Tag: crosswalks

1000 Boylston Street Comment Letter

1000 Boylston Street Comment Letter

March 8, 2018

Michael Rooney
Boston Planning and Development Agency
One City Hall, Ninth Floor
Boston, MA 02201

RE: WalkBoston comments on 1000 Boylston Street

Dear Michael:

WalkBoston appreciates the opportunity to comment on the Draft Project Impact Report (DPIR) for the proposed development at 1000 Boylston Street in the Back Bay. This project will significantly improve the pedestrian realm by activating a currently desolate stretch of sidewalk with new ground-floor retail uses and streetscape improvements.

We encourage the proponent to clarify their plans for crosswalk improvements. The orientation of pedestrian ramps to crosswalks is not clearly discernable from Figure 3.35 in the DPIR (“Streetscape Improvement Plan”), but several crosswalks as depicted appear to utilize apex ramps, meaning that a single ramp at a street corner serves two crosswalks at a 45-degree angle to both. Such ramps can have the unintended consequence of directing people with visual impairments or mobility aids into the middle of the intersection, posing hazards to their safety. To avoid this WalkBoston recommends the utilization of two perpendicular ramps at street corners, such that each ramp serves one crosswalk at a direct approach. We urge the proponent to explicitly incorporate such perpendicular ramps into their streetscape designs at the intersections of Boylston/Dalton/Hereford Streets and St. Cecilia/Cambria Streets, and to adjust the placement of crosswalks accordingly as needed.

In addition, the southeast corner of the intersection of Boylston/Dalton Streets, as depicted in Figure 3.35, appears to have a wider turning radius for motor vehicles than the southwest corner of the intersection. Wide turning radii induce motor vehicles to travel at high speeds, posing safety risks to pedestrians. We urge the proponent to extend the curb at the southeast corner of the intersection to narrow the turning radius, thus calming traffic and also reducing crossing distances for pedestrians.

Thank you for considering these issues and please feel free to contact us with any questions.

Sincerely,

Wendy Landman
Executive Director

Cc: Vineet Gupta, Boston Transportation Department Charlie Denison, LivableStreets Alliance

Comments on Suffolk Downs redevelopment (EEA No. 15783)

Comments on Suffolk Downs redevelopment (EEA No. 15783)

January 25, 2018

Mayor Brian Arrigo
ATTN: Robert O’Brien, Director of Economic Development
City of Revere
281 Broadway
Revere, MA 02151

Secretary Matthew Beaton
ATTN: Page Czepiga, MEPA Analyst
Executive Office of Energy and Environmental Affairs
100 Cambridge Street, Suite 900
Boston, MA 02114

Director Brian Golden
ATTN: Tim Czerwienski, Project Manager
Boston Planning and Development Agency
One City Hall, Ninth Floor
Boston, MA 02201

RE: WalkBoston comments on Suffolk Downs redevelopment (EEA No. 15783)

Dear Mayor Arrigo, Secretary Beaton and Director Golden:

Thank you for the opportunity to comment on HYM Investment Group’s proposed redevelopment of the Suffolk Downs site in East Boston and Revere. WalkBoston looks forward to working with the City of Revere, EEA, BPDA, HYM, and other agencies and project stakeholders to help advance the proponent’s stated goal of “creating a vibrant, mixed-use walkable community.”

Leveraging connections between walkability and transit

The proponent’s Expanded Project Notification Form (EPNF) reflects a strong commitment in principle to walkability and multimodal transportation connectivity. The proposed Phase 1 project emphasizes new pedestrian connections at the Suffolk Downs Blue Line station on the MBTA, and the Master Plan project is similarly premised upon pedestrian access to and from the Blue Line at Suffolk Downs and Beachmont Stations. Overall the Suffolk Downs site is wellpositioned for walkable transit-oriented development, which is reflected in HYM’s high anticipated mode shares for walking and transit for the Master Plan project. (The projected mode shares for walking range from 10.9% for office uses to 19.6% for residential uses; the projected mode shares for transit range from 45.4% for residential uses to 54.7% for hotel uses.)

The Phase 1 project has a much lower projected transit mode share of 37.5%, as well as a 44.4% projected mode share for single occupancy vehicles. We are concerned that this will create significant auto dependency from the onset of this project that will affect the future Master Plan development as well. The proponent states that “while there will be emphasis to support a high proportion of alternative trip making by the Phase 1 Project, this more conservative mode share profile has been utilized given the Phase 1 buildings are being analyzed as a standalone project without the benefit of a mixed-use environment.” We urge the proponent to aim for more ambitious transit, walking and biking mode share goals for the Phase 1 development to maximize the site’s potential for transit-oriented development.

