Avenue, the intersections with Oxford and Prentiss Streets have no traffic signals. With no signals to slow traffic these mid-block crossings may be difficult for pedestrians. Signage or other warnings may be essential to inform drivers and cyclists of the crosswalks.

6. Crosswalk paving
The proposed use of concrete pavers at crosswalks has been cited by one of our members as a hazard for nearly all walkers, and we agree. For all crosswalks on Beacon Street, the customary white reflective thermoplastic strips should be used. Pavers have low visibility and are uneven, making it harder for wheelchairs, seniors, and people pushing strollers or grocery carts.

7. Pedestrian signal phasing
At existing signal locations the exclusive pedestrian phase will be replaced with concurrent pedestrian phasing. For all new signals, a leading pedestrian interval (LPI) is proposed to allow pedestrians to enter the crosswalk before vehicles approaching the intersection have a green signal indication. It will be important to coordinate the LPI at each signalized intersection with any preferential treatment given to bicycles at the same location, to avoid potential conflicts.

8. Signage
There is a need for sidewalk and cycle track signs that make it clear to walkers, bicyclists and drivers how the cycle tracks function. In particular, since all the street’s users will be unfamiliar with cycle tracks it will be important to let pedestrians know what to expect in bicycle movements adjacent to them. Signs should advise bicycles to stay within the cycle tracks and avoid using the sidewalks. Signs should advise walkers of approaching bicycle traffic,places to wait before crossing the street, and to not walk in the cycle tracks. Specific notice should be given to cyclists and pedestrians of potential conflicts at intersections, where turning bicycles, vehicles and pedestrians present many different movements.

9. Lighting
New street lighting has not been proposed, and cyclists may be ‘invisible’ to walkers and drivers. The City should explore the need for additional lighting, especially at intersections where so many different movements will be taking place. In addition, as part of the introduction of the cycle track, the City should explore the opportunity to market and enforce state laws requiring bicycles to carry white front lights on bicycles visible that are visible from 500 feet. WalkBoston has received comments from a number of our older members that they find it impossible to see bicyclists approaching at night if they do not use head lights, and with the addition of a sidewalk level cycle track they are very nervous about crossing the track at intersections.

10. Driveways
A great number of private driveways will be accommodated with this design, with each rebuilt to cross both sidewalk and bicycle facilities. The north side of the street has 43 driveways and the south side has 30. Most of the driveways are narrow, and will involve drivers who will back out to reach Beacon Street. Drivers backing vehicles into the street may have obstructions that limit abilities to see approaching walkers, runners or cyclists.

11. Speed control
Speeds on local streets that are primarily residential such as Beacon Street should be strictly regulated. The current 30-mph limit should not be raised. It should be made lower with advisory signs if possible. Reminder signs should be posted at intervals along the route to warn drivers not to go faster.

Thank you for the opportunity to comment on this project. Please feel free to contact us if you should have questions.

Sincerely,

Wendy Landman
Executive Director

Robert Sloane
Senior Planner

Blind man walking (and running)!

Blind man walking (and running)!

image

Kyle Robidoux is the Director of  Volunteer & Support Group Services at the Mass. Assoc. for the Blind & Visually Impaired.

I walk everywhere. As a marathoner, I also run all throughout Boston and neighboring cities.

I’m also legally blind so walking, along with public  transit, is my main mode of transportation. Therefore,  walkability is very important to me and my family.

The walkability of the city and its public infrastructure impacts me every day. It impacts where I walk, how quickly I can get to where I need to be, and most importantly how safely I can get there.

As someone with low vision (I have very restricted central vision, similar to looking through a toilet paper roll), I rely on sidewalks, curb cuts and ramps, and crosswalks to get me safely to where I need to be. I use a white cane most of the time so the quality of sidewalks and streets is very important.

Brick sidewalks are one of the most unfriendly surfaces for me and most folks with limited mobility (I assume most sighted walkers, too). My cane tip frequently gets stuck in a missing brick or I trip because of the unevenness of the sidewalk. Old (some say historic) sidewalks are very common in the South End, where I spend a good majority of my time. If I have a choice, I will avoid going down a street if I know it has terrible brick sidewalks. I’m thankful that the city has set a new policy limiting the amount of brick in the walk path when repairing/installing new sidewalks.