The proponent also anticipates over 54,000 new transit trips per weekday, including over 4,000 trips during the morning peak hour and over 5,000 trips during the evening peak hour. This number is very high relative to current Blue Line ridership levels. As part of their transit analysis for the Draft Environmental Impact Report (DEIR), HYM should detail how they arrived at this number and how Blue Line ridership will change as the Master Plan project is phased in over time. This analysis should be accompanied by the proponent also clarifying their plans to invest in capacity upgrades along the Blue Line as part of a broader package of Transportation Demand Management (TDM) strategies.

Exploring opportunities to reduce single occupancy vehicle trips and parking spaces

While the high projected transit mode share and ridership are positive attributes of this development proposal, the proponent still projects over 33,000 new vehicle trips per weekday, including over 3,000 trips during the morning peak hour and over 3,000 trips during the evening peak hour. This increased vehicular traffic has the potential to significantly affect congestion and pedestrian safety within the project site and along surrounding roadways. Given that vehicular access to the site is limited to just two intersections (Route 1A/Tomasello Way and Winthrop Avenue/Tomasello Way), the proponent should clarify how the project site and surrounding streets will handle this traffic in the DEIR. Significant mitigation measures will be necessary to address 33,000 new vehicles on already congested streets.

While HYM does not specify how many new parking spaces will be needed to accommodate these vehicles, WalkBoston calculates that between 10,800 and 16,200 new spaces will be necessary, depending on the development program and parking ratios used. (The proponent states that the following parking ratio ranges should adequately support the Master Plan project’s parking demand into the future: residential, 0.5 to 1.0 spaces per unit; office, 1.0 spaces per 1,000 SF; lab, 1.0 spaces per 1,000 SF; hotel: 0.5 spaces per room; retail: 0.5 spaces per 1,000 SF). We are encouraged by the relatively low proposed parking ratios for the residential units, as well as HYM’s broader recognition that auto trip rates are likely to decrease over time. The final residential parking ratio should be as close to 0.5 spaces per unit as possible and we look forward to reviewing HYM’s TDM plans as part of the DEIR. Any strategies and mitigation measures proposed must further enhance walkability, bikeability and transit access, while reducing single occupancy vehicle use and the associated need for parking.

Exploring opportunities for bus/shuttle connectivity and related pedestrian access

HYM notes that there are several MBTA bus lines (450, 459 and 119) along Route 1A and Winthrop Avenue within a half-mile walk of the project site, and that “there are opportunities to expand MBTA bus service into the project site and provide for internal site transportation/shuttle to further improve access to public transit” as the Master Plan project is built out. The proponent should further explore and detail these options as part of their TDM plans in the DEIR, as increased utilization of MBTA buses and/or shuttles can reduce single occupancy vehicle use. An analysis of bus/shuttle options should examine the potential for increased service on existing MBTA bus lines and associated changes in ridership, as well as the potential to service the neighborhoods surrounding the project site. The proponent should also clarify their plans for investing in such services, whether through funding the MBTA or their own shuttles.

Ensuring that pedestrians can safely and comfortably walk to and from bus/shuttle stops is critical to ensuring that these services will be utilized. Ideally bus/shuttle stops will be located within a quarter-mile of the project site to maximize their usage. We appreciate HYM’s commitment to improving sidewalks adjacent to the project site to meet ADA standards and to include street trees if feasible, as well as their acknowledgement of the need for mitigation measures and infrastructure improvements at the site’s primary vehicular access points (Route 1A/Tomasello Way and Winthrop Avenue/Tomasello Way). The proponent states that “geometric and traffic signal improvements will be recommended at both of these intersections to optimize traffic operations.”

Improvements at these locations must also address pedestrian safety and traffic calming. HYM plans to widen Tomasello Way and Route 1A as part of the Master Plan improvements, yet there are no crosswalks across Route 1A near the project site and the crosswalk across Tomasello Way at Route 1A is already 140 feet wide with minimal pedestrian refuge. Any signal and roadway upgrades at this location and near other shuttle/bus stops must provide safe pedestrian crossings and well-timed WALK signals that provide countdowns and leading pedestrian intervals. Long crossing distances should be reduced as much as possible using curb extensions, and pedestrian refuges should be created and enhanced to provide protected waiting areas. In extreme circumstances, the proponent might consider working with the MBTA to relocate bus stops to more pedestrian-friendly locations.

Creating a walkable project site that meets Complete Streets standards

In addition to leveraging pedestrian access to and from the Blue Line, the proponent has integrated walkability and pedestrian connectivity into many other aspects of their redevelopment proposal. These include creating a new interior street network on site that meets Boston Transportation Department’s (BTD) Complete Streets guidelines, developing a system of multi-use ADA-compliant paths and trails that connects to adjacent neighborhoods and regional path networks, and activating the public realm with open space amenities and extensive ground-floor retail. Creating streets, sidewalks and paths that accommodate road users of all abilities and travel modes is critical to developing more livable and walkable communities, so WalkBoston is pleased to see a commitment to these issues in the EPNF.

We look forward to seeing more detailed plans for the interior streets, paths, intersections and signals as part of the DEIR. The interior streets should be designed to ensure that vehicles follow a 20 mile per hour speed limit to maximize walking safety as well as walking and transit mode shares. They should also include additional measures for pedestrian safety and traffic calming, including narrow vehicular travel lane widths, frequent and well-marked crosswalks, and well-timed WALK signals that provide countdowns and leading pedestrian intervals. We encourage the proponent to maintain their current plans to not have vehicular access to the project site from Bennington Street or Waldemar Avenue, thus prioritizing multimodal connectivity and reducing the potential for increased local traffic.

Improving pedestrian safety throughout the project study area

The need for traffic mitigation is not limited to the immediate project vicinity and access points. To this end, HYM states that a mitigation program will likely focus on improvements to roadway geometry, traffic signals, and multimodal mobility along the broader Route 1A and Winthrop Avenue corridors, as well as Furlong Drive, the on-site roadway network, and other nearby intersections. The proponent also notes that many of the broader study area intersections are located within Highway Safety Improvement Program (HSIP) clusters and thus are potentially subject to Road Safety Audits (RSAs) per Massachusetts Department of Transportation guidelines. WalkBoston looks forward to reviewing a more detailed discussion of the Master Plan project mitigation phasing and recommendations for the timing of specific roadway improvement projects as part of the DEIR. We are also available to participate in future RSAs as needed. Once again, we encourage utmost consideration for pedestrian safety and traffic calming measures as part of any improvement packages.

Thank you again for considering these issues and feel free to contact us with any questions.

Sincerely,

Wendy Landman
Executive Director

Cc: House Speaker Robert DeLeo
Senate President Harriette Chandler
Senator Joseph Boncore, Transportation Co-Chair
Representative William Strauss, Transportation Co-Chair
Representative Adrian Madaro
Boston City Council President Andrea Campbell
Boston City Councilor Michelle Wu, Transportation Chair
Boston City Councilor Lydia Edwards, District 1
Revere City Council President Jessica Giannino
Revere City Councilor Steven Morabito, Economic Development and Planning Chair
Revere City Councilor Joanne McKenna, Ward 1
Becca Wolfson, Boston Cyclists Union
Stacey Thompson, LivableStreets Alliance
Andre Leroux, Massachusetts Smart Growth Alliance
Richard Fries, MassBike Marc Ebuña, TransitMatters
Chris Dempsey, Transportation for Massachusetts

Melrose High School/Middle School Campus Bicycle and Pedestrian Accessibility Project: Final Report

Melrose High School/Middle School Campus Bicycle and Pedestrian Accessibility Project: Final Report

WalkBoston and WatsonActive observed Middle School/High School arrival on April 25 and 27, 2017. Dismissal was not observed, as the traffic and safety issues identified by the key informants were focused on arrival. Additional infrastructure observations were also made.

The City Engineer requested a preliminary report recommending a project for possible inclusion in the City’s Complete Streets Prioritization Plan. WalkBoston and WatsonActive delivered a report of infrastructure recommendations for Melrose Street on April 28, 2017.

With the assistance of the MassDOT Safe Routes to School Program, online travel surveys were administered for both the High School and Middle School. These surveys collected information about how far away from school students live and their travel modes in the morning and afternoon. An additional parking survey was administered only to High School students who drive themselves to school. The High School travel and parking surveys were administered to students during class on June 6, 2017.

The Middle School travel survey was made available to Middle School parents from May 24 to June 12, 2017. Due to low initial participation, the Middle School travel survey was re-administered from June 14-30, 2017.

High School student focus groups were conducted on June 13, 2017 at Melrose High School.

Read the full report here:

WalkBoston-MelroseCampusBikePedProject-Final Report

Ashley Park Walk Audit

Ashley Park Walk Audit

The City of New Bedford was awarded a Safe Routes to Parks (SRTP) technical assistance grant from the National Parks and Recreation Association. The goal of the SRTP program is to increase safe access to parks and improve health outcomes in underserved areas. Using Ashley Park in New Bedford’s South End Neighborhood as a pilot park, WalkBoston worked with New Bedford City staff to develop a process of assessing the walking routes to the park. Lessons learned from this walk audit and pilot project will inform future park evaluations in New Bedford.

 

Read the full report here:
WalkBoston-AshleyParkWalkAudit-NewBedford

Springfield – Liberty Heights Walk Assessment

Springfield – Liberty Heights Walk Assessment

On September 26, 2017, WalkBoston conducted a walk assessment in the Liberty Heights neighborhood of Springfield, with support from the Massachusetts Executive Office of Public Safety and Security (EOPSS) Pedestrian Safety Planning Initiative for High-Fatality Communities. The goal of the walk assessment was to recommend improvements to the local built environment that improve pedestrian safety.

Read the full report here:
WalkBoston-LibertyHeightsWalkAssessmentEOPSS-Springfield