As my eyesight decreases, I am becoming more reliant on audible street crossings. Otherwise, I have to ask someone to help me find the push button. It would be wonderful if more street crossings had regular intervals in which to cross or a “walk signal” triggered by a sensor on the closest curb ramp.

My relationship to the built environment in my neighborhood plays a large factor as my eyesight decreases, especially during the winter. Trying to navigate unshoveled sidewalks and curb cuts blocked by snowbanks is physically and mentally exhausting. I walk my daughter to school along the South Bay Harbor Trail. Sections of the trail were not plowed this winter days after a snowstorm. Some days my daughter and I, along with other students, were forced to walk in the street because the unplowed path was too difficult to walk.

As our communities continue to develop, I hope less time and energy is spent on talking about parking and traffic and more on creating accessible public spaces.

Creating accessible spaces is not only good public policy but will also ensure that they flourish and reach their greatest potential.

This article was featured in our Spring 2014 newsletter. See the full newsletter & past editions here.

——————————————————————————————————————-
Join our Mailing List to keep up to date on advocacy issues.

Like our work? Support WalkBoston – Donate Now!
Connect with us on Twitter and Facebook

Government Center Garage Redevelopment Environmental Notification Form EOEA #15134

Government Center Garage Redevelopment Environmental Notification Form EOEA #15134

February 7, 2014

Secretary Richard K. Sullivan, Jr.
Executive Office of Energy and Environmental Affairs (EEA)
100 Cambridge Street, Suite 900
Boston MA 02114

RE: Comments on the Government Center Garage Redevelopment Environmental Notification Form (ENF)

EOEA #15134

Dear Secretary Sullivan,

WalkBoston appreciates the opportunity to provide comments on the Environmental Notification Form (ENF) for the Government Center Garage Redevelopment.

The proposal calls for partial demolition of the underutilized Government Center Garage as an early action, with subsequent demolition and redevelopment to take place over a number of years. Initial demolition will result in opening Congress Street to daylight and allowing redevelopment of the East Parcel, including a new public plaza and pedestrian connection between the Bullfinch Triangle and Greenway. The east parcel is a critical pedestrian link between Downtown Boston and North Station/Bulfinch Triangle, as well as a link to the Rose Kennedy Greenway. The total development will include 812 new housing units, 196 new hotel rooms, over one million gross square feet of office, and 82,500 gross square feet of retail. The garage will continue to provide sufficient parking for the new onsite uses, commercial parking for transient users as well as overnight resident parking.

We offer the following comments:

1. We believe the proposed development will improve the area for pedestrians compared to existing conditions. The existing garage is a large, foreboding structure from the pedestrian viewpoint. While the potential removal of the garage and the reopening of Congress Street to the sky is appealing in its own right, the proposed development offers additional benefits. As the project is refined during subsequent reviews, MEPA and the BRA must ensure that these benefits are not lost during revisions or project changes. We trust that any project approval will condition the following proposed improvements to ensure they are included in the final design:

  • The removal of overhead parking decks and associated office space, returning sunlight to Congress Street.
  • The proposed pedestrian-only extension of Canal Street through the newly-configured east parcel that greatly benefits heavy rush-hour foot traffic to/ from North Station.
  • The narrowing and redesign of Sudbury Street, including elimination and replacement of angled Police Department parking from the right-of-way.
  • The extension of Bowker Street to make it a through street, eliminating the stairs between Sudbury Street and the existing dead end of Bowker Street.
  • The project could potentially provide very substantial benefits that would have a lasting effect on the built environment of the immediate neighborhood and the entire downtown core of Boston. Careful attention must be paid to the pedestrian experience in and around the site to take advantage of its tremendous pedestrian and transit access. The project is positioned to capitalize on these features and it is incumbent upon MEPA, the BRA and the City of Boston to ensure that the final design fully accounts for these opportunities.

2. Curb cuts for the garage – All curb cuts provided for the new garage should be kept to a minimum width, should enter the street at a right angle, and should be at sidewalk grade (no curb cut for pedestrians). Appropriate vehicle exiting warning signs must be provided for pedestrian safety. The existing garage access drives are too wide and pedestrians on the sidewalk are often threatened by automobiles traveling at high speeds into and out of the garage’s overly wide parking access ramps.

3. MBTA on-site improvements – The project should not interfere with normal MBTA bus operations, and allowance must be made for continued bus and subway service connections on-site. The proponent and the MBTA should commit to additional design work to improve the walking environment in this area to accommodate the large number of pedestrians using transit, along with the additional pedestrian volumes that will be generated by this very large project.

4. Hawkins and Bowker Streets – Bowker Street should become a through street with a changed gradient that allows an ADA compliant sidewalk. If Hawkins Street cannot also be made a through street, the stairs that connect its dead-end at Sudbury Street should be re-graded into an ADA compliant sidewalk.

5. North End Access – While the project claims to reconnect long divided Boston neighborhoods, it fails to offer the North End the same pedestrian benefits it does for the West End, Government Center and Bullfinch Triangle. In fact the project design seems to turn its back on the North End. A North End pedestrian connection should be explored in greater detail. The connection should work to interconnect the north-south walkway through the east parcel, North End residents, the two Green and Orange Line MBTA subway stations, and the Greenway.

6. Walk Signals – The existing pedestrian walk signals at the intersection of New Chardon Street and Canal Street will need to be adjusted. The pedestrian service from Canal Street through the newly configured east parcel will siphon existing North Station foot traffic away from adjacent streets. As a result, this pedestrian walk signal and the narrow mid-crossing island may be overwhelmed by the additional foot traffic on Canal Street. All walk signals on New Chardon, Friend, Sudbury and Merrimac Streets should be adjusted to handle the additional pedestrian traffic that the project will create.

7. Narrowing Sudbury and New Chardon Streets – A detailed study of the potential for narrowing both Sudbury and New Chardon Streets is essential. Such a study should include provisions for wider sidewalks, coordinate with improvements being planned for neighboring streets as part of the Crossroads Initiative and potential bike lanes. Further pedestrian crossing improvements should be explored including the elimination (or infill) of the truck turning lanes at the corner of Merrimac Street and New Chardon Street, and at the corner of New Chardon Street and Congress Street.

8. Other pedestrian ways – The document does not address whether the proponent will maintain or improve pedestrian connections that skirt the northwestern edge of the site, from New Chardon Street, up the Brattle Way pedestrian mall and ultimately out towards Cambridge Street. This pedestrian mall/walkway and associated small park area is well used during the day and it should be considered with the project’s design. The short length of Brattle Way could be an excellent candidate for expanded pedestrian use.

Thank you for the opportunity to comment on the ENF for the Government Center Garage Redevelopment. We believe this site provides an opportunity to develop a transit-oriented, mixed-use project that could showcase pedestrian friendly sidewalks and streets. We hope our comments on the ENF/PNF are incorporated into your requirements for the next phase of design and permitting documents.

Please contact us for any clarification or additional comments that would be useful.

Sincerely,

Wendy Landman                                    Robert Sloane
Executive Director                                  Senior Planner

School Walkability Assessments Woburn Summer 2013

School Walkability Assessments Woburn Summer 2013

A safe and enjoyable walking environment is crucial to encouraging more students to walk to school and more community members to choose to walk. WalkBoston and the City of Woburn’s planning department conducted walkability assessments at five of Woburn’s public schools in the summer of 2013. The schools included:

1. Altavesta Elementary School
2. Goodyear Elementary School
3. Linscott Elementary School
4. Reeves Elementary School
5. Joyce Middle School

This report identifies issues with the existing condition of the pedestrian environment and recommends strategies and infrastructure improvements to enhance walking safety, especially for children walking to and from school. Many of the observations relate to vehicular speed, visibility for both pedestrians and drivers, and street crossings. Lower-cost solutions are emphasized, but longer-term, more costly investments are also suggested.

Read the full report here:
WalkBoston-SchoolWalkabilityAssessments-Woburn-Summer2